DCL-22-033, Annual Report of Occupational Radiation Exposure for 2021
ML22116A174 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 04/26/2022 |
From: | Petersen D Pacific Gas & Electric Co |
To: | Document Control Desk, Office of Nuclear Regulatory Research |
References | |
DCL-22-033 | |
Download: ML22116A174 (1) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Annual Operating Report
MONTHYEARML24003A7212023-11-27027 November 2023
[Table view]Independent Safety Committee; Diablo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety July 1, 2022-June 30, 2023 ML23318A2092023-09-13013 September 2023 Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 1 (Main Report) ML23318A2082023-09-13013 September 2023 Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 2 (Exhibits) DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 ML23037A8312022-09-28028 September 2022 Independent Safety Committee; Thirty-Second Annual Report on the Safety July 1, 2021 - June 30, 2022, Volume II - Exhibits ML23037A8302022-09-28028 September 2022 Independent Safety Committee; Thirty-Second Annual Report on the Safety July 1, 2021 - June 30, 2022, Volume I - Main Report ML23041A3772022-06-30030 June 2022 Independent Safety Committee Thirty-Second Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations July 1, 2021-June 30, 2022 DCL-22-033, Annual Report of Occupational Radiation Exposure for 20212022-04-26026 April 2022 Annual Report of Occupational Radiation Exposure for 2021 DCL-2021-514, NPDES Receiving Water Monitoring Program: 2020 Annual Report2021-04-27027 April 2021 NPDES Receiving Water Monitoring Program: 2020 Annual Report DCL-19-078, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20182019-10-0303 October 2019 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2018 DCL-18-028, Submittal of 2017 Annual Radioactive Effluent Release Report2018-04-24024 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report DCL-18-032, Summary Report of 10 CFR 50.59. Changes, Tests, and Experiments, for the Period of January 1, 2016, Through December 31, 20172018-04-18018 April 2018 Summary Report of 10 CFR 50.59. Changes, Tests, and Experiments, for the Period of January 1, 2016, Through December 31, 2017 DCL-17-075, Transmittal of 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20162017-09-0606 September 2017 Transmittal of 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2016 DCL-16-105, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20152016-10-18018 October 2016 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2015 DCL-2016-518, NPDES Receiving Water Monitoring Program: 2015 Annual Report2016-04-25025 April 2016 NPDES Receiving Water Monitoring Program: 2015 Annual Report DCL-16-045, Submittal of 2015 Annual Radiological Environmental Operating Report2016-04-21021 April 2016 Submittal of 2015 Annual Radiological Environmental Operating Report DCL-16-046, Summary Report of 10 CFR 50.59, Changes, Tests, and Experiments, for the Period of January 1, 2014, Through December 31, 20152016-04-18018 April 2016 Summary Report of 10 CFR 50.59, Changes, Tests, and Experiments, for the Period of January 1, 2014, Through December 31, 2015 ML15117A6572015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 3 of 5 ML15117A6622015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 5 of 5 ML15117A6602015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 4 of 5 DCL-15-046, 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 1 of 52015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 1 of 5 ML15117A6562015-04-27027 April 2015 2014 Annual Radiological Environmental Operating Report for the Year 2014) - Part 2 of 5 DCL-13-077, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20122013-07-30030 July 2013 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2012 DCL-13-058, Annual Commitment Change Summary Report2013-05-30030 May 2013 Annual Commitment Change Summary Report DCL-13-029, Annual Radiological Environmental Operating Report2013-04-30030 April 2013 Annual Radiological Environmental Operating Report DCL-13-045, Annual Nonradiological Environmental Operating Report2013-04-30030 April 2013 Annual Nonradiological Environmental Operating Report DCL-13-042, Submittal of 2012 Annual Radioactive Effluent Release Report2013-04-30030 April 2013 Submittal of 2012 Annual Radioactive Effluent Release Report DCL-13-022, Annual Report of Occupational Radiation Exposure for 20122013-03-12012 March 2013 Annual Report of Occupational Radiation Exposure for 2012 DCL-12-117, 2011 Annual Commitment Change Summary Report2012-11-20020 November 2012 2011 Annual Commitment Change Summary Report DCL-12-070, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20112012-07-19019 July 2012 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2011 DCL-12-040, 2011 Annual Radioactive Effluent Release Report2012-04-30030 April 2012 2011 Annual Radioactive Effluent Release Report ML1120101782011-07-19019 July 2011 Diablo Canyon, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2010 DCL-11-082, Diablo Canyon, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 20102011-07-19019 July 2011 Diablo