CPSES-200501798, Transmittal of First-Half 2005 Fitness-For-Duty Program Performance Data
| ML052500303 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/31/2005 |
| From: | Madden F TXU Generation Co, LP |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CPSES-200501798, TXX-05165 | |
| Download: ML052500303 (6) | |
Text
TXU Power TXU Power Comanche Peak Steam Electric Station P. O. Box 1002 (E01)
Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevinsXtxu.com Mike Blevins Senior Vice President &
Chief Nuclear Officer CPSES-200501798 Log # TXX-05165 August 31, 2005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF FIRST-HALF 2005 FITNESS-FOR-DUTY PROGRAM PERFORMANCE DATA Gentlemen:
Attached are the TXU Generating Company LP (TXU Power) Fitness-For-Duty Program Performance data for the six month period of January 1, 2005 through June 30, 2005 for CPSES. The data required by IOCFR26.71(d) are provided on standard forms with the exception of the summary of management actions and list of events reported, which are provided on a separate page titled "Summary of Management Action." This communication contains no new or revised commitments.
If there are any questions, please contact Mr. James Brown at (254) 897-8912.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde South Texas Project Wolf Creek
TXX-05165 Page 2 of 2 Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner Mike Blevins By: /r d
w M iA adden Director, Regulatory Affairs NSH Attachments c -
B. S. Mallett, Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES
Attachments to TXX-05165 (3 Pages)
J Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 TXU Power Company June 30. 2005 6 Months Ending Comanche Peak Steam Electric Station Location James E. Brown, Security Coordinator (254)897-8912 Contact Name Phone (including area code)
Cutoffs:
Screen/Confirmation (ng/ml)
Mariiuana 50
/ 15 A
El Appendix A to 10 CFR 26 Cocaine 300
/ 150 Opiates 300
/ 300 P
mDhetamines 1000 / 500 hencvclidine 25
/ 25 Alcohol (% BAC) 0.04%
I Testing Results Licensee Employees Long-Term Short-Term Contractor Personnel Contractor Personnel Average Number with 912 702 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 45 0
0 0
1197 12 For Cause Post-accident 0
0 0
0 2
0 Observed behavior 1
0 0
0 0
0 Random 248 0
0 0
201 1
Follow-up 5
0 0
0 0
0 Other*
9 0
0 0
23 1
Total 308 0
0 0
1423 14
V, Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency Alcohol Refusal 1
2 3
4 5
tamines cildine to Test Licensee Employees Long-Term Contractors I
I III I
Short Term Contractors 7
1 6
1 1
A Total 7
1 6
1 1
1
=
=
16 -
I
SUMMARY
OF MANAGEMENT ACTIONS And STATISTICAL ANALYSIS FOR REPORTING PERIOD JANUARY THROUGH JUNE 2005 Analysis of the data indicates that 52 percent of the average eligible population was randomly tested during the period January through June 2005 The total positive tests for this period were 15. Short-term contractor personnel accounted for all of positive tests and one short-term contractor refusal to test.
TXU Power submitted blind performance specimens in accordance with 10 CFR 26, Appendix A, Section 2.8 (e)(2), requirements. There were no reportable events.
No events were reported by telephone under 1 OCFR26.73.