1

.e.

2 i

i

.t l.

DOCKET NO.t 050-0325 l

UNIT:

Brunswick 1~

DATE: February 1988 COMPLETED BY:

Frances Harrison i

r OPERATIONS

SUMMARY

BRUNSh'ICK UNIT 1

.l L

-Brunswick Unit 1 operated at a 69.93 percent capacity factor and a 74.12 percent availability factor. The unit was shut down at 2329 on 1/23/88 for a maintenance outage.

There are 1016 Bh'R and 160 Ph'R spent fuel bundles in the Brunswick Unit 1 fuel I

l Poo1+

l i

i i

l

.[

t i

v i

I I

l I

1 i

i

/()b t

'900302028'4 880131

\\ \\

^

PDR R

ADOCK 05000324

(

DCD 1---

' ' ~ ~ ~

~

c.

J. :

,CP&L'C0 PLANT PERFORMANCE DATA SYSTEM PAGE i

RUN DATE 02/01/88 OPERATING DATA REPORT RPD36-000 RUM TIME 13:05:55 BRUNSWICK UNIT i DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (919)457-2756 i.' UNIT NAME: BRUNSWICK UNIT i i NOTES I

2. REPORTING PERIOD: JANUARY 88 l

l

[

.3.

LICENSED THERMAL POWER (HWT): 2436 I

l

4. NAMEPLATE RATING (GROSS MWE)- 867.0 1

1

5. DESIGN ELECTRICAL RATING (NET MWE); 821.0 l

l

6. MAX DEPENDABLE CAPACITY (GROSS MWE) 815.0 l l
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0
8. IF CHANGES 0CCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS-t
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE);

I

10. REASONS FOR RESTRICTION IF ANY:

l THIS YR TO CUMUL MONTH DATE ATIVE i

ti. HOURS IN REPORTING PERIOD 744.00 744.00 95328.00

12. NUMBER OF HOURS REACTOR CRITICAL 562.52 562.52 61506.41
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10

14. HOURS GENERATOR ON LINE 551.48 551.48 58419.11
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH) 1287049.88 1287049.88 123266485.64
17. GROSS ELEC. ENERGY GE,<.

(MWH) 424985.00 424985.00 40534535.00

18. NET ELEC. ENERGY GENERATED (MWH) 411048.00 411048.00 38956019.00
19. UNIT SERVICE FACTOR 74.12 74.12 61.28
20. UNIT AVAILABILITY FACTOR 74.12 74.12 61.28 i
21. UNIT CAP. FACTOR (USING MDC NET) 69.93 69.93 51.73
22. UNIT CAP. FACTOR (USING DER NET) 67.29 67.29 49.77

[

23. UNIT FORCED OUTAGE RATE

.00

.00 16.97 i

24. SHUTDOWNS SCHED. DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

?

i i

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

e

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED j

INITIAL CRITICALITY INITIAL ELECTRICITY T

COMMERCIAL OPERATION

[

i

[

1.16 - 9

[

DOCRETNO. 050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS Brunswick 1-UNIT N AME DATE February 1988 COMPLETED gy Frances H&rrison REPORT MONTy January 1988 TELEPHONE 919-457-2756 l

i u. :

E

=

E4 I 8tef8W

(,ause It Captgettive 9

1 E

7 2 E Event sY

'?

Atisun s..

Da8C U

?

?

j 8,Eg Repaws

  • N0 0

Present Retussente S

[8 5

6 88006 880123 S

In B

1 N/A

}taintenance Outage Progresi i

1 I

3 4

F: Fewced Reas.m -

Method:

Exhibis G-Insieucti.ms 5: Scheduled A Equipment Iailure(Explain) 1 Manual f.w Pseparation of Data B-Maintenance of Test 2-Manual Scram.

Entr> SI.ects foe Licensee C-Refueling 3-Auteniatic Scram.

Event RepoeilLER) Filc lNUREG-0161i D-Regulatin) Resisiction 4dontinuations E-Opesator Training & Ucense Emanunation F-Adnunist rative 5-Load Reductions 3

G-Opeeatiimal Esis.e 11:aplain1

(,-0ther E slabit I. Sanw Souru IW77) 11 Othee IE splam p

-w-T-'

-r+

t

?wg r

=-t m

7

i r

A

.e

CP&L C0 PLANT PERFORMANCE DATA SYSTEM PAGE 1

RUN DATE 02/01/88 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 l RUM TIME 13:05:53 BRUNSWICK UNIT 1 i

I DOCKET NO. 050-0325

(

COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-2756 i

t lLJANUARY 1988 i

DAY-AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL i

(MWE-NET)

(MWE-NET) j i

762 17 765 2

776 18 778 I

i 3

777 19 779 4

777 20 780 I

5 780 21 779 i

i l

6 777 22 757 l

7 773 23 153 f

8 777 24

-13 I

9.

777 25

-10 10 768 26

-10 j 11 776 27

-9 12 776 28

-9 i

i 13 778 29

-9 1 14 779 30

-9 i

I 15 780 31

-8 l

d 2

1 16 778 ij k

l 1.16 - 8 i

l

_, -.I i

.h

-CP&L'C0 PLANT PERFORMANCE DATA SYSTEM PAGE 2

RUN DATE. 02/01/08 OPERATING DATA REPORT-RPD36-000

! RUN. TIME 13:05:55 BRUNSWICK UNIT 2 t

i

- 050-0324 DOCKET NO.

l COMPLETED BY FRANCES HARRISON i

i OPERATING STATUS TELEPHONE _ (919)457-2756 l

1 j

i. UNIT NAME: BRUNSWICK UNIT 2 i NOTES 1

i

2. REPORTING PERIOD: JANUARY 88 I

J

3. LICENSED THERMAL POWER (MWT): 2436 I

l

-4.