Canyon, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2010 DCL-11-082, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 20102011-07-19019 July 2011 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2010 ML11129A0852011-04-28028 April 2011 2010 Annual Radiological Environmental Operating Report DCL-11-049, 2010 Annual Radioactive Effluent Release Report, in Accordance with 10 CFR 50.36a(a)(2) and Section 5.6.32011-04-28028 April 2011 2010 Annual Radioactive Effluent Release Report, in Accordance with 10 CFR 50.36a(a)(2) and Section 5.6.3 DCL-11-051, 2010 Annual Nonradiological Environmental Operating Report2011-04-28028 April 2011 2010 Annual Nonradiological Environmental Operating Report ML1111807472011-04-28028 April 2011 2010 Annual Nonradiological Environmental Operating Report DCL-11-050, Diablo Canyon, Units 1 & 2, 2010 Annual Radiological Environmental Operating Report2011-04-28028 April 2011 Diablo Canyon, Units 1 & 2, 2010 Annual Radiological Environmental Operating Report DCL-10-055, Units, 1 and 2, 2009 Annual Commitment Change Summary Report2010-05-19019 May 2010 Units, 1 and 2, 2009 Annual Commitment Change Summary Report DCL-10-043, Submittal of 2009 Annual Radiological Environmental Operating Report2010-04-28028 April 2010 Submittal of 2009 Annual Radiological Environmental Operating Report DCL-10-039, 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period January 1, 2008, Through December 31, 20092010-04-19019 April 2010 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period January 1, 2008, Through December 31, 2009 DCL-10-034, Annual Report of Occupational Radiation Exposure for 20092010-03-26026 March 2010 Annual Report of Occupational Radiation Exposure for 2009 DCL-2009-523, 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I0182482009-06-11011 June 2009 2008-2009 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I018248 DCL-09-031, Submittal of 2008 Annual Commitment Change Summary Report2009-05-0707 May 2009 Submittal of 2008 Annual Commitment Change Summary Report DCL-09-029, 2008 Annual Radiological Environmental Operating Report2009-04-24024 April 2009 2008 Annual Radiological Environmental Operating Report DCL-08-061, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2007, Affect Peak Cladding Temperature (PCT) Calculations2008-07-23023 July 2008 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2007, Affect Peak Cladding Temperature (PCT) Calculations DCL-08-031, Transmittal of 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period of January 1, 2006, Through December 31, 20072008-04-17017 April 2008 Transmittal of 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Period of January 1, 2006, Through December 31, 2007 ML0729107542007-10-22022 October 2007 2006 Rulemaking Annual Report DCL-07-071, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 20062007-07-23023 July 2007 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for 2006 2023-09-13 Category:Environmental Monitoring Report MONTHYEARDCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024
[Table view]Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report A000375, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) - 1st Quarter Report 20242024-04-20020 April 2024 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) - 1st Quarter Report 2024 DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring ML24003A7212023-11-27027 November 2023 Independent Safety Committee; Diablo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety July 1, 2022-June 30, 2023 DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 ML23137A1352023-04-18018 April 2023 NPDES Receiving Water Monitoring Program 2022 Annual Report ML23052A1152023-02-18018 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report for 2022 DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-032, 2021 Annual Nonradiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Nonradiological Environmental Operating Report DCL-22-033, Annual Report of Occupational Radiation Exposure for 20212022-04-26026 April 2022 Annual Report of Occupational Radiation Exposure for 2021 DCL-22-025, 2021 Annual Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Radiological Environmental Operating Report DCL-22-017, Submittal of 2021 Annual Radioactive Effluent Release Report2022-04-21021 April 2022 Submittal of 2021 Annual Radioactive Effluent Release Report DCL-21-037, Annual Nonradiological Environmental Operating Report2021-04-28028 April 2021 Annual Nonradiological Environmental Operating Report DCL-2021-514, NPDES Receiving Water Monitoring Program: 2020 Annual Report2021-04-27027 April 2021 NPDES Receiving Water Monitoring Program: 2020 Annual Report DCL-21-022, 2020 Annual Radiological Environmental Operating Report2021-04-0101 April 2021 2020 Annual Radiological Environmental Operating Report L-21-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20202021-03-0101 March 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2020 DCL-20-036, 2019 Annual Non-Radiological Environment Operating Report2020-04-29029 April 2020 2019 Annual Non-Radiological Environment Operating Report DCL-20-010, 2019 Annual Radiological