Text
PEn tergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Vermont Yankee 322 Governor Hunt Rd.
RO. Box 157 Vernon, VT 05354 Tel 802-257-7711 December 10, 2003 BVY-03-109 United States Nuclear Regulatory Commission ATFN: Document Control Desk Washington, D.C. 20555
Reference:
(a) License No. DPR-28 (Docket No. 50-271)
In accordance with section 6.6.B of the Vermont Yankee Technical Specifications, submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of November, 2003.
Sincerely Kevin H. Bronson General Manager, Plant Operations cc: USNRC Region I Administrator USNRC Resident Inspector USNRC Project Manager
!-- 6;
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 03-11 FOR THE MONTH OF NOVEMBER 2003
OPERATING DATA REPORT DOCKETNO.50-271 DATE 031210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 OPERATING STATUS
- 1. Unit Name:
Vermont Yankee
- 2. Reporting Period:
November
- 3. Licensed Thermal Power(MWt):1593
- 4. Nameplate Rating(Gross MWe): 540
- 5. Design Electrical Rating(Net MWe):
522
- 6. Maximum Dependable Capacity(Gross MWe):
- 7. Maximum Dependable Capacity(Net MWe):
535 510
- 8. If changes, occur in capacity ratings(Items Number
- last report, give reasons:
3 through 7) since
- 9. Power level to which restricted, if any(Net MWe):
N/A
- 10. Reasons for restrictions, if any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720.00 8016.00 274177.80
- 12. Number Of Hours Reactor was Critical 720.00 7908.39 231057.22
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 720.00 7868.91 227382.69
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated(MWH) 1142350.55 12418098.15 344798514.94
- 17. Gross Electrical Energy Generated(MWH) 393679.00 4246413.00 115827343.00
- 18. Net Electrical Energy Generated(MWH) 378082.00 4055001.00 110237360.00
- 19. Unit Service Factor 100.00 98.20 82.90
- 20. Unit Availability Factor 100.00 98.20 82.90
- 21. Unit Capacity Factor(Using MDC Net) 103.00 99.20 79.50
- 22. Unit Capacity Factor(Using DER Net) 100.60 96.90 77.90
- 23. Unit Forced Outage Rate 0.00 1.55 3.86
- 24. Shutdowns scheduled over next 6 months(Type, Date, and Duration of Each: 04/03/2004 to 05/03/2004 for scheduled refueling outage.
- 25. If shut down at end of report period, estimated date of startup: N/A
- 26. Units In Test Status(prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13.F01.19F
- 01.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee DATE 031210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
- 1.
528
- 17.
521
- 2.
528
- 18.
528
- 3.
527
- 19.
521
- 4.
528
- 20.
527
- 5.
527
- 21.
527
- 6.
527
- 22.
528
- 7.
524
- 23.
528
- 8.
517
- 24.
528
- 9.
525
- 25.
528
- 10.
527
- 26.
527
- 11.
528
- 27.
528
- 12.
528
- 28.
527
- 13.
528
- 29.
527
- 14.
528
- 30.
528
- 15.
524
- 31.
- 16.
486 INSTRUCTIONS:
On this format, list the average daily unit power level in MWE-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
VYDPF 0411.02 (Sample)
DP 0411 Rev. 8 Page 1 of 1 RT No. 13.FO1.18V
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH NOVEMBER DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE 50-271 Vermont Yankee 031210 G.A. Wallin (802)258-5414 1
2 3
4 5
Cause and Corrective Action to Prevent No.
Date Type Duration Reason Method of License System Component Recurrence.
Shutting Event Code Code (hours)
Down Report #
Reactor (None) 1 F: Forced S: Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-(Explain) 3 Method:
4 1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Other (Explain)
Exhibit G-Instructions for Preparation of Data Entry Sheets for License_
Event Report (LER) File:
(NUREG 0161) 5 Exhibit I -
Same Source VYDPF 0411.03 DP 0411 Rev. 8 Page 1 of 1
DOCKET NO. 50-271 DATE 031210 COMPLETED BY G.A. WALLIN TELEPHONE (802)258-5414 REPORT MONTH November
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.5% of rated thermal power for the month.
Gross electrical generation was 393,679 MWHe or 100.1% design electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 100.0%
of rated thermal power.
There were no items of interest to report for this month.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.