CPSES-200500969, Technical Specification 15-Day Report for Steam Generator Tube Plugging

From kanterella
Jump to navigation Jump to search
Technical Specification 15-Day Report for Steam Generator Tube Plugging
ML051250408
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 04/28/2005
From: Blevins M, Madden F
TXU Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-200500969, NR-24, TXX-05092
Download: ML051250408 (3)


Text

-

t

  • TXl "4w Power TXU Power Comanche Peak Steam Electric Station P. O. Box 1002 (EO1)

Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins~txu.com Mike Blevins Senior Vice President &

Chief Nuclear Officer Ref: #IOCFR50.55a CPSES-200500969 Log # TXX-05092 File # NR-24 April 28, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

UNIT 2, DOCKET NO. 50-446 TECHNICAL SPECIFICATION 15-DAY REPORT FOR STEAM GENERATOR TUBE PLUGGING Gentlemen:

As Attachment 1 to this letter, TXU Generation Company LP (TXU Power) hereby submits a report pursuant to CPSES Technical Specification 5.6.10.a. for Steam Generator (SG) tubes plugged during the current refueling outage.

Should you require any other additional information please contact Mr. Bob Kidwell at (254) 897-5310.

This communication contains no new licensing basis commitments regarding CPSES Unit 2.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

W TXX-05092 Page 2 of 2 Sincerely, TXU Generation Company LP By:

TXU Generation Management Company LLC Its General Partner Mike Blevins By:

A 4

1QK

/rdW. Madden Director, Regulatory Affairs RJK Attachment c -

B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES

X s

Attachment I to TXX-05092 Page 1 of I TXU GENERATION COMPANY LP COMANCHE PEAK STEAM ELECTRIC STATION UNIT 2 REPORT OF STEAM GENERATOR TUBES PLUGGED OR REPAIRED The following information meets the information reporting requirements of CPSES Technical Specification 5.6.10.a., which states:

"Within 15 days following the completion of each inservice inspection of steam generator tubes, the number of tubes plugged, repaired or designated as an F* tube in each steam generator shall be reported to the Commission;"

Tube repair (by sleeving) and designation as a F* tube are not applicable to CPSES Unit 2; therefore, this report is only of the total tubes plugged during refueling outage 2RF08.

CPSES UNIT 2 STEAM GENERATOR 1 5 tubes were plugged in this steam generator CPSES UNIT 2 STEAM GENERATOR 2 2 tubes were plugged in this steam generator CPSES UNIT 2 STEAM GENERATOR 3 4 tubes were plugged in this steam generator CPSES UNIT 2 STEAM GENERATOR 4 2 tubes were plugged in this steam generator