Entergy Nuclear Operations, Inc.
Vermont Yankee P.O. Box 0500 7t 185 Old Ferry Road En tfft Brattleboro, VT 05302-0500 Tel 802 257 5271 December 14, 2006 BVY 06-1 04 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Reference:
Letter, VYNPS to USNRC, "2005 Annual Radiological Effluent. Release Report," BVY 06-46, dated May 15, 2006
Subject:
Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)
Supplement to the Annual Radiological Effluent Release Report for Year 2005 The attachment to this letter contains a supplemental corrective update to the referenced report for calendar year 2005.
There are no new regulatory commitments contained in this submittal We trust that the information provided is adequate; however, should you have questions or require additional information, please contact Mr. David Mannai at (802) 258-5422.
Sincerely, Site Vice President Vermont Yankee Nuclear Power Station Attachment (1) cc:
USNRC Region 1 Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager - VYNPS Vermont Department of Public Service Vermont Division of Occupational and Radiological Health Massachusetts Metropolitan District Commission Massachusetts Department of Public Health
Docket No. 50-271 BVY 06-104 Vermont Yankee Nuclear Power Station Supplement to the Annual Radiological Environmental Operating Report For Year 2005
ENTERGY NUCLEAR - VERMONT YANKEE Vermont Yankee Nuclear Power Station Supplement to the ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT For Year 2005 Preparation coordinate y:
Crow 14t Steph
.S
- bowsky RSr.H C,&n Spe 1 ist (Nuclear)
Dfate Reviewed by:
j,
/
2[ *
/Stephen C. McAvoy, Chemist Supervisor Da te/
Approved for Distribution:
r
/ A **D*a/J)*
Sammuel
. Wender IV, Chemistry Superintendent Da Page 1 of 2
Supplemental Report:
This supplemental corrective update to the year 2005 Vermont Yankee Annual Radioactive Effluent Release Report (ARERR) is presented to provide a revised format in Table 3 of the original ARERR so as to be consistent with previous submittals of this annual report. These inconsistencies were discovered during a recent audit of this report Radiological Environmental Operating Program (REMP).
Specifically, Table 3, Solid Waste and Irradiated Fuel Shipments, was found to be inconsistently formatted with previous years' submittals. In both Section A and Section B of Table 3, an additional sub-table was provided which summarized shipments from Vermont Yankee Nuclear Power Station to its waste processors. This additional information inappropriately over-reported the total curie content and volume of waste shipments from Vermont Yankee. Previous years had presented data for shipments from Vermont Yankee to the burial sites and from Vermont Yankee's waste processors to the burial sites. The additional information presented in Table 3 for 2005 effectively counted the radioactive material twice, once when it left Vermont Yankee for shipment to the waste processors and the second time when the same radioactive material, in a reduced volume, was shipped from our waste processors to the burial locations. The attached, revised Table 3 corrects this reporting error.
Page 2 of 2
TABLE 3 Vermont Yankee Effluent and Waste Disposal Annual Report First and Second Quarters, 2005 - Solid Waste and Irradiated Fuel Shipments Reviewed by (RP Dept.)
A.
SOLID WASTE SHIPPED OFFSITE FOR BURIAL OR DISPOSAL (not irradiated fuel)
- 1.
Type of Waste T 1ST an ND Shipped from VY for Burial or Disposal Unit 1 STeand 2
[D Est. Total Error, %
m3
- a. Spent resins, filter sludges, evaporator bottoms, etc.
Ci None m3
- b. Dry compressible waste, contaminated equipment, etc.
m None Ci m3
- c. Irradiated components, control rods, etc.:
Ci None ST ND Shipped from Processor(s) for Burial or Disposal Unit 1s' and 2005 Est. Total Error, %
Quarters 2005
- a. Spent resins, filter sludges, evaporator bottoms, etc.
m 93.50 E+00
+ 2.5 E+I Ci 9.31 E+01_
3
- b. Dry compressible waste, contaminated equipment, etc.
Ci None m3
- c. Irradiated components, control rods, etc.:
Ci None
- 2. Estimate of Major Nuclide Composition (By Type of Waste)
- a. Spent resins, filter sludges,
- b. Dry compressible waste,
- c. Irradiated components, control rods, evaporator bottoms, etc.
contaminated equipment, etc.
etc.
Isotope Percent (1)
Isotope Percent (1)
Isotope Percent (1)
Zinc-65 3.38 E+01 %
Iron-55 6.51 E+01 %
N/A N/A Cesium-137 1.36 E+01 %
Zinc-65 4.94 E+00 %
Cobalt-60 2.11 E+01 %
Cobalt-60 1.75 E+01 %
Nickel-63 9.72 E+00 %
Manganese-54 4.16 E+00 %
Manganese-54 4.60 E+00 %
Nickel-63 1.00 E+00 %
Iron-55 1.09 E+01 %
Cesium-137 2.18 E+00 %
Cesium-134 2.60 E+00 %
Cerium-144 3.27 E+00 %
Antimony-122 3.83 E+00 %
I1 ki)
Note:
Includes only tnose nuclues mat are greater man I/o or tne total activity.
