CPSES-200501798, Transmittal of First-Half 2005 Fitness-For-Duty Program Performance Data

From kanterella
Jump to navigation Jump to search
Transmittal of First-Half 2005 Fitness-For-Duty Program Performance Data
ML052500303
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/31/2005
From: Madden F
TXU Generation Co, LP
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200501798, TXX-05165
Download: ML052500303 (6)


Text

  • TXU Power TXU Power Mike Blevins Comanche Peak Steam Senior Vice President &

Electric Station Chief Nuclear Officer P. O. Box 1002 (E01)

Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevinsXtxu.com CPSES-200501798 Log # TXX-05165 August 31, 2005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF FIRST-HALF 2005 FITNESS-FOR-DUTY PROGRAM PERFORMANCE DATA Gentlemen:

Attached are the TXU Generating Company LP (TXU Power) Fitness-For-Duty Program Performance data for the six month period of January 1, 2005 through June 30, 2005 for CPSES. The data required by IOCFR26.71(d) are provided on standard forms with the exception of the summary of management actions and list of events reported, which are provided on a separate page titled "Summary of Management Action." This communication contains no new or revised commitments.

If there are any questions, please contact Mr. James Brown at (254) 897-8912.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

TXX-05165 Page 2 of 2 Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC Its General Partner Mike Blevins By: /r d w M iA adden Director, Regulatory Affairs NSH Attachments c- B. S. Mallett, Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES

Attachments to TXX-05165 (3 Pages)

J Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 TXU Power June 30. 2005 Company 6 Months Ending Comanche Peak Steam Electric Station Location James E. Brown, Security Coordinator (254)897-8912 Contact Name Phone (including area code)

Cutoffs: Screen/Confirmation (ng/ml) El Appendix A to 10 CFR 26 Mariiuana 50 / 15 AmDhetamines 1000 / 500 Cocaine 300 / 150 Phencvclidine 25 / 25 Opiates 300 / 300 Alcohol (% BAC) 0.04%

I ____.__

Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 912 702 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 45 0 0 0 1197 12 For Cause Post-accident 0 0 0 0 2 0 Observed behavior 1 0 0 0 0 0 Random 248 0 0 0 201 1 Follow-up 5 0 0 0 0 0 Other* 9 0 0 0 23 1 Total 308 0 0 0 1423 14

V, Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe- Phency Alcohol Refusal 1 2 3 4 5 tamines cildine to Test Licensee Employees . _

Long-Term Contractors I I III I Short Term Contractors 7 1 6 1 1 A Total

_ 7 1 6 1 1 1 = = I

SUMMARY

OF MANAGEMENT ACTIONS And STATISTICAL ANALYSIS FOR REPORTING PERIOD JANUARY THROUGH JUNE 2005 Analysis of the data indicates that 52 percent of the average eligible population was randomly tested during the period January through June 2005 The total positive tests for this period were 15. Short-term contractor personnel accounted for all of positive tests and one short-term contractor refusal to test.

TXU Power submitted blind performance specimens in accordance with 10 CFR 26, Appendix A, Section 2.8 (e)(2), requirements. There were no reportable events.

No events were reported by telephone under 10CFR26.73.