DCL-93-181, Forwards Diablo Canyon Power Plant Unit 2 Cycle 6 Startup Rept

From kanterella
Jump to navigation Jump to search
Forwards Diablo Canyon Power Plant Unit 2 Cycle 6 Startup Rept
ML20046A659
Person / Time
Site: Diablo Canyon 
Issue date: 07/21/1993
From: Rueger G
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20046A660 List:
References
DCL-93-181, NUDOCS 9307290177
Download: ML20046A659 (1)


Text

.

4 Pacific Gas and Electric Company 77 Beale Sheet fk.om 13.il Gregory M Rueger F 0 Box 770000 Senior Vte President and '

Sr f ranasto. C A 9',177 Genera! Manager 415/973-4fA4 Nuclear Power Generabon Far U5/973-2313 July 21, 1993 PG&E Letter Nc. DCL-93-181 ff,;'!

U.S. Nuclear Regulatory Comnission

w ATTN

Document Control Desk

- 4

!q Washington, D.C.

20555 Re:

Docket No. 50-323, OL-DPR-82 Diablo Canyon Unit 2 Unit 2 Cycle 6 Startup Report Gentlemen:

Enclosed is a summary report of Diablo Canyon Unit 2 Cycle 6 startup and i

power escalation testing following fuel loading.

The transition to Vantage 5 fuel in the Unit 2 core is now complete, although PG&E may return selected standard fuel assemblies to future cores.

Sir cerely, h@h y--

Gregory M. Rueger cc:

90bby H. Faulkenberry A,n P. Hodgdon Miry H. Miller j

Sheri R. Peterson CPUC Diablo Distrf'; ion Enclosure 6151S/85K/JHA/1881 l

h 9 5c n c, n,

/

'l-s 9307290177 93o721 79, PDR ADOCK 05000323 pij P

PDR gj