Sections A. 1. and A.2. above do not include the data for the waste shipments from VY to the processors. The data for this waste will be included in the report that covers the year that this waste is shipped from the processor for burial or disposal.
TABLE 3 (Continued)
Vermont Yankee Effluent and Waste Disposal Annual Report First and Second Quarters, 2005 - Solid Waste and Irradi ted Fuel Shipments Reviewed by/z(
R RP Dept.)
Disposition of solid waste shipments (1 st and 2nd Quarters) 3.
Number of From From Mode of Destination Shipments VY Processor Transportation Processor Burial or Disposal Truck
- Studsvik, Envirocare Erwin, TN Clive, UT Truck Studs vik, Duratek Erwin, TN Barnwell, SC x
Truck GTS Duratek & RACE Envirocare Oak Ridge & Memphis, TN Clive, UT GTS Duratek Oak Ridge, TN RACE I x
~Truck RC Memphis, TN 4
x Truck
- Studsvik, 4
- xErwin, TN
- 4. Irradiated Fuel Shipments (Disposition):
None
- 5. Additional Data (1st and 2nd Quarters)
Supplemental Shipments from Shipments from VY Shipments from Information VY to Processors for Burial or Disposal Processors for Burial or IDisposal Class of solid waste AU, B None AU, B shipped Type of containers used Strong Tight, Type A None Strong Tight, Type B Solidification agent or None None None absorbent
TABLE 3 (Continued)
Vermont Yankee Effluent and Waste Disposal Annual Report Third and Fourth Quarters, 2005 - Solid Waste and Irad'ated Fuel Shipments Reviewed by,/,. ýiý,(RP Dept.)
B. SOLID WASTE SHIPPED OFFSITE FOR BURIAL OR DISPOSAL (not irradiated fuel)
- 1. Type of Waste Shipped from Processor(s) for Burial or Disposal Unit
[
rrd 2005 Est. Total Error, %
8Quarters 2005
- a. Spent resins, filter, sludges, evaporator bottoms, etc.
i3 4.80 E+00
+2.50 E+01 Ci 1.09 E+02
- b. Dry compressible waste, contaminated equipment, etc.
Ci 5.20 E+00
+2.50 E+01 m3
- c. Irradiated components, control rods, etc.
Ci None
- 2. Estimate of Major Nuclide Composition (By Type of Waste)
- a. Spent resins, filter sludges,
- b. Dry compressible waste,
- c. Irradiated components, control rods, evaporator bottoms, etc.
contaminated equipment, etc.
etc.
Isotope Percent (1)
Isotope
[ Percent (1)
Isotope Percent (1)
Zinc-65 2.18 E+01 %
Iron-55 6.12 E+01 %
N/A N/A Cesium-137 1.18 E+01 %
Zinc-65 8.85 E+01 %
Cesium-134 1.11 E+00 %
Cobalt-60 1.95 E+01 %
Cobalt-60 2.34 E+01 %
Manganese-54 5.45 E+00 %
Nickel-63 7.74 E+00 %
Cesium-137 1.38 E+00 %
Manganese-54 6.55 E+00 %
Cerium-144 3.01 E+00 %
Iron-55 2.11 E+01%
Cobalt-58 1.09 E+00 %
Chromium-5i 3.27 E+00 %
(1) Includes only those nuclides that are greater than 1% of the total activity.
Note: Sections A. 1. and A.2. above do not include the data for the shipments from VY to the processors.
The data for this waste will be included in the report that covers the year that this waste is shipped from the processor for burial or disposal.
TABLE 3 (Continued)
Vermont Yankee Effluent and Waste Disposal Annual Report Third and Fourth Quarters, 2005 - Solid Waste and Irradiated Fuel Shipments Reviewed by4
_(RP Dept.)
- 3.
Disposition of Solid Waste Shipments (3rd and 4 th Quarters)
Number of From From Mode of Destination Shipments VY Processor Transportation Processor Burial or Disposal Studsvik 6
X TruckEriT Erwin, TN GTS Duratek Oak Ridge, TN Studsvik Envirocare Erwin, TN Clive, UT GTS Duratek & RACE Envirocare Oak Ridge & Memphis, TN Clive, UT Studsvik CNS, Inc.
Erwin, TN Barnwell, SC 5
X Truck RACE Memphis, TN
- 4. Irradiated Fuel Shipments (Disposition): None
- 5.
Additional Data (3 rd and 4th Quarters)
Supplemental Shipments from VY to Shipments from VY for Shipments from Processors for Burial or Information Processors Burial or Disposal Disposal Class of solid waste AU, B None AU, B, C shippedAUBNoeA,,C Type of containers used Strong Tight, Type A None Strong Tight, Type B Solidification agent or None None None absorbent I