4 Et
' En tergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Vermont Yankee 322 Governor Hunt Rd.
P.O. Box 157 Vernon, VT 05354 Tel 802-257-7711 March 10, 2004 BVY-04-024 United States Nuclear Regulatory Commission ATITN: Document Control Desk Washington, D.C. 20555
Reference:
(a) License No. DPR-28 (Docket No. 50-271)
In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of February, 2004.
Sincere]
Kevin H. Bronson General Manager, Plant Operations cc: USNRC Region I Administrator USNRC Resident Inspector USNRC Project Manager 4,
k e;'
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 04-02 FOR THE MONTH OF FEBRUARY 2004
OPERATING DATA REPORT DOCKETNO.50-271 DATE 040310 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS
- 1. Unit Name:
Vermont Yankee
- 2. Reporting Period:
February
- 3. Licensed Thermal Power(MWt):1593
- 4. Nameplate Rating(Gross MWe): 540
- 5. Design Electrical Rating(Net MWe):
522
- 6. Maximum Dependable Capacity(Gross MWe):
- 7. Maximum Dependable Capacity(Net MWe):
535 510
- 8. If changes, occur in capacity ratings(Items Number 3 last report, give reasons:
through 7) since
- 9. Power level to which restricted, if any(Net MWe):
N/A
- 10. Reasons for restrictions, if any:
N/A This Month Yr-to-Date Cumu.
- 11. Hours in Reporting Period 696.00 1440.00 271
- 12. Number Of Hours Reactor was Critical 696.00 1440.00 23:
- 13. Reactor Reserve Shutdown Hours 0.00 0.00
- 14. Hours Generator On-Line 696.00 1440.00 22!
- 15. Unit Reserve Shutdown Hours 0.00 0.00
- 16. Gross Thermal Energy Generated(MWH) 1107383.25 2291841.10 34826,
- 17. Gross Electrical Energy Generated(MWH) 381960.00 790751.00 11702:
- 18. Net Electrical Energy Generated(MWH) 366833.00 759521.00 11138i
- 19. Unit Service Factor 100.00 100.00
- 20. Unit Availability Factor 100.00 100.00
- 21. Unit Capacity Factor(Using MDC Net) 103.30 103.40
- 22. Unit Capacity Factor(Using DER Net) 101.00 101.00
- 23. Unit Forced Outage Rate 0.00 0.00
- 24. Shutdowns scheduled over next 6 months(Type, Date, and Duration of Each: 04/03/2004 to 05/03/2004 for scheduled refueling outage.
- 25. If shut down at end of report period, estimated date of startup: N/A
- 26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION lative 5361.80 3241.22 0.00 9566.69 0.00 4830.82 3003.00 5032.00 83.10 83.10 79.70 78.10 3.82 VYDPF 0411.01 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13.F01.19F
AVERAGE DAILY UNIT POWER LEVEL COIM MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE (MWe-Net)
(ME DOCKET NO. 50-271 UNIT Vermont Yankee DATE 040310 IPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 DAILY POWER LEVEL le-Net) 1.
527 17.
528 2.
527 18.
523 3.
526 19.
528 4.
527 20.
528 5.
527 21.
527 6.
527 22.
527 7.
527 23.
527 8.
528 24.
528 9.
527 25.
528 10.
527 26.
527 11.
527 27.
522 12.
13.
14.
15.
16.
527 527 528 528 527 28.
528 29.
528 30.
31.
INSTRUCTIONS:
On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
VYDPF 0411.02 (Sample)
DP 0411-Rev. 8 Page 1 of 1 RT No. 13.FO1.18V
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH FEBRUARY DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 040310 COMPLETED BY G.A. Wallin TELEPHONE (802)258-5414 1
2 3
4 5
Cause and Corrective Action to Prevent No.
Date Type Duration Reason Method of License System Component Recurrence.
Shutting Event Code Code (hours)
Down Report #
. Reactor (None) 1 F: Forced S: Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-(Explain) -
3 Method:
4 1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Other (Explain)
Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I -
Same Source VYDPF 0411.03 DP 0411 Rev. 8 Page 1 of 1
DOCKET NO. 50-271 DATE 040310 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH February
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.8% of rated thermal power for the month.
Gross electrical generation was 381,960 MWHe or 100.5% design electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 99.9%
of rated thermal power.
There were no items of interest to report for this month.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.