BVY-04-012, January 2004 Monthly Operating Report for Vermont Yankee

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Vermont Yankee
ML040490532
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/10/2004
From: Bronson K
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY-04-012
Download: ML040490532 (6)


Text

I Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Vermont Yankee 322 Governor Hunt Rd.

RO. Box 157 Vernon, Vr 05354 Tel 802-257-7711 February 10, 2004 BVY-04-012 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Reference:

(a) License No. DPR-28 (Docket No. 50-271)

In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of January, 2004.

Sincer Kevin H. B n

General Manager, Plant Operations cc: USNRC Region I Administrator USNRC Resident Inspector USNRC Project Manager

VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 04-01 FOR THE MONTH OF JANUARY 2004

(

OPERATING DATA REPORT DOCKETNO.50-271 DATE 040210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS

1. Unit Name:

Vermont Yankee

)d:

January 2.

3.

Reporting Peric Licensed Thermal Power(MWt):1593

4. Nameplate Rating(Gross MWe): 540
5. Design Electrical Rating(Net MWe):

522

6. Maximum Dependable Capacity(Gross MWe):
7. Maximum Dependable Capacity(Net MWe):

535 510

8. If changes, occur in capacity ratings(Items Number last report, give reasons:

3 through 7) since

9. Power level to which restricted, if any(Net MWe):

N/A

10. Reasons for restrictions, if any:

N/A This Month Yr-to-Date Cumu.

11. Hours in Reporting Period 744.00 744.00 27'
12. Number Of Hours Reactor was Critical 744.00 744.00 23:
13. Reactor Reserve Shutdown Hours 0.00 0.00
14. Hours Generator On-Line 744.00 744.00 221
15. Unit Reserve Shutdown Hours 0.00 0.00
16. Gross Thermal Energy Generated(MWH) 1184457.85 1184457.85 34715
17. Gross Electrical Energy Generated(MWH) 408791.00 408791.00 11664:
18. Net Electrical Energy Generated(MWH) 392688.00 392688.00 11101'
19. Unit Service Factor 100.00 100.00
20. Unit Availability Factor 100.00 100.00
21. Unit Capacity Factor(Using MDC Net) 103.50 103.50
22. Unit Capacity Factor(Using DER Net) 101.10

-101.10

23. Unit Forced Outage Rate 0.00 0.00
24. Shutdowns scheduled over next 6 months(Type, Date, and Duration of Each: 04/03/2004 to 05/03/2004 for scheduled refueling outage.
25. If shut down at end of report period, estimated date of startup: N/A
26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION lative 5665.80 2545.22 0.00 3870.69 0.00 7447.57 1043.00 9199.00 83.00 83.00 79.60 78.00 3.83 VYDPF 0411.01 (Sample)

DP 0411 Rev. 8 Page 1 of 1 RT No. 13.F01.19F

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee DATE 040210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

MONTH January DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.

529 17.

527 2.

529 18.

528 3.

529 19.

527 4.

528 20.

527 5.

528 21.

528 6.

528 22.

527 7.

529 23.

528 8.

529 24.

527 9.

529 25.

527 10.

528 26.

527 11.

528 27.

527 12.

528 28.

527 13.

528 29.

527 14.

527 30.

527 15.

525 31.

527 16.

526 INSTRUCTIONS:

On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

VYDPF 0411.02 (Sample)

DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.18V

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH JANUARY DOCKET NO 50-271 UNIT NAME Vermont Yankee DATE 040210 COMPLETED BY G.A. Wallin TELEPHONE (802)258-5414 1

2 3

4 5

Cause and Corrective Action to Prevent No.

Date Type Duration Reason Method of License System Component Recurrence.

Shutting Event Code Code (hours)

Down Report #

Reactor (None) 1 F: Forced S: Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-(Explain) -

3 Method:

4 1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

Exhibit G-Instructions for Preparation of Data Entry Sheets for License Event Report (LER) File (NUREG 0161) 5 Exhibit I -

Same Source VYDPF 0411.03 DP 0411 Rev. 8 Page 1 of 1

DOCKET NO. 50-271 DATE 040210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH January

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.9% of rated thermal power for the month.

Gross electrical generation was 408,791 MWHe or 100.6% design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 99.9%

of rated thermal power.

There were no items of interest to report for this month.

At the end of the reporting period the plant was operating at 99.9% of rated thermal power.

VYDPF 0411.04 (Sample)

DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.18X