CNRO-2007-00005, Completion of Actions and Commitments Regarding Pressurizer Alloy 82/182 Butt Welds

From kanterella
(Redirected from CNRO-2007-00005)
Jump to navigation Jump to search

Completion of Actions and Commitments Regarding Pressurizer Alloy 82/182 Butt Welds
ML082120371
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/28/2008
From: Walsh K
Entergy Nuclear South
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO-2007-00005, W3F1-2008-0048
Download: ML082120371 (3)


Text

Entergy Nuclear South Entergy Operations, Inc.

17265 River Road Killona, LA 70057 Tel 504 739 6660 Fax 504 739 6678 SEntergy kwalshl@entergy.com Kevin T. Walsh Vice President, Operations Waterford 3 W3F1-2008-0048 July 28, 2008 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555

SUBJECT:

Completion of Actions and Commitments Regarding Pressurizer Alloy 82/182 Butt Welds Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38 I

REFERENCES:

1. Entergy letter to NRC dated July 24, 2008, 60-Day Report for Waterford Steam Electric Station, Unit 3 ReactorPressure Vessel Head and PressurizerInspection/Repairfor the Spring 2008 Refueling Outage (W3F1-2008-0049)
2. NRC letter to Entergy dated March 20, 2007, ConfirmatoryAction Letter

- Waterford Steam Electric Station, Unit 3 (TAC NO. MD4196)

(CAL No. NRR-07-006)

3. Entergy letter to NRC dated February 21, 2007, Inspection and Mitigation of Alloy 600/82/182 PressurizerButt Welds, (CNRO-2007-00005)

Dear Sir or Madam:

By letter (Reference 1), Entergy Operations, Inc. (Entergy) provided the NRC the results of the mitigation actions taken on the remaining Alloy 82/182 Pressurizer butt welds associated with the pressurizer spray, surge, and relief lines for Waterford Steam Electric Station, Unit 3 (Waterford 3). In Reference 2, an NRC Confirmatory Action Letter wasissued to confirm commitments by Entergy regarding Alloy 82/182 butt welds at Waterford 3. In Reference 3, Entergy notified the NRC staff of actions planned for Waterford 3 to address the potential of primary water stress-corrosion cracking (PWSCC) in the dissimilar metal butt welds containing Alloy 82/182 on the pressurizer spray, surge, and relief lines.

As requested in Reference 2, Entergy is notifying the NRC that all required actions and commitments contained in Reference 3 and confirmed in Reference 2 have been satisfactorily completed. With all the Alloy 82/182 butt welds in the Waterford 3 pressurizer being

W3F1-2008-0048 Page 2 of 3 mitigated, the enhanced reactor coolant system inspection and leakage monitoring requirements, established by References 2 and 3, are no longer applicable.

This letter contains no additional NRC commitments. If you have any questions or require additional information, please contact Robert Murillo at 504-739-6715.

I declare under penalty of perjury that the foregoing is true and correct. Executed on July 28, 2008.

Sincerely, KTW/RLW/

/

J W3F1-2008-0048 Page 3 of 3 cc: Mr. Elmo E. Collins, Jr.

Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U.S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-7D1 Washington, DC 20555-0001 Louisiana Department of Environmental Quality Office of Environmental Compliance Surveillance Division P. O. Box 4312 Baton Rouge, LA 70821-4312 American Nuclear Insurers Attn: Library 95 Glastonbury Blvd.

Suite 300 Glastonbury, CT 06033-4443 Wise, Carter, Child & Caraway Attn: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-3817 Morgan, Lewis & Bockius LLP ATTN: T.C. Poindexter 1111 Pennsylvania Avenue, NW, Washington, DC 20004