RAI, Security Plan Sections 1-9
ML041970253
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/28/2004
From: Spaulding D
NRC/NRR/DLPM/LPD2
To: Rueger G
Pacific Gas & Electric Co
Spalding D, NRR/DLPM/LPD3-1, 415-2928
References
TAC MC2913, TAC MC2914
Download: ML041970253 (4)


Text

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is subject to Civil and Criminal Penalties June 28, 2004 Mr. Gregory M. Rueger Senior Vice President - Generation and Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 3 Avila Beach, CA 93424 c/o Mr. Ron Todaro

SUBJECT:

DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TACMC2913 AND MC2914)

Dear Mr. Rueger:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Diablo Canyon Nuclear Power Plant, Units 1 and 2.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-2743.

Sincerely,

/RA/

Deirdre W. Spaulding, Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosure:

As stated cc w/o encl: See next page NOTICE: The enclosed information contains Safeguards Information. Upon separation from the enclosure, this letter is DECONTROLLED.

SAFEGUARDS INFORMATION June 28, 2004 Mr. Gregory M. Rueger Senior Vice President - Generation and Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 3 Avila Beach, CA 93424 c/o Mr. Ron Todaro

SUBJECT:

DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: SECURITY PLAN SECTIONS 1-9 (TACMC2913 AND MC2914)

Dear Mr. Rueger:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, for Diablo Canyon Nuclear Power Plant, Units 1 and 2.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined that a request for additional information (RAI) is necessary in order to complete its evaluation based on its review of Sections 1 through 9 of your physical security plan. Please respond to the enclosed RAI within 10 days from the date of this letter. If circumstances result in the need to revise the target response date, please contact me at (301) 415-2743 Sincerely,

/RA/

Deirdre W. Spaulding, Security Plan Review Team Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION:

PUBLIC SPRT R/F OGC ACRS ADAMS Accession Number: ML041970253 C:\\ORPCheckout\\FileNET\\ML041970253.wpd OFFICE SPRT/NRR/PM SPRT/NSIR SPRT/NRR/SC NAME DSpaulding JPeralta JNakoski DATE 6/26/04 6/28/04 6/28/04

SAFEGUARDS INFORMATION OFFICIAL RECORD COPY

Diablo Canyon Power Plant, Units 1 and 2 cc:

NRC Resident Inspector Diablo Canyon Power Plant c/o U.S. Nuclear Regulatory Commission P.O. Box 369 Avila Beach, CA 93424 Sierra Club San Lucia Chapter c/o Henriette Groot 1000 Montecito Road Cayucos, CA 93430 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Richard F. Locke, Esq.

Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120 Mr. David H. Oatley, Vice President and General Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 Mr. Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)

Sacramento, CA 95814 Mr. James R. Becker, Vice President Diablo Canyon Operations and Station Director Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424 Mr. Gregory M. Rueger Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424