BSEP 03-0135, Operator Licensing Examination Data

From kanterella
(Redirected from BSEP 03-0135)
Jump to navigation Jump to search
Operator Licensing Examination Data
ML032690195
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/15/2003
From: O'Neil E
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 03-0135
Download: ML032690195 (4)


Text

Progress Energy SEP 5 2003 SERIAL: BSEP 03-0135 Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 OPERATOR LICENSING EXAMINATION DATA Ladies and Gentlemen:

This submittal provides the Progress Energy Carolinas, Inc. (PEC) response to NRC Regulatory Issue Summary 2003-14, "Preparation and Scheduling of Operator Licensing Examinations" for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2. The enclosed NRC Form 536, "Operator licensing Examination Data," provides a proposed operator licensing examination schedule, the estimated number of applicants to be tested, and a proposed generic fundamentals examination schedule for calendar years 2004 through 2007.

Please refer any questions regarding this submittal to Mr. Leonard R. Beller, Supervisor -

Licensing/Regulatory Programs, at (910) 457-2073.

Sincerely, Edward T. O'Neil Manager - Support Services Brunswick Steam Electric Plant GLM:glm

Enclosure:

NRC Form 536, "Operator licensing Examination Data" Progress Energy Carolinas, Inc.

Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461

Document Control Desk BSEP 03-0135 / Page 2 cc:

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATIN: Mr. Michael E. Emstes, NRC Region II Chief, Operator Licensing and Human Performance Branch Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Eugene M. DiPaolo, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission ATTN: Ms. Brenda L. Mozafari (Mail Stop OWEN 8G9) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510

ENCLOSURE BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 OPERATOR LICENSNG EXAMINATION DATA NRC Form 536. "Operator Licensing Examination Data"

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 E)XPlRES: 07/3112005 (5-2003)

Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (1-64 E6). U.S. Nuclear Regulatory OPERATOR LICENSING

~~~~Commission, Washington. DC 20555-0001. or by Internet e-mail to EXAMINATION DATA Infocollectstnr¢.gOv, and to the Desk Officer. Office of Information and Raulatory Affairs, NEOB-10202. (3150-0131), Office of Management and Budgt.

ashigto. D 2053.

f ameans used to Impose an Information collection does not ispay a c~ur~rentlyvalid0MB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the ifomiation coillen.

FACILNY NRC REGION BRUNSWICK STEAM ELECTRIC PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2,0W Cy 2,005 CY 2,00 Cy 2 007 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 0

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 1

0 EXAMINATIONS 0

B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER 2004 CY 2,'0 CY20 6 CyZ,0 NUMBER OF REACTOR 1

0 6

OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4

0 3

0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3

0 3

0 NUMBER OF SENIOR REACTOR OPERATORS - UMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 11/01/2004 08/07/2006 ALTERNATE DATE 11/08/2004 08/14/2006 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED Cy 2004 CY 2005 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED I

NUMBER OF E

LP T M

E E

_DDAE 0

NR FORM 53in-20)

PRINTED ON RECYCLED PAPER