BSEP 15-0039, Resident Inspector Site Bandwidth Enhancement Project

From kanterella
(Redirected from BSEP 15-0039)
Jump to navigation Jump to search
Resident Inspector Site Bandwidth Enhancement Project
ML15146A305
Person / Time
Site: Brunswick  
Issue date: 05/06/2015
From: Pope A
Duke Energy Progress
To: Shankar K
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 15-0039
Download: ML15146A305 (5)


Text

Brunswick Nuclear Plant DUKE P.O. Box 10429 SENERGY.

Southport, NC 28461 MAY 0 6 2015 Serial: BSEP 15-0039 U.S. Nuclear Regulatory Commission ATTN: Ms. Kala Shankar (Mail Stop TWFN 5E2) 11555 Rockville Pike Rockville, MD 20852

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Resident Inspector Site Bandwidth Enhancement Project

References:

1. Letter from Scott A. Morris (NRC) to William R. Gideon (Duke Energy),

Request for Support of Resident Inspector Site Bandwidth Enhancement Project, dated April 8, 2015, ADAMS Accession Number ML15044A477

2. Letter from Kala Shankar (NRC) to Lee Grzeck (Duke Energy), Request for Support of Resident Inspector Site Bandwidth Enhancement Project Support, dated April 21, 2015

Dear Ms. Shankar:

In accordance with the request contained in Reference 2, Duke Energy Progress, Inc., is submitting a cost estimate to perform the work described in Attachment 1 of Reference 2. This work is in association with the Resident Inspector Site Bandwidth Enhancement Project (i.e.,

Reference 1).

The cost estimate contained in the enclosure of this letter provides a breakdown of the labor and parts as required and described in Reference 2.

This document contains no regulatory commitments.

Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.

Sincerely, Annette H. Pope Director - Organizational Effectiveness Brunswick Steam Electric Plant AHP/mkb

U.S. Nuclear Regulatory Commission Page 2 of 2

Enclosure:

Cost Estimate for Resident Inspector Site Bandwidth Enhancement Project cc (with enclosure):

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 U.S. Nuclear Regulatory Commission, Region II ATTN: Mr. Victor M. McCree, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A)

(Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U.S. Nuclear Regulatory Commission ATTN: Mr. Harvey J. Spiro (Mail Stop 3WFN 4C64) 11601 Landsdown Street North Bethesda, MD 20852 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC

BSEP 15-0039 Enclosure Brunswick Steam Electric Plant, Units Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Resident Inspector Site Bandwidth Enhancement Project Cost Estimate for Resident Inspector Site Bandwidth Enhancement Proiect

(

DUKE ENERGY.

PROGRESS Duke Energy Progress P.O. Box 10429 Southport, NC 28461 Cost Estimate for Resident Inspector Site Bandwidth Enhancement Project Brunswick Steam Electric Plant Estimate to Test and Extend (4) New T-1 Circuits from the BNP Telecom Hut to the NRC Suite located in the BNP TAC Building.

Work Scope Test Circuits in Telecom Hut Cross connect circuits from Telecom Hut to TAC data center Pull (4) new cables from the TAC datacenter to the NRC Suite Terminate (4) cables and test Test T-1 circuits in NRC Suite Cost Break Down Labor: $5,200 Materials: $800 Total: $6,000 www.duke-energy.com

i i t

DUIý ENERGY P.O. Box 10429 Southport, NC 28461 Iu**.

I U S NUCLEAR REGULATORY COMMISSION ATTN DOCUMENT CONTROL DESK WASHINGTON DC 20555-0001