NAMEPLATE RATING (GROSS MWE)- 867.0 l

l-l S. DESIGN ELECTRICAL RATING (NET MWE). 821.0 l

l l

l

6. MAX DEPENDABLE CAPACITY (GROSS MWE)- 815.0 1 1

l

7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 l

~~~------------------------

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

l i

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

.)

10. REASONS FOR RESTRICTION IF ANY:

i I

i THIS YR TO CUMUL l'

MONTH DATE ATIVE l

11. HOURS IN REPORTING PERIOD 744.00 744.00

.107352.00 l

12. NUMBER OF HOURS REACTOR CRITICAL 24.28 24.28 67148.70 j
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00

.00 t

14. HOURS GENERATOR ON LINE 24.28 24.28 63270.46 l
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00 l

16. GROSS THERMAL ENERGY GEN. (MWH) 37715.13 37715.13 129323502.22 i
17. GROSS ELEC. ENERGY GEN. (MWH) 11910.00 11910.00 41753581.00
18. NET ELEC. ENERGY GENERATED (MWH) 6114.00 6114.00 39998701.00 1
19. UNIT SERVICE FACTOR 3.26 3.26 58.94
20. UNIT AVAILABILITY FACTOR 3.26 3.26 58.94 l
21. UNIT CAP. FACTOR (USING HDC NET) 1.04 1.04 47.16 l
22. UNI 2 CAP. FACTOR (USING DER NET) 1.00 1.00 45.38
23. UNIT "9RCED OUTAGE RATE

.08

.08 13.77 l

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

l

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED

]

1 INITIAL CRITICALITY 1

INITIAL ELECTRICITY

-~~~----

COMMERCIAL OPERATION

't.16 - 9

e DOCKET NO.:

0$0 0324 UNIT:

Brunswick 2 DATE: February 1988 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSVICK UNIT 2 Brunswick Unit 2 operated at a 1.04 percent capacity factor and a 3.26 percent availability factor. There was one manual scram. The unit was shut down on 1/2/88 at 0018 for the refueling maintenance outage.

There are 1316* BVR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.

  • 376 of these bundles will be returned to the core after refueling.

~

=

-CP&L'C0 PLANT PERFORMANCE DATA SYSTEM PAGE 2

RUM DATE~ 02/01/88 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 13:05:53 BRUNSWICK' UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-2756 JANUARY-1988 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 468 17

-7 2

-9 18

-7 3

-11 19

-7 4

-11 20

-6 5

-11 21

-6 6

-11 22

~6 7

-11 23

-5 8

-10 24

-4 9

-8 25

-5.

10

-9 26

-4 11

-8 27

-4 12

-7 28

-4 13

-7 29

-4 14

-7 30

-4 15

-8 31

-4 16

-7 1.16 - 8 r

DOCKETNO. 050-0324 UNIT SHUTDOWNS AND P WER REDUCTIONS Brunswick 2 UNIT NAME DATE February 1988 COMPLETED BY Frances Harrison REPORT MONTil January 1988 TELEPHONE 919-457-2756-

~

E E

~

}

IAcusee

[ t,

{"'.

Cause & Correctiv,e j [5 17 25 Event g'g g8 Action to DJrc i

3?

?

g' Prevent Recurrence y

j ;f, Report e mO 6-6 88002 880102 F

A 2

Reactor scram due to cond nser low vacuum 3

4 F: Forced Reason:

Method:

Exhibit G -Instructiims S Scheduled A. Equipment Failure (Explain) l-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-0161)

D-Regulatory Restriction I.dontinuations l

E-Operator Training & License Examination F.Administ rative 5-load Reduction,s 5

G-Operational Error (Explain) 6-Other E xhibii I - Same Source 19/77)

Il-Other (E xplain)

~

DOCKET NO.

050-0324 UNIT SHUTDOWNS AND P WER REDUCTIONS UNIT NAME Brunswick 2 DATE February 1988 COMPLETED BY Frances Harrison REPORT MONTil January 1988 TELEPHONE 919-457-2756 E

~

Litensee jg ja.

Cause & Correceiv,e j ~Ei

[?

Action 'au W

I)aec i

3j 4

.2 5

Eveni

{]

g3 f:

5

~ ;f, =!

Report e mO O

Prevent Recurrence H

ov e

d Refueling / Maintenance Outake 88003 880102 S

In C

2 N/A RC FUELXX-Progresu I

2 3

4 F: Forcet!

Reason:

Method:

Exhibii G - Instructions 5: Scheduled A-Equipment Failure (Explain)

I Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File tNUREG-016Ii D Regulatory Resteiction l-Tontinu tions 1

i E-Operator Training & License Examination F.Administ rative 5-Load Reductions 5

G-Operational Error (Explain) 6-Other Exhibii 1 Same Source t's/77)

II 0 hcr (Explaini j

  • '.s

..I*y

/

.P.

Carolina Power & Light Company.

I Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429

' February 6, 1988 FILE: B09-13510C SERIAL: BSEP/88-0082 1

Mr. R. M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission 1

Washington, DC 20555 1

i BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DCCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING' REPORT l

Dear Mr. Scroggins In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of i

January 1988.

Very truly yours, d #a C. R. Dietz, General Manager Brunswick Steam Electric Plant i

FH/byc MSC/85-0014 Enclosures cc:

Mr. M. R. Beebe i -

Mr. T. C. Bell Dr. J. N. Grace Mr. M. D. Hill DESIGNAT" ORIG 1IAL Mr. P. W. Howe Mr. R. G. Oehl Cer'ified By ga Mr. W. H. Ruland Ms. H. M. Shaver Ms. D. J. Vicks

-INPO 4

%