Text
.
4 Pacific Gas and Electric Company 77 Beale Sheet fk.om 13.il Gregory M Rueger F 0 Box 770000 Senior Vte President and '
Sr f ranasto. C A 9',177 Genera! Manager 415/973-4fA4 Nuclear Power Generabon Far U5/973-2313 July 21, 1993 PG&E Letter Nc. DCL-93-181 ff,;'!
U.S. Nuclear Regulatory Comnission
- w ATTN
Document Control Desk
- 4
!q Washington, D.C.
20555 Re:
Docket No. 50-323, OL-DPR-82 Diablo Canyon Unit 2 Unit 2 Cycle 6 Startup Report Gentlemen:
Enclosed is a summary report of Diablo Canyon Unit 2 Cycle 6 startup and i
power escalation testing following fuel loading.
The transition to Vantage 5 fuel in the Unit 2 core is now complete, although PG&E may return selected standard fuel assemblies to future cores.
Sir cerely, h@h y--
Gregory M. Rueger cc:
90bby H. Faulkenberry A,n P. Hodgdon Miry H. Miller j
Sheri R. Peterson CPUC Diablo Distrf'; ion Enclosure 6151S/85K/JHA/1881 l
h 9 5c n c, n,
/
'l-s 9307290177 93o721 79, PDR ADOCK 05000323 pij P
PDR gj