MONTHYEARCNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00021, Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-0192020-11-0909 November 2020 Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-019 CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2020-00015, Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)2020-06-0808 June 2020 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00021, Confirmatory Order - Action H2015-11-0303 November 2015 Confirmatory Order - Action H CNRO-2015-00020, ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance2015-09-23023 September 2015 ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance CNRO-2015-00018, Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.2015-08-20020 August 2015 Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1. CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual CNRO-2015-00011, Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 20142015-03-27027 March 2015 Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 2014 CNRO-2015-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2015-03-27027 March 2015 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2015-00003, RBS Security Confirmatory Order - Action C2015-02-0505 February 2015 RBS Security Confirmatory Order - Action C CNRO-2015-00007, ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments2015-01-30030 January 2015 ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20142014-04-0303 April 2014 Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014 CNRO-2014-00001, Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-096 CNRO-2013-00009, Grant Gulf, River Bend, Unit 1 and Waterford 3, Response to Request for Additional Information Regarding 2013 Decommissioning Fund Status Report - Entergy Operations, Inc2013-06-20020 June 2013 Grant Gulf, River Bend, Unit 1 and Waterford 3, Response to Request for Additional Information Regarding 2013 Decommissioning Fund Status Report - Entergy Operations, Inc CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report - Entergy Operations, Inc CNRO-2013-00004, Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2013-03-25025 March 2013 Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications 2022-05-26
[Table view] |
Text
- Entergy Entergy Operations, Inc.
1340 Echelon Parkway Jackson, Mississippi 39213-8298 Tel 601-368-5758 F. G. Burford Acting Director Nuclear Safety & Licensing CNRO-2004-00012 March 4, 2004 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Response to NRC Request for Additional Information Pertaining to Request for Relief RBS-VRR-008 (TAC No. MC1 032)
River Bend Station Docket No. 50-458 License No. NPR-47
REFERENCE:
Letter from Entergy Operations, Inc to the NRC, Request to Use Altemate Testing Frequency for Inservice Testing, dated October 13, 2003
Dear Sir or Madam:
In the referenced letter, Entergy Operations, Inc. (Entergy) requested the NRC staff to authorize an alternate testing frequency for performing inservice testing (IST) of check valve E51-VF030 as detailed in Relief Request RBS-VRR-008. On December 3, 2003, Entergy received comments from the staff pertaining to this request. Entergy is providing responses to the staff's comments in the enclosure.
Should you have any questions regarding this letter, please contact Guy Davant at (601) 368-5756.
This letter contains no commitments.
Very truly yours, FGB/GHD/ghd
Enclosure:
Response to NRC Request for Additional Information Pertaining to Request for Relief RBS-VRR-008 cc: (see next page) 4ei4-7
CNRO-2004-0001 2 Page 2 of 2 cc: Mr. W. A. Eaton (ECH)
Mr. P. D. Hinnenkamp (RBS)
Dr. Bruce S. Mallett U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector P. 0. Box 1050 St. Francisville, LA 70775 U.S. Nuclear Regulatory Commission Attn: Mr. Michael K. Webb MS 0-7D1 Washington, DC 20555-0001
ENCLOSURE CNRO-2004-0001 2 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO REQUEST FOR RELIEF RBS-VRR-008
Enclosure to CNRO-2004-00012 Page 1 of 4 RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO REQUEST FOR RELIEF RBS-VRR-008
- 1. Provide the related P&lDs drawing(s) that contains the relief request's check valve E51-VF030 in the Reactor Core Isolation Cooling System (RCIC) from the Reactor Coolant System (RCS) to the check valve.
Response
River Bend Station (RBS) FSAR Figure 5.4-8 contains the P&ID showing RCIC and, specifically, E51 -VF030 (at coordinate A-11).
- 2. Relief Request VRR-008 does not address the safety and risk significance of on-line inservice testing (IST) of check valve E51-VF030. Please address (either in a qualitative or quantitative manner) the potential risk of disassembly and inspection of this check valve on-line compared to the risk when the plant is shutdown.
Response
RBS performs on-line maintenance on the RCIC system, which includes tasks such as pump and turbine inspections/minor maintenance, and inspection of the governor valve and its linkage. The system outage window for the basic inspections conducted on an 18-month frequency lasts approximately 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. For more extensive maintenance activities, which occur on a less frequent basis, the window is longer. Based on review of maintenance history, disassembly, inspection, and reassembly of check valve E51-VF030 takes between 6 and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This IST activity would be conducted simultaneously with other maintenance activities scoped into the maintenance window.
Based on maintenance history, scheduling experience, and work execution in past on-line maintenance windows on the RCIC system, this additional work will neither extend the maintenance window nor increase the overall system unavailability. Therefore, performing this IST activity on-line would change neither the duration of the on-line maintenance activity nor the core damage probability (CDP) associated with the RCIC on-line maintenance activity. For these reasons, the risk/CDP over the entire operating/shutdown spectrum would remain unchanged with approval of this relief request.
- 3. Provide sufficient information for NRC staff to reach a safety or risk determination with regards to the leak testing experience and leak tightness reliability of the associated pressure isolation valves and the potential consequences of a loss of isolation capability during disassembly, inspection, and manual exercising of this check valve E51-VF030.
Response
The valves that are used to establish the isolation boundary for the disassembly and inspection of E51-VF030 have an excellent history of providing adequate isolation.