Environmental Operating Report2020-04-16016 April 2020 2019 Annual Radiological Environmental Operating Report L-20-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20192020-03-0202 March 2020 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2019 DCL-2020-509, 2019 Annual Report on Discharge Self-Monitoring2020-02-27027 February 2020 2019 Annual Report on Discharge Self-Monitoring DCL-19-026, Annual Radioactive Effluent Release Report2019-04-23023 April 2019 Annual Radioactive Effluent Release Report DCL-18-028, Submittal of 2017 Annual Radioactive Effluent Release Report2018-04-24024 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report DCL-17-034, 2016 Annual Non-Radiological Environmental Operating Report2017-04-27027 April 2017 2016 Annual Non-Radiological Environmental Operating Report ML17128A0242017-04-26026 April 2017 Submittal of 2016 Annual Radiological Environmental Operating Report DCL-17-030, Diablo Canyon Units 1 and 2, Submittal of 2016 Annual Radiological Environmental Operating Report2017-04-26026 April 2017 Diablo Canyon Units 1 and 2, Submittal of 2016 Annual Radiological Environmental Operating Report DCL-17-031, Transmittal of 2016 Annual Radioactive Effluent Release Report2017-04-26026 April 2017 Transmittal of 2016 Annual Radioactive Effluent Release Report ML17096A7662017-04-0606 April 2017 Submittal of Mitigating Strategies Assessment for Flooding Report DCL-17-030, 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP)2017-03-29029 March 2017 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP) DCL-2017-511, Submittal of 2016 Annual Discharge Self-Monitoring Report2017-02-28028 February 2017 Submittal of 2016 Annual Discharge Self-Monitoring Report DCL-2017-501, Diablo Power Plant - 2016 Annual Sea Turtle Report2017-01-27027 January 2017 Diablo Power Plant - 2016 Annual Sea Turtle Report DCL-2017-500, Discharge Monitoring Report for Fourth Quarter 20162017-01-20020 January 2017 Discharge Monitoring Report for Fourth Quarter 2016 DCL-16-113, Corrections to the 2014 and 2015 Annual Radioactive Effluent Release Reports2016-11-0101 November 2016 Corrections to the 2014 and 2015 Annual Radioactive Effluent Release Reports DCL-16-055, Transmittal of 2015 Annual Non-Radiological Environmental Operating Report2016-04-28028 April 2016 Transmittal of 2015 Annual Non-Radiological Environmental Operating Report ML16154A1652016-04-27027 April 2016 Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report L-2016-518, Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report2016-04-27027 April 2016 Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report DCL-16-054, Annual Radioactive Effluent Release Report for 20152016-04-27027 April 2016 Annual Radioactive Effluent Release Report for 2015 DCL-2016-518, NPDES Receiving Water Monitoring Program: 2015 Annual Report2016-04-25025 April 2016 NPDES Receiving Water Monitoring Program: 2015 Annual Report DCL-16-045, Submittal of 2015 Annual Radiological Environmental Operating Report2016-04-21021 April 2016 Submittal of 2015 Annual Radiological Environmental Operating Report DCL-2016-516, Transmittal of 1st Quarter 2016 Report on Discharge Self-Monitoring2016-04-20020 April 2016 Transmittal of 1st Quarter 2016 Report on Discharge Self-Monitoring DCL-15-137, Corrections to the 2014 Annual Radioactive Effluent Release Report2015-12-31031 December 2015 Corrections to the 2014 Annual Radioactive Effluent Release Report 2024-08-28 Category:Letter type:DCL MONTHYEARDCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024
[Table view]Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System 2024-09-09 |
Text
Pacific Gas and Electric Campany "'
Dennis B. Petersen Diablo Canyon Power Pl ant Station Director Ma il cod a 104151502 P.O. Bo x 56 Av ila Bo a ch, CA 93424
805.545.4022 Internal: 691.4022
REIRS Project Manager 10 CFR 20.2206 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Docket No. 50- 275, OL-DPR-80 Docket No. 50 - 323, OL-DPR - 82 Diablo Canyon Units 1 and 2 Annual Report of Occupational Rad iation Exposure for 2021
REIRS Project Manager:
On April 12, 2022, Pacific Gas and Electric Company (PG&E) submitted the Annual Report of Occupationa l Radiation Exposure for individuals mon itored at Diablo Canyon Power Plant during the 2021 calendar year in accordance with 10 CFR 20.2206(c). The report was created in the electronic format specified in Regulatory Guide 8.7, Revision 4, "Instruct ions for Recording and Reporting Occupational Rad iat ion Dose Data." The data file, " NRC20220412.dat," was submitted electronically on the Radiation Exposure Information and Reporting System (REIRS) web page.
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If you have any questions about the report, please contact Mr. Craig Sutton, Nuclear Radiat ion Protection Manager, at 805-545 -4208.
Sincerely,
Dennis B. Petersen
armb/50942689-11 cc: Na tasha A. Greene, NRC Acting Senio r Resident Inspector Samson S. Lee, NRC Project Manager Scott A. Morris, NRC Region IV Adm inistrator NRC Document Control Desk Diablo Distribution
A m e m b e r of t he ST ARS Allian c e
Cal l away
- Di a b l o Ca nyo n
- P a l o Ver de
- Wol f Creek