r

'CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i

RUN DATE 12/02/05 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 RLTN T I M E 15:16;10 BRUNSWICK UNIT i DOCKET NO. O'i o - 0 3 2:>

COMPLETED ltY FRANCEG HARillGON T E L Ef-HONE (919)457-9521 NOVEMBER 19G5 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWEll LEVEL (MWE-NET)

(MWE-NEl) i

-15 17 225 2

.5 10 425 3

-13 19 570 4

-13 20 664 E

-15 21 607 6

-12 22 6Si 7

-13 23 584 0

41 24 651 9

172 2S 754 10 228 26 751 11 368 27 744 12 445 2D 646 13 31 27 766 14

-10 30 737 15

-12 16

-14 1.16 - 8 8512120501 851130 PDR ADOCK 05000324

[g (

j PDR

  • CP&LJC0 PLANT PERFORMANCE-DATA SYSTEM PAGE

-i

.RUN DATE-12/03/85 OPERATING DATA AEPORT RPD36 RUN TIME 12:13:27 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUE TELEPHONE (919)457-952i

1. UNIT NAME: BRUNSWICK UNIT 1 i NOTES i
2. REPORTING PERIOD: NOVEMBER 85 l
3. LICENSED THERMAL POWER (MWT) 2436 i

i

4. NAMEPLATE RATING (GRGSS MUE): 867.0 1

1 l

5.- DESIGN ELECTRICAL RATING (NET MWE) 821.0 i

i 6.

MAX DEPENDADLE CAPACITY (GROSS'MWE) 815.0 1 I

7. MAX DEPENDABLE CAPACITY (NET MWE)- 790.0

'B.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)'

]

10. REASONS FOR RESTRICTION IF ANY-t THIS YR'TO CUMUL MONTH DATE ATlVE
11. HOURS IN REPORTING PERIOD 720.00 8016.00 76321.00
12. NUMBER OF HOURS REACTOR CRITICAL 552.70 2665.62 46087.48
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10

- 14. HOURS GENERATOR ON LINE 440.10 2504.55 43393.38

'15.

UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MUH) 797431.42 4319028.00 08368224.92
17. GROSS ELEC. ENERGY GEN. (MWH) 252874.0G 1433300.00 29175397.00 1

l 1 8.. NET ELEC. ENERGY GENERATED (MWH) 240919.00 1353079.00 27998062.00

19. UNIT SERVICE FACTOR 61.13 31.24 56.86 l
20. UNIT AVAILABILITY FACTOR 61.13 31.24 56.86
21. UNIT CAP. FACTOR (USING MDC NET).

42.36 21.37 46.44

22. UNIT CAP. FACTOR (USING DER NET)

'40.76 20.56 44.68 l

123. UNIT FORCED OUTAGE RATE 18.34 5.50 20.26

24. SHUTDOWNS SCHED. DVER NEXT.6 MONTHS (TYPE,>DATE,.AND DURAT. ION OF EACH) 4 I

i 25.-IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE-OF START UP~

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION); FORCAST ACHEIVED INITIAL. CRITICALITY

'INITIALLELECTRICITY 1

i COMMERCIAL OPERATION.

1 1-.16,

7

~ 1,e,

r e.G n,,,---

r

,+-L, c

,--, +,,

Y DOCKET NO.: 050-0325

-UNIT: Brunswick 1 DATE: December 1985 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 1 Unit 1 synchronized to the grid on November 8, 1985, after the refueling /

maintenance outage. Brunswick Unit 1 operated at a 61.13 percent availability factor for the month of November with a 42.36 percent capacity factor. There was one off-line outage and three power reductions. Details are in the Unit Shutdowns and Power Reductions sheet.

There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit i fuel pool.

f

.I 1

atit

.m m

050-0325 DOCKETNO.

UNIT SHUTDOWNS AND POWER REDUCDONS UNIT NAME Brunswick I DATE December Iq8s COMPLETED BY Frances Harrison REPORT MONUf November 1985 TELEPHONE 9I9-457-457I

.E c

jg

'h j E5 Licensee P,

g%

Cause & Correceive No.

Date g

3g

(

2g5 Ev'ent 3,3

^ ' " " ' "

H jgg Repori #

mV EU Prevent Recurrence g

j d

85-007 851108 s

00 B

5 overspeed Trip Test and control Rod Scram Testing.

a n

1 I

2 3

4 F: Forced Reason:

Method:

Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 1

B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event ReporI(LER) File (NUREG.

D-Regulatory Restriction 0161)

E-Operator Training & Ucense Examination 4-Continuations F-Administrative 5-Load Reductions 5

G-Operational Error (Explain) 6-Other Eshibit 1 - Same Source (9/77) 114) her (Emplain)

(=

^

a n

+A

050-0325 UNIT SHUIDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Brunswicic I DATE December 1985 REPORT MONTH November 1985 COMPLETED 3Y Frances Harrison TELEPHONE 919-457-452i e,

E E

jg 3

y E3 Licensee h

Cause & Correctsve No.

Date g

Eg i

,;555 Ev'ent g?

^ ' ' " ' "

H j$

j iy3 g Repost*r mU EU Prevent Recurrence g

5 85-008 851113 F

98.87 A

2 Control Rod Drive Replacement Outage.

Replacement of the Drive Mechanism for Control Rod 38-35 and the PIP Tubing and Shoot-out Steel Have Been Replaced.

i l

i 2

3 4

F: Forced Reason:

Method:

Exhibit G. instructions S: Scheduled A.Equiprnent Failure (Explain) 1-Manual for Preparation of Data B. Maintenance o( Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Repor (LER) File (NURI.G.

D-Regulatory Restriction 0161)

EOperator Training & Ucense Exanunation 4-Continuations F-Administrative 5-Load Reductions 5

Goperational Error (Explain) 6-Other Exhibit 1 - Same Source 19/77) llother (Explain)

u. -

4 n

050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Brunswick I DATE Decernhe r 198s REPORT MONT13 November 1985 COMPLETED BY Frances Harrison TELEPHONE 919-457-o57l "i-5*l, Cause & Corrective e

ri 3 = ='

54 Licensee c*

I _e 8

7 g

Ni..

Date g

3g jg5 Ev'ent uT a3 Action to

$3 E

j di j Report #

E0 fU Prevent Recurrence d

85-010 851128-S 00 B

5 Rod Itnprovement.

L h

1 2

3 4

F: Foro.d Reason:

Method:

Exhibit G-Instructiims S: Sc'.eduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Repor (LERI File (NUREG.

D-Regulatory Restriction 0161)

E-Operator Training & IJcense Examination 4-Continuations F Administrative 5-Load Reductions s

G4)perational Error (Explain) 6-Other Exhibit I - Same Source (9/77)

IM):her (Explain)

'^*

^

A

050-0325 UNIT SHUTDOWNS AND POWER REIMJCHONS DOCKET NO.

UNIT NAME Brunswick I DATE December 1085 Frances l{arrison REPORT MOND1 November 1985 COMPLETED BY TELEPHONE 919-457-952I "i

c _.

re 5 u, 5*

EX Licensee g *,,

Cause & Correceive 2e E

7 No.

Dale h

gg g

jg5 Ev'ent uT Action to

$3 5

j$[

Rep"'I

  • E0 f'

Preven Recurrence 6

85-011 851130 S

00 B

5 Rotatine CIV and Bypass Valve Testing i

1 2

3 4

F: Forced Reason:

Method:

Exhibii G Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manu-8 for Preparanion of Data B Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)

E-Operator Training A license Examination 4-Continuations F Administrative 5-Load Reduetions 5

G-Operational Error (Explain) 6-Other Exhibit I - Same Source 19/77) llother (Explain).

6e"

D00KET NO.: 050-0324 UNIT: Brunswick 2 DATE: December 1985 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 2 Brunswick Unit 2 operated at a 91.03 percent availability factor for the month of November 1985 with a 77.29 percent capacity factor. There was one off-line outage. Details are in Unit Shutdowns and Power Reductions sheet. The unit was removed from service on November 30, 1985, for the refueling / maintenance outage.

There are 608 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.

1 n,

r y

n 4

, e r

e--

r e

PLANT PERFORMANCE' DATA SYSTEh PAGE 2

-RUN.DATE' 12/02/85 APPENDIX B - AVERAGE DAILY-POWER LC'!EL RPD39

- RON TIME 15:16:10 BRUNSWICK UNIT 2 DOCKET NO. 050-0324

^

COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 NOVEMBER 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) i 697 17 693 2

696 18 690 i

. 3 694 19 679-4 4

694-20 681 5

694 21 511 I.

6

'697 22

'325 4!

~

7 697 23

-13 8

700 24 197 9

705 25' 671 10 653 26 705

'11 687 27 719 12 686 28 720

-13 689.

29 697 14 687 30 3-15 689 v

16 676 4

s l

3 L

i

.'t,-i6 - 8 t

A'

JCP&L'C0 PLANicPERFORMANCE' DATA SYSTEM PAGE e.

RUN-DATE.~12/03/85 OPERATING DATA REPORT RPD36

.RONETIMEJ 12:13:27 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON

.0PERATING STATUS TELEPHONE (919)457-9521

li UNIT NAME: BRUNSWICK UNIT 2 i NOTES 1
2. REPORTING PERIOD: NOVry%tR 85-1 I
3. LICENSED: THERMAL POWER (MWT) 2436 I

l

4. NAMEPLATE RATING-(GROSS MWE)' 867