r
'CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 12/02/05 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 RLTN T I M E 15:16;10 BRUNSWICK UNIT i DOCKET NO. O'i o - 0 3 2:>
COMPLETED ltY FRANCEG HARillGON T E L Ef-HONE (919)457-9521 NOVEMBER 19G5 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWEll LEVEL (MWE-NET)
(MWE-NEl) i
-15 17 225 2
.5 10 425 3
-13 19 570 4
-13 20 664 E
-15 21 607 6
-12 22 6Si 7
-13 23 584 0
41 24 651 9
172 2S 754 10 228 26 751 11 368 27 744 12 445 2D 646 13 31 27 766 14
-10 30 737 15
-12 16
-14 1.16 - 8 8512120501 851130 PDR ADOCK 05000324
[g (
j PDR
- CP&LJC0 PLANT PERFORMANCE-DATA SYSTEM PAGE
-i
.RUN DATE-12/03/85 OPERATING DATA AEPORT RPD36 RUN TIME 12:13:27 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUE TELEPHONE (919)457-952i
- 1. UNIT NAME: BRUNSWICK UNIT 1 i NOTES i
- 2. REPORTING PERIOD: NOVEMBER 85 l
- 3. LICENSED THERMAL POWER (MWT) 2436 i
i
- 4. NAMEPLATE RATING (GRGSS MUE): 867.0 1
1 l
5.- DESIGN ELECTRICAL RATING (NET MWE) 821.0 i
i 6.
MAX DEPENDADLE CAPACITY (GROSS'MWE) 815.0 1 I
- 7. MAX DEPENDABLE CAPACITY (NET MWE)- 790.0
'B.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)'
]
- 10. REASONS FOR RESTRICTION IF ANY-t THIS YR'TO CUMUL MONTH DATE ATlVE
- 11. HOURS IN REPORTING PERIOD 720.00 8016.00 76321.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 552.70 2665.62 46087.48
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE 440.10 2504.55 43393.38
'15.
UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MUH) 797431.42 4319028.00 08368224.92
- 17. GROSS ELEC. ENERGY GEN. (MWH) 252874.0G 1433300.00 29175397.00 1
l 1 8.. NET ELEC. ENERGY GENERATED (MWH) 240919.00 1353079.00 27998062.00
- 19. UNIT SERVICE FACTOR 61.13 31.24 56.86 l
- 20. UNIT AVAILABILITY FACTOR 61.13 31.24 56.86
42.36 21.37 46.44
- 22. UNIT CAP. FACTOR (USING DER NET)
'40.76 20.56 44.68 l
123. UNIT FORCED OUTAGE RATE 18.34 5.50 20.26
- 24. SHUTDOWNS SCHED. DVER NEXT.6 MONTHS (TYPE,>DATE,.AND DURAT. ION OF EACH) 4 I
i 25.-IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE-OF START UP~
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION); FORCAST ACHEIVED INITIAL. CRITICALITY
'INITIALLELECTRICITY 1
i COMMERCIAL OPERATION.
1 1-.16,
7
~ 1,e,
r e.G n,,,---
r
,+-L, c
,--, +,,
Y DOCKET NO.: 050-0325
-UNIT: Brunswick 1 DATE: December 1985 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 1 Unit 1 synchronized to the grid on November 8, 1985, after the refueling /
maintenance outage. Brunswick Unit 1 operated at a 61.13 percent availability factor for the month of November with a 42.36 percent capacity factor. There was one off-line outage and three power reductions. Details are in the Unit Shutdowns and Power Reductions sheet.
There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit i fuel pool.
f
.I 1
atit
.m m
050-0325 DOCKETNO.
UNIT SHUTDOWNS AND POWER REDUCDONS UNIT NAME Brunswick I DATE December Iq8s COMPLETED BY Frances Harrison REPORT MONUf November 1985 TELEPHONE 9I9-457-457I
.E c
jg
'h j E5 Licensee P,
g%
Cause & Correceive No.
Date g
3g
(
2g5 Ev'ent 3,3
^ ' " " ' "
H jgg Repori #
mV EU Prevent Recurrence g
j d
85-007 851108 s
00 B
5 overspeed Trip Test and control Rod Scram Testing.
a n
1 I
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 1
B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event ReporI(LER) File (NUREG.
D-Regulatory Restriction 0161)
E-Operator Training & Ucense Examination 4-Continuations F-Administrative 5-Load Reductions 5
G-Operational Error (Explain) 6-Other Eshibit 1 - Same Source (9/77) 114) her (Emplain)
(=
^
a n
+A
050-0325 UNIT SHUIDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Brunswicic I DATE December 1985 REPORT MONTH November 1985 COMPLETED 3Y Frances Harrison TELEPHONE 919-457-452i e,
E E
jg 3
y E3 Licensee h
Cause & Correctsve No.
Date g
Eg i
,;555 Ev'ent g?
^ ' ' " ' "
H j$
j iy3 g Repost*r mU EU Prevent Recurrence g
5 85-008 851113 F
98.87 A
2 Control Rod Drive Replacement Outage.
Replacement of the Drive Mechanism for Control Rod 38-35 and the PIP Tubing and Shoot-out Steel Have Been Replaced.
i l
i 2
3 4
F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A.Equiprnent Failure (Explain) 1-Manual for Preparation of Data B. Maintenance o( Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Repor (LER) File (NURI.G.
D-Regulatory Restriction 0161)
EOperator Training & Ucense Exanunation 4-Continuations F-Administrative 5-Load Reductions 5
Goperational Error (Explain) 6-Other Exhibit 1 - Same Source 19/77) llother (Explain)
- u. -
4 n
050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Brunswick I DATE Decernhe r 198s REPORT MONT13 November 1985 COMPLETED BY Frances Harrison TELEPHONE 919-457-o57l "i-5*l, Cause & Corrective e
ri 3 = ='
54 Licensee c*
I _e 8
7 g
Ni..
Date g
3g jg5 Ev'ent uT a3 Action to
$3 E
j di j Report #
E0 fU Prevent Recurrence d
85-010 851128-S 00 B
5 Rod Itnprovement.
L h
1 2
3 4
F: Foro.d Reason:
Method:
Exhibit G-Instructiims S: Sc'.eduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Repor (LERI File (NUREG.
D-Regulatory Restriction 0161)
E-Operator Training & IJcense Examination 4-Continuations F Administrative 5-Load Reductions s
G4)perational Error (Explain) 6-Other Exhibit I - Same Source (9/77)
IM):her (Explain)
'^*
^
A
050-0325 UNIT SHUTDOWNS AND POWER REIMJCHONS DOCKET NO.
UNIT NAME Brunswick I DATE December 1085 Frances l{arrison REPORT MOND1 November 1985 COMPLETED BY TELEPHONE 919-457-952I "i
c _.
re 5 u, 5*
EX Licensee g *,,
Cause & Correceive 2e E
7 No.
Dale h
gg g
jg5 Ev'ent uT Action to
$3 5
j$[
Rep"'I
- E0 f'
Preven Recurrence 6
85-011 851130 S
00 B
5 Rotatine CIV and Bypass Valve Testing i
1 2
3 4
F: Forced Reason:
Method:
Exhibii G Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manu-8 for Preparanion of Data B Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)
E-Operator Training A license Examination 4-Continuations F Administrative 5-Load Reduetions 5
G-Operational Error (Explain) 6-Other Exhibit I - Same Source 19/77) llother (Explain).
6e"
D00KET NO.: 050-0324 UNIT: Brunswick 2 DATE: December 1985 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 2 Brunswick Unit 2 operated at a 91.03 percent availability factor for the month of November 1985 with a 77.29 percent capacity factor. There was one off-line outage. Details are in Unit Shutdowns and Power Reductions sheet. The unit was removed from service on November 30, 1985, for the refueling / maintenance outage.
There are 608 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.
1 n,
r y
n 4
, e r
e--
r e
- CP&L CO.
PLANT PERFORMANCE' DATA SYSTEh PAGE 2
-RUN.DATE' 12/02/85 APPENDIX B - AVERAGE DAILY-POWER LC'!EL RPD39
- RON TIME 15:16:10 BRUNSWICK UNIT 2 DOCKET NO. 050-0324
^
COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 NOVEMBER 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) i 697 17 693 2
696 18 690 i
. 3 694 19 679-4 4
694-20 681 5
694 21 511 I.
6
'697 22
'325 4!
~
7 697 23
-13 8
700 24 197 9
705 25' 671 10 653 26 705
'11 687 27 719 12 686 28 720
-13 689.
29 697 14 687 30 3-15 689 v
16 676 4
s l
3 L
i
.'t,-i6 - 8 t
A'
JCP&L'C0 PLANicPERFORMANCE' DATA SYSTEM PAGE e.
RUN-DATE.~12/03/85 OPERATING DATA REPORT RPD36
.RONETIMEJ 12:13:27 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON
.0PERATING STATUS TELEPHONE (919)457-9521
- li UNIT NAME: BRUNSWICK UNIT 2 i NOTES 1
- 2. REPORTING PERIOD: NOVry%tR 85-1 I
- 3. LICENSED: THERMAL POWER (MWT) 2436 I
l
- 4. NAMEPLATE RATING-(GROSS MWE)' 867.0 l
1
- 5. DESIGN ELECTRICAL RATING-(NET MWE): 821.0 I
i
- 6. MAX. DEPENDABLE CAPACITY (GROSS MWE)- 815.0 i i
7.' MAX DEPENDABLE CAPACITY (NET MWE) 790.0 8.
IF-CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT.,
GIVE REASONS.
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTION IF ANY--
THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 720.00 8016.00 88345.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 663.72 7134.84 54512.36
- 13. REACTOR ~ RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 655.41 6986.02 51011.09 i
'5.
UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN.-(MWH) 1374167.09 15717888.56 98828755.87
- 17. GROSS ELEC. ENERGY GEN. (MWH) 454403.00 5193780.00 32795484.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 439620.00 5022018.00 31442492.00
- 19. UNIT SERVICE FACTOR 91.03 87.15 57.74
- 20. UNIT AVAILABILITY FACTOR 91.03 87.15 57.74 21 ~. UNIT ~ CAP. FACTOR (USING MDC NET) 77.29' 79.30 45.05 J22. UNIT' CAP. FACTOR (USING DER NET) 74.37 76.31 43.35
- 23. UNIT' FORCED OUTAGE RATE 6.06 9.37 15.48 24 SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF.EACH)
- 25. IF SHUTDOWN AT END_OF-REPORT PERIOD, ESTIMATED'DATE.0F START UP
~
-26.: UNITS-IN' TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAGT ACHEIVED INITIAL CRITICALITY INITIALLELECTRI' CITY-COMMERCIAL! OPERATION 1i16 - 9
UNIT SHUTDOWNS AND POWER REEMJC110NS DOCKET NO.
050-0324 UNIT NAME Brunswicic II DATE December 1985 Frances Harrison REPORT MONTH Ncvember 1985 COMPLETED BY lELEPHONE 9I9-457-9571 e.
E E
.$ 3
'h j Y5 Licensee
,E,
- g.
Cause & Corrective No.
Ilate k
I.' ij i
2s5 Ev'ent g'g
^' " ' "
$E E
j ;?, g Repori #
mV EU H
Prevent Recurrence g
d 85-074 851020 F
00 A
5 Unit Operating at Reduced Power Due to Main Steam Line Solenoid Problems.
The Open Circtiited DC Solenoid for MSIV 2-B21-F028C Was Replaced.
I 2
3 4
F: Forced Peason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Prepar.ation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Repor: (LER) File (NUREG-D Regulatory Restriction 0161)
E-Operator Training & Ucense Examination 4-Continuations J
F-Administrative 5-Load Reduetions 5
G4)perational Error (Explain) 6-Other Exhibit I Same Source (9/77)
H4)ther (Explain) l oy" a
o
050-0324 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUC 110NS Brunswick rr UNIT NAME December 1985 DATE COMPLETED BY Frances Harrison REPORT MONTH November 1985 TELEPHONE 919-457-952i e.
E E
E 3 3
j $5 Licensee E*
Cause & Corrective No.
Date g
Eg i
2s&
Ev'nt p
' U "" '"
e
$Z 5
~~ if, g Report a mO EU Prevent Recurrence W
g 6
85-075 851122 F
42.27 A
3 2-85-012 Rx Scram-Power-to-Flow Scram.
A Decrease in 2A Reactor Recire System Coolant Flow.
i l
l 2
3 4
F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Repori t LERI File (NUREG-D Regulatory Restriction 0161) 4-Continuations E-Operator Training & Ucense Examination F Administrative 5-toad Reductions 5
4 G-Operational Error (Explain) 6-Other Exhibit I-Same Source (9/77)
Il Other (Explain)
.og"
.....~ - -.
n
UNIT SHUTDOWNS AND POWf.R REDUCTIONS DOCKET NO.-
050-0324 UNIT NAME Brunswick iI DATE December 1985 REPORT MONTH November 1985 COMPLETED BY Frances if arrison TELEPHONE 914-457-9521 a
n.N
- g e_
r.
.3 u, e E"
N C'"'# # C" i
55 5
3 5b L8(
No-I)aie a
o
.c 3 oc Event aT "o
Action to
$"3 5
j5y Report #
iE0 V
Prevent Recurrence 6
85-078 851130 S
In C
4 NA RC FUELXX Re fueling / Maintenance Outage.
Progres I
1 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C. Refueling 3 Automatic Scram.
Event R: pori (LERI file (NUREG-D-Regulatory Restriction 0161) i-Continuations t
E. Operator Training & Ucense Examination F. Administrative 5-Load Reductions 5
G-Operational Error (Explain) 6-Other Exhibit I - Same Source t'l/77)
HOther(Explain)
^
b
o
~
~#
GP&L l
(
Carolina Power & Light Company l-Brunswick Steam Electric Plant P. O.-Box 10429 Southport, NC 28461-0429 December 3, 1985 FILE: B09-13510C
- SERIAL: BSEP/85-2044 Mr. J. M. Taylor, Director
-Office of Inspection and Enforcement j
U.S. Nuclear Regulatory Commission Washington, DC 20555
' BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62
' MONTHLY OPERATING REPORT
Dear Mr.. Taylor:
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of November 1985.
Very truly yours, N
hV C. R.
ietz, Ge eral Manager Brunswick Steam Electric Plant FH/bc MSC/85-0014 Enclosures cc: - Mr. M. R. Beebe Dr. J. N. Grace Mr. M. D. Hill