The pressure upstream of the boundary isolation valve (E51--F031) is a result of the head developed from the water volume in the suppression pool. Because of this head pressure, the upstream pressure at the isolation valve varies only slightly between on-line and shutdown conditions. The piping downstream of E51-VF030 has two check
Enclosure to CNRO-2004-00012 Page 2 of 4 valves (E51-VF011 and E51-V3004) and two motor operated isolation valves (E51-F013 and E51-FO101) protecting it from system operating pressure. E51-VF011, V3004, and F013 isolate E51-VF030 from system pressure while E51-F010 provides isolation from the condensate storage tank inventory. Check valves VF01 1 and V3004 are tested for closure capability in accordance with the Inservice Testing program, and have shown to be reliable. E51-F013, until recently, was leakage tested as a pressure isolation valve with excellent success. Although the downstream system pressure varies between on-line and shutdown conditions, the redundancy and reliability of these valves minimizes any risk of loss of isolation capability.
Once adequate isolation is confirmed, it is maintained by passive isolating valves or valves made passive (e.g. de-energized motor operated valve), which are controlled in accordance with Entergy's protective tagging program. A loss of isolation capability under these conditions is not considered credible due to the passive characteristics of the isolating valves.
Additionally, when breaching a pressure boundary, standard maintenance practice is to monitor the component being disassembled to ensure there is no unexpected leakage during disassembly. This practice verifies integrity of the isolation boundary and allows for recovery of safe conditions should evidence of unexpected leakage become apparent.
- 4. Based on the risk significance discussed in RAI 3 above, discuss what preventive or compensatory measures are necessary to maintain safety and minimize risk while performing on-line [ST.
Response
Risk associated with on-line maintenance activities is controlled through the RBS work control process. This process includes preventive measures for maintaining safety and minimizing risk while performing on-line maintenance such as:
- a. Assessing work activities by multiple independent personnel to ensure work activities in one system do not affect the ability of redundant systems or trains to perform their safety functions.
- b. Establishing redundant systems or trains as "protected", so that these systems are less likely to be inadvertently made INOPERABLE while they are being credited to operate during the period that another safety system is out of service.
- c. Providing additional management oversight for significant maintenance activities being conducted while in Technical Specification (TS) Limiting Condition for Operation (LCO) REQUIRED ACTION statements.
- d. Conducting shift briefings to ensure that personnel are aware of active TS LCO REQUIRED ACTION statements.
- e. Using human performance tools including pre-job briefings, self-checking, and peer-checking to reduce or eliminate human errors.
Enclosure to CNRO-2004-00012 Page 3 of 4
- 5. Under the section entitled Basis for Relief, the licensee states that the maintenance rule 10 CFR 50.65(a)(4) requires licensees to assess and manage the increase of risk that may result from proposed maintenance activities. However, in order for the staff to evaluate whether the proposed IST alternative is acceptable, the licensee must demonstrate that the alternative provides an acceptable level of quality and safety pursuant to 10 CFR 50.55a(a)(3)(i). Performing a risk assessment of the proposed on-line testing at the time of IST does not address why on-line testing provides an acceptable level of quality and safety at this time. Meeting the maintenance rule is a separate regulatory requirement. Nonetheless, discuss how risk insights, as well as other factors, will be used to establish when IST should be performed either on-line or during refueling outages.
Response
The level of quality associated with IST activities is independent of whether the activity is performed on-line or during an outage. The same personnel, procedures, and acceptance criteria are used in either case; the safe conduct of maintenance and IST activities is built into the work control process. The inspection activities are planned ensuring adequate isolation boundaries are established to protect both maintenance personnel involved in the activity and plant equipment.
Entergy manages work windows on a recurring cycle. Risk insight is used to ensure that proposed work or inspection activities balance reliability with unavailability. The work selection process provides the means to ensure, through the oversight of knowledgeable personnel, that when system unavailability is to be incurred, the preventive maintenance, corrective maintenance, and other inspections required to maximize the system's reliability are included in the maintenance window. In this manner, each window is scoped to maximize the reliability benefit from taking system unavailability while minimizing the unavailability such that it is maintained at a level that minimizes overall risk. Entergy is confident that this rigorous work selection, scoping, and risk management system will identify all work that is more appropriately placed in outages, and schedule such work accordingly.
- 6. Explain how TS requirements for the RCIC system will be satisfied while performing on-line IST of this check valve E51-VF030 in the system. Specifically, address the LCO and describe the actions the licensee will take to ensure that on-line IST will be accomplished within the allowed outage time. Discuss the typical amount of time needed to complete the IST of this check valve based on previous testing experience. Similarly, describe any contingency plans that will be in effect to provide reasonable confidence that the TS allowed outage time (AOT) will not be exceeded if the check valve is found to be in a significantly degraded or unacceptable condition.
Response
Work on check valve E51-VF030 and the other periodic work planned for the RCIC system will cause RCIC to become INOPERABLE in accordance with TS. In accordance with TS 3.5.3, operation with RCIC INOPERABLE is permitted for up to 14 days; the REQUIRED ACTION entered as the work window begins. As described in the response to Question 2, disassembly, inspection, and reassembly of E51-VF030 takes between 6 and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, which would typically be accomplished within a 72-hour work window.
Work that requires entry into a TS LCO REQUIRED ACTION statement is planned and
Enclosure to CNRO-2004-0001 2 Page 4 of 4 scheduled in accordance with the RBS work control process previously described in Response to Item #4, above. The work control process includes establishing the scope of work such that only 50% of the TS AOT is required to perform the scheduled work. In addition, LCO Coordinators provide continuous coverage for resolving problems.
Additionally, spare parts that may be necessary for rework are identified and made available in case rework becomes necessary. As discussed in the Response to Item #2, above, the inspection activities for E51-VF030 typically take from 6 to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Based on the historical performance of E51-VF030, including this activity in the LCO window would not affect the duration of the time spent in the LCO REQUIRED ACTION.