BSEP-86-0664, Monthly Operating Repts for Apr 1986
| ML20197C867 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/30/1986 |
| From: | Dietz C, Harrison F CAROLINA POWER & LIGHT CO. |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| BSEP-86-0664, BSEP-86-664, NUDOCS 8605140002 | |
| Download: ML20197C867 (13) | |
Text
.
o o
1 DOCKET NO.:
050-0325 i
UNIT: Brunswick 1 I
DATE: April 1986 COMPLETED BY: Frances Harrison J
OPERATIONS
SUMMARY
BRUNSWICK UNIT 1 3
Brunswick Unit 1 operated at 77.12 percent-availability factor for the month of April with a 68.71 percent capacity factor. There were two power reductions and two scrams; the unit was returned to service on April 2, 1986, after the March 26, 1986, scram. Details are in the Unit 'hutdowns and Power Reductions sheet.
l l
There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel J
pool.
f t
t t
t e
j 4
I i
R f
LC9H 1
'I t
~,
CP&L CO '
PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 05/05/86 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 RUN TIME 14:29:51 DRUNSWICK UNIT i DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 APRIL 1986 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1
-15 17 785 2
80 18 785 3
-8 19 636 4
-10 20 636 5
-12 21 643 6
-13 22 676 7
-12 23 764 8
112 24 766 9
623 25 766 10 675 26 719 11 742 27 781 12 743 28 783 13 771 29 780 14 771 30 77-7 15 766 16 777 i.16 - 8 l
I C P!,t CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 05/05/06 OPERATING DATA REPORT RPD36 RUN TIME 14:29:52 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STf.TUS TELEPHONE (919)457-9521
- i. UN1T NAt1E: BRUNSWICK UNIT i i NOTES I
2.
REPORTING PERIOD: APRIL 86 l
l 3.
LICENSED THERMAL POWER (MWT) 2436 I
4.
NAMLPLATE RATING (GROSS MWE) 867.0 l
l 5.
DESIGN ELECTRICAL RATING (NET MWF). 021.0 l
I 6.
MAX DEPENDABLE CAPACITY (GROSS MWE) 015.0 I l
7.
MAX DEPENDABLE CAPACITY (NET MWE)' 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (IlEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASON 5:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (f4ET MWE)
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 719.00 2879.00 79944.00
~ 12. NUMDE;R OF HOURS REACTOR CRITICAL 658.42 2692.62 49524.10
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10 1 -1.
HOURS GEtiERATOR ON LINE 554.40 2578.80 46716.18
- 15. UNIT RESERVE 3HUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1230649.66 6035642.09 96142276.54
- 17. GROSS ELEC. ENERGY GEN. (MWH) 404505.00 198G204.00 31 ~7394 77. 00
- 10. NET ELEC. ENERGY GENERATED (MWH) 390272.00--
1929545.00 30488242.00
- 19. UNIT SERVICE FACTOR 77.12 09.57 58.44
- 20. UNIT AVAILAD1LITY FACTOR 77.i2 89.57 58.44
- 22. UNIT CAP. FACTOR (USING DER NET) 66.i1 81 43 46.45
- 23. UNI-T FORLED OUTAGE RATE 22.33
.tO.43 19.52
- 24. SHUTDOWNG SCHED. OVER NEXT 6 MONTHS ( T Y P,E, DATE,. AND DURATION OF EACH)
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESIIMATED DATE OF START UP
- 26. UNIls IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORCAST ACHEIVED' INIT'IAL CRllICALITY
- ~
INITIAL ELECTRIClTY COMMERCIAL OPERATION J
i.16 - ?
DOCKET NO.
Oso-032s UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME nrunnwick 7 DATE May 1986
(.'OMPLETED BY Prancen narriann REPORT MONTil Ar>ril 1986 TELEPHONE 919-4 s?-o s 91 E
c
[
j 5' E Licensee h
{"3 Cause & Corrective q'
Daic i
3i 2sE Event g?
Action to gg' Prevent Recurrence jE
- is yu g g Report e to U 4
6 86-016 860326 F
161.43 A
3' l-86-009 Reactor scram-main turbine and reactor feed pump trip on high reactor water.
level instrument malfunction.
i 1
/
I 2
3 4
F: Forced Reas..n -
Method:
Exhibit G -Instructions S Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test
- 2. Manual Scram.
Entry Sheets for Licensee C. Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction 01611
's-Continuations E Operator Training & License Examination F.Admink;rative 5-Load Reductions 5
G Operational Ersur (Explain) 6-Other Eshibit 1 Same Source (9/77) 11 Other (Explain) t j
UNIT SHUTDOWNS AND P6WER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME firunswick r DATE Ma y 1 m A COMPLETED BY Frances iia rrison REPORT MONTil Ar>r i l 1996 TELEPHONE 919-457-9571 E
E
!2
'h j N' 3 Licerisce
,E t, g%
Cause & Correceive Dite
- y, 3?
4 2sE Event gy
- 6. T A i"" ' "
j E
jgg Report e vi U EU H
Prevent Recu:rence g
6 86-024 8'60402 F
'2.22 A
3 Main Turbine Trip l
i 2
3 4'
F: Forced Reas.n-Method:
Exhibit G - Inst ructitms
,S Scheduled A Equipmeni Failure (Explain)
I-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets fur Licensee C Refueling 3 Automatic Scram-Event Repor (LER) FileINUREG-D-Regulatory Restriction 0161)
E. Operator Training & License Examination 4-Continuations j
5-Load ' Reduc t Ion s 3
-l F-Administrative G-Operational Error (Explain) 6-Other Exhibii 1 Same Source 19/77) 11 Other (E splain)
l I
i 1
I UNIT SHUTDOWNS AND PDWER REDUCTIONS DOCKET NO. 050-032s UNIT NAME Brunswfek
.T DATE May lonn COMPLETED BY pr= - - n=rr4 con REPORT MONTil April 1996 TELEPitONE 010 a59-95gi
! ~:
'h lacerisce
[-t, Cause & Corrective N"-
DJic i
3j
?,
25E Event g7 o-T Action to
[U 6
$E 5
j5g Report e in U Prevent Recurrence d
86-025 860402 F
136.7 A
3 Reactor Scram - Low Reactor Water Level due to loss of Bus ID l
l I-3 4
F: Forced Rea s..n -
Method:
Exhibit G Instructions S Scheduled A Equipment Failure (Explain).
2 Manual Scram.
Entry Sheets for Licensee 1-Manual for Preparation of Data l
B. Maintenance of Test C Refueling 3 Automatic Scram.
Event Report (LER) FileiNUREG.
D. Regulatory Resitiction 0161) l-Continuations i
E-Operr : Training & License Examination F Admimstrative 5-Load Reductions 5
G-Operational Esior (Explain) 6-Other Exhibii 1 Same Source 19/77)
If Ottier (Explaini
t 4
DOCKET NO. 050-0325 UNIT SilUTDOWNS AND P WER REDUCTIONS UNIT NAME nrunswick i DATE Mau 1996 COMPLETED BY Frances HarriMon 3
REPOR T MONTil Anvii ion 6 TELEPHONE 919-4s7-9s91
~E ii I
Licensee gg gn.
Cause & Correceive js'3
[,
i Aceron to Daic g
3j
{
.; j $
Event g?
gU f:
5 ju ;f, g Report e mO Prevent Recurrence g
6
)36-020 860419 F
.00 A
5 Heater drain pump problems 7
9 4
g,,.
1 i
9 e
l I
3 4
F: Forced Rea:m-Method:
Exhibit G. Instructions S Scheduled A. Equipment Failure (ExP ain) l-Manual for Preparation of Data l
B-Maintenance of Test 2-Manual Scram.
Entry Sheets fur Licensee 3 Automatic Scram.
Event Report (LER) File INUREG-
]
C. Refueling 01611 D-Regulatory Resitiction
's-Con t i nua t i ons E. Operator Training & License Examination l
F Adr vaistrative 5-Load Reductions 5
G;Operatioaal Error (Explain) 6-Other Exhibit I - Same Source
?
(9/77) 11 Other (E splain)
.= -.
t DOCKET NO. ' 050-032s UNIT SHUTDOWNS AND P WER REDUCTIONS UNIT NAME Brunswiek T DATE Ma t-loan COMPLETED BY Frances l'a r r i a nn REPORT MONTH anvil ion 6 TELEPHONE 919-4s7-os91
~E
'E j $E Licensee E r, Cause & Correceive
[e
^
Daic i
3g i
255 Event gy
$E 5
j ;f, g Report e mO EO Prevent Recurrence H
g 6
86-022 860426 S
.00 B
5 Rod improvement 1
f l
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram-Entry Sheets for Licensec
-.I 3 Automatic Scram.
Event Repois (LER) File INUREG-C. Refueling 0161)
D-Regulatory Restriction Is-Continuations E Operator Training & License Examination
. F Administrative 5-Load' Reductions s
i G-Operational Error (Explain)
(,-O t h e r Eshibit I Same Source
- 19/77)
H-Ot he r ( Explain)
d l-CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2
Rus4 DATE 05/05/86 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39
-RUN TIME 14:29:51 ICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES liARRISON TELEPHONE (919)457-9521 APRIL 1986 s
i DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL J
(MWE-NET)
(MWE-NEF) i
~6 17
-8 i
2
-4 18
-8 1
3
-6 19
-8 4
-7 20
-8 5
~6 21
-9 6
-6 22
-10 7
-7 23
-10 j
8
-8 24
-10 9
-7 25
-10 f
10
-9 26
-11 l
11
-7 27
-10 12
-8 2G
-11 13
-7 29
-10 14
-7 30
-10 15
,8 16
-- 8 i
i J
4 i
1.16 - 8
CP&L CO PLRNI PCRFORMANCE DATA CYSTEM PAGE 2
RUN DATE 05/05/06 OPERATING DATA REfORT RPD36 RUN TIME 14:29:52 ICK UNIT 2 DOCKET NU. 050-0324 C0i1PLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (919)457-9521 1.
UNIT NAME:
ICK UNIT 2 1 NOTES 1
2.
REPORTING PERIOD: APRIL 96 l
l 3.
LICENSED THERMAL POWER (MWT) 24ae i
j 4.
NAMEPLATE RATING (GROSS MWE) 867.0 1
I 5.
DESIGN ELECTRICAL RATING (NET MWE). 821.0 I
I 6.
MAX DEPENDABLE CAPACITY (GROSS MWE) 015.0 l 1
7.
MAX DEPENDABLE CAPACITY (NET MWE) 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TriRU 7) SINCE LAST REPOR1, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTION IF ANY:
i THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 719.00 2879.00 91968.00
- 12. NUMBER OF HOURS REAC10R CRITICAL
.00
.00 54512.36
- 13. REACTOR RESERVE SPUIDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR CN LINE
.00
.00 51011.09
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00 16..
GROSG. THERMAL ENERGY GEN. (MWH)
.00
.00 98829872.53
- 17. GROSS ELEC. EbERGY GEN. (MWH)
.00
.00 32795404.00
- 18. NET ELEC. ENERGY GENERATED (MUH)
-5826.00
-15495.00 31422504.00
- 19. UNIT SERVICE FACTOR
.00
.00 55.47
- 20. UNIT AVAILABILITY FACTOR
.00
.00 55.47 21.. UNIT CAP. FACTOR (USING MDC NET)
-1.03
.68 43.25
- 22. UNIT CAP. FACTOR (USING DER NE1)
. 9 9.
.66 41.62-23.' UNIT FORCED OUTAGE RATE
.00
.00 15.48
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS ( T Y.P E, DATE, AND DURATION.0F EACH) 1 j
- 25. IF SHUTDOWN AT FND OF REPORT PERIOD, ESTIMATED DATE OF START UP 06/13/06
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORCAST aCHEIVED INITIAL CRITICALITY
+
INITIAL ELECTRICITY
-~~~~ ~
COMMERCIAL OPERATIGN
- 1. i 6 -9
I DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: May 1986 COMPLETED BY: Frances Harrison OI'ERATIONS
SUMMARY
BRUNSWICK UNIT 2 The unit was removed from service on November 30, 1985, for the refueling /
maintenance outage.
There are 756 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.
4 e
k 4
e 9
y
.9
.i iv
~
O~
O O
050-0324 DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS Brunswick II UNIT NAME DATE May 1986 REPORT M'ON11g April 1986 COMPLETED BY Frances Harrison TELEPif0NE 919-457-952i e.
5 Ti jg "h
j E ~4 1.icensee E t, Cause & Correceive No, Date '
g 5g i
js5 Event gy EO Prevent Recurrence f-E jgg Report a mU H
g c5 85-078 851130 S
In C
4 NA RC FUELXX Refueling / Maintenance Outage Progress 1
2 3
4 F: Forced Reason:
Method:
Exhibit G -Instructions S: Sckduled A. Equipment Failure (Explain)
I. Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheels for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NURI.G.
0161)
D Regulatory Restriction 4-Continuations E4)perator Training & License Examination F-Administrative 5-Load Reductions 5
G. Operational Error (Explain)
(,-Other Exhibit 1 Same Source 49/77)
Il-Other (Explain)
~,
s Cp&L
~
Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 May 2, 1986 FILE: B09-13510C SERIAL: BSEP/86-0664 Mr. J. M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PIANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT i
Dear Mr. Taylor:
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric-Plant, Units 1 and 2, Carolina Power & Light Company herewith submits
.the report of operating statistics and shutdown experience for the month of April 1986.
Very truly yours, i
C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/ cab MSC/85-0014 Enclosures cc:
Mr. M.'R. Beebe Dr. Ji N. Grace Mr. M. D. Hill Mr. P. W. Howe Mr. C. F. Lassiter Mr. R. G. Oehl Ms. D.~J. Vicks INPO j
-