Issue date: 02/28/1995
From: Harrison F, Levis W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-95-0122, BSEP-95-122, NUDOCS 9503170106
Download: ML20081C080 (8)


Text

.

Brunswick Nuclear Plant P. O. Box 10429 Southport, NC 28461-0429 MAR 101995 FILE:

B09-135100 BSEP/95-0122 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS.11PR-71 AND DPR-62 MONTHLY OPERATING REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.11 for the Brunswick Nuclear Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report. of operating statistics and shutdown experience for the month of February 1995.

Very truly yours, W. Levis, Plant Manager - Unit 1 Brunswick Nuclear Plant FH/mcg MSC/93-8524 cc:

Mr. S. D. Ebneter, Regional Administrator, Region II Mr. C. A. Patterson, Brunswick NRC Senior Resident Inspector Mr. D. C. Trimble, NRR Project Manager - Brunswick Units 1 and 2 The Honorable H. Wells, Chairman - North Carolina Utilities Commission File B-X-0520.2 16000J 9503170106 950228 PDR ADOCK 05000324 R

PDR j

Enclosure List of Regulatory Commitments The following. table identifies those actions committed to by Carolina Power & Light Company ih this document. Any other actions discussed in the submittal represent intended or planned actions by Carolina Power & Light Company. They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Manager-Regulatory Affairs at the Brunswick Nuclear Plant of any questions regarding this document or any associated regulatory commitments.

Committed Commitment date or outage NONE-

-[

'CP&LLCO:

PLANT PERFORMANCE DATA SYSTEM PAGE 1

RUN.DATE. 03/06/95 APPENDIX B - AVERAGE DAILY POWER LEVEL-RPD39-000

.{

3RUN_ TIME 10:29:38.

BRUNSWICK UNIT 1 r

050-0.d5 DOCKET NO.

COMPLETED BY FRANCES HARRISON

. TELEPHONE (910)457-2756

' FEBRUARY 1995-

[

i

.DAYE AVG.. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 793 17 790 2

749 18 791

.!3 3

> >.?

19 693

.4 792 20

~793 l

5 793 21 791

.l 6

793 22 791 i

7 794 23 792 i

8 793.

24 792 9

792 25 792 I

10 792 26 792 l

'll 790 27 791

'l 13 791 28.

791 Il

'13 791 l

t 3

14 792 15 791 1

16 790

)

i 1.16 - 8 i

-i

.'l

'CP&L CO PLANT PERFORMANCE DATA' SYSTEM PAGE 1

RUN-.DATE 03/06/95_

OPERATING DATA REPORT RPD36-000

'RUN TIME 10:29:39:

BRUNSWICK UNIT 1 E

DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 1-NOTES 2.

REPORTING PERIOD: FEBRUARY 95

3. LICENSED THERMAL POWER (MWT): 2436 4 '. NAMEPLATE RATING (GROSS MWE): 867.0

,5. DESIGN ELECTRICAL RATING (NET MWE): 821.0

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0

~8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 672.00 1416.00 157368.00 f
12. NUMBER OF HOURS REACTOR CRITICAL 672.00 1416.00 97287.32
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10

14. HOURS GENERATOR ON LINE 672.00 1416.00 93372.99
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH) 1626526.94 3424452.79 204960179.68
17. GROSS ELEC. ENERGY GEN. (MWH) 543075.00 1143640.00 67303365.00
18. NET ELEC. ENERGY GENERATED (MWH) 528648.00 1112818.00 64711857.00
19. UNIT SERVICE FACTOR 100.00 100.00 59.33
20. UNIT AVAILABILITY FACTOR 100.00 100.00 59.33
21. UNIT CAP. FACTOR (USING MDC NET) 102.57 102.46 52.41
22. UNIT CAP. FACTOR (USING DER NET) 95.82 95.72 50.09
23. UNIT FORCED OUTAGE RATE

.00

.00 14.74

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

Unit 1 is scheduled for 55 days Refueling Outage - 4/1/95-5/25/95.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START "P:
36. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAE1 ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY i

COMMERCIAL OPERATION i

1 I

1 1.16 - 9 l

DOCKET NO.

050-0325 UNIT NAME Brunswitt I DATE March 1995 COMPLETED BY Frances Harriscs1 TELEPHONE 910-457-2756 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH February 1995 METHOD OF LICEN3EE

"'EATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO NO.

DATE TYPE (1)

.dOURS)

REASON (2)

REACTOR (3)

REPORT NO.

(4)

CODE (5)

PREVENT REC 1RRENCE 95-011 2/19/95 F

0 A

5 N/A CH PUMPXX Reduced power to 60% due to 1A Reactor Feed Pump 011 Leak.

1A Reactor Feed Pump was shut down to repair the failed oil line connection and refill the sump. Following repairs.

lA RFP was placed back in service.

1:

hpg 2:

Reason 3:

Method 4: System Code:

5.

Comconent Code F - Forced A-Equipment Failure 1-Manual Instructions for Instructions for 5 - Scheduled (explain) 2-Manual Scram preparation of data entry preparation of data B-Maintenance or test 3-Automatic scram sheets for Licensee Event entry sheets for LER C-Refueling 4-Continuations Report (LER) file from file from IEEE D-Regulatory 5-Load reductions IEEE Standard 805-1933.

Standard 803A-1983.

restriction 6-Other per NUREG-1022.

per NUREG-1022.

E-Operator Training &

Section VI. Item 13.b Section VI. Item 13.c License Examination F-Administrative G-Operational error (explain)

H-Other (explain)

-CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2

RUN DATE 03/06/95 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 10:29:38 BRUNSWICK UNIT ~2

-4 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHOJF (910)457-2756 I

FEBRUARY 1995 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 772 17 773 2

770 18 774 3

772 19-772 4

765 20 774 5

679 21 773 6

770 22 773 7

772 23 773 8

773 24 773 9

773 25 772 10 774 26 765 l

11-773 27 772 13 774 28 771 13 774 14 774 l

15 773 16 773 i

i 1

1.16 - 8 i

l l

i

1 CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE _

2 RUN DATE 03/06/95 OPERATING DATA REPORT RPD36-000 RUN TIME 10:29:39 BRUNSWICK UNIT 2 l

DOCKET NO. 050-0324 i

COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756 s

1. UNIT NAME: BRUNSWICK UNIT 2 NOTES
2. REPORTING PERIOD: FEBRUARY 95
3. LICENSED THERMAL POWER (MWT): 2436
4. NAMEPLATE RATING (GROSS MWE): 867.0 i
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 1
6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 782.0 i
7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

i

10. REASONS FOR RESTRICTION IF ANY:

)

i

.I THIS YR TO CUMUL MONTH DATE ATIVE i

11. HOURS IN REPORTING PERIOD 672.00 1416.00 169392.00
12. NUMBER OF HOURS REACTOR CRITICAL 672.00 1416.00 105971.70
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00

.00

14. HOURS GENERATOR ON LINE 672.00 1416.00 100533.71 l
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH) 1628602.42 3424493.73 215674830.23
17. GROSS ELEC. ENERGY GEN. (MWH) 530625.00 1116355.00 69765976.00
18. NET ELEC. ENERGY GENERATED (MWH) 516619.00 1085712.00 66918971.00
19. UNIT SERVICE' FACTOR 100.00 100.00 59.35
20. UNIT AVAILABILITY FACTOR 100.00 100.00 59.35
21. UNIT CAP. FACTOR (USING MDC NET) 101.96 101.69 50.50 l
22. UNIT CAP. FACTOR (USING DER NET) 93.64 93.39 48.12
23. UNIT FORCED OUTAGE RATE

.00

.00 11.93

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

i

.)

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i

1.16 - 9

DOCKET NO.

050-032a UNIT NAME erunswick 11 DATE Ma rn 1995 CaiPLETED BY Frances Harrison TELEPHONE 910 a57-2756 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH February 1995 METHOD OF LICENSEE DURATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO NO.

DATE TYPE (1)

(HOURS)

REASON (2)

REACTOR (3)

REPORT NO.

(4)

CODE (5)

PREYENT RECURRENCE 95-008 2/4/95 5

0 B

5 N/A SN LCV Reduced power to 601 for large Valve Testing and Rod Imorovment.

1:

112:

2:

Reason 3:

Mathod 4: System Code:

5.

Component Code F - Forced A-Equipment Failure 1-Manual Instructions for Instructions for S - Scheduled (explain) 2-Manual Scram preparation of data entry preparation of data B-Maintenance or test 3-Automatic scram sheets for Licensee Event entry sheets for LER C-Refueling 4-Continuations Report (LER) file from file from IEEE D-Regulatory 5-Load reductions IEEE Standard 805-1903.

Standard 803A-1983, restriction 6-Other per NUREG-1022.