Letter Sequence Request |
|---|
|
|
MONTHYEARDCL-04-053, Annual Nonradiological Environmental Operating Report2004-04-28028 April 2004 Annual Nonradiological Environmental Operating Report Project stage: Request ML0413407042004-05-20020 May 2004 Supplemental Response to the April 29, 2003, Orders Modifying Licenses for Revised Design Basis Threat Project stage: Other ML0419702532004-06-28028 June 2004 RAI, Security Plan Sections 1-9 Project stage: RAI DCL-04-085, Response to NRC Requests for Additional Information Regarding Physical Security Plan Sections 1 Through 19 Per NRC Secured Facsimile Dated June 22. 2004 and NRC Letter Dated June 28. 20042004-07-0808 July 2004 Response to NRC Requests for Additional Information Regarding Physical Security Plan Sections 1 Through 19 Per NRC Secured Facsimile Dated June 22. 2004 and NRC Letter Dated June 28. 2004 Project stage: Response to RAI ML0419801192004-07-0909 July 2004 Request for Additional Information Training and Qualification Plan Project stage: RAI DCL-04-092, Response to NRCs Request for Additional Information Regarding the Plant Physical Security Plan. Training and Qualification Plan Per NRC Letter Dated July 9. 20042004-07-23023 July 2004 Response to NRCs Request for Additional Information Regarding the Plant Physical Security Plan. Training and Qualification Plan Per NRC Letter Dated July 9. 2004 Project stage: Request ML0421904472004-07-23023 July 2004 RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan, Project stage: RAI DCL-04-101, Response to NRCs Request for Additional Information Re Plant Safeguards Contingency Plan & Section 9.4.1 of the Physical Security Plan, Per NRC Letter Dated July 23, 20042004-08-0505 August 2004 Response to NRCs Request for Additional Information Re Plant Safeguards Contingency Plan & Section 9.4.1 of the Physical Security Plan, Per NRC Letter Dated July 23, 2004 Project stage: Request DCL-04-102, Response to NRCs Request for Additional Information Re Plant Physical Security Plan and Safeguards Contingency Plan - Closeout of Open Items2004-08-13013 August 2004 Response to NRCs Request for Additional Information Re Plant Physical Security Plan and Safeguards Contingency Plan - Closeout of Open Items Project stage: Request ML0425900182004-09-10010 September 2004 Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures Project stage: Other ML0427201122004-09-21021 September 2004 Security Plan Provisions for Enhanced Owner Controlled Area Surveillance and Response Project stage: Other DCL-04-120, ISFSI - 10-Day Response to NRC Letter, Dated September 10. 2004, Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures2004-09-23023 September 2004 ISFSI - 10-Day Response to NRC Letter, Dated September 10. 2004, Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures Project stage: Other DCL-04-126, Incorporation of NRC Security Plan Review Team Comments of the Diablo Canyon Power Plant Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan2004-10-0808 October 2004 Incorporation of NRC Security Plan Review Team Comments of the Diablo Canyon Power Plant Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Project stage: Request ML0431800052004-10-28028 October 2004 Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat. Project stage: Other 2004-07-08
[Table View] |
Text
Pacific Gas and Electric Company David H. Oatley Diablo Canyon Power Plant Vice President and PO. Box 56 General Manager Avila Beach, CA 93424 August 5, 2004 805.545.4340 PG&E Letter DCL-04-101 ATTN: Ms. Deidre W. Spaulding Project Manager, Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Mail Stop 08H4A U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Diablo Canyon Units I and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Response to NRC's Reauest For Additional Information Regarding the Diablo Canyon Power Plant Safe-uards Contingency Plan and Section 9.4.1 of the Phvsical Security Plan (TAC MC2913 and MC2914) per NRC Letter dated July 23. 2004
Dear Ms. Spaulding:
Pacific Gas & Electric Company (PG&E) Letter DCL-04-054, dated April 28, 2004, submitted the Diablo Canyon Power Plant (DCPP) Physical Security Plan (PSP) per NRC Order dated April 29, 2003. On July 28, 2004, PG&E received the NRC letter, dated July 23, 2004, requesting additional information related to the Safeguards Contingency Plan and section 9.4.1 of the PSP. The enclosure to this letter provides the response to the NRC request for additional information (RAI), except for item numbers 5 and 9. Per previous communication, PG&E will submit response to the NRC RAI item numbers 5 and 9 no later than August 13, 2004.
This response is hereby submitted in conformance with 10 CFR 50.4. If you have any questions, please contact me or Ronald Todaro at (805) 545-4309.
Sincerely, David H. Oatley SAFEGUARDS INFORMATION THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED IN ACCORDANCE WITH 10 CFR 73.21. UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED."
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Casaway
RI0 Ms. Deidre W. Spaulding August 5, 2004 Page 2 PG&E Letter DCL-04-101 swh/A0582378IAE45 Enclosures cc:
Bruce S. Mallett, Region IV David L. Prouix, Resident Girija S. Shukla, NRR Diablo Distribution cc/enc: John P. Hubble, DCPP Security SAFEGUARDS INFORMATION THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED IN ACCORDANCE WITH 10 CFR 73.21. UPON SEPARATION OF THE ENCLOSURESS, THIS LETTER IS "DECONTROLLED."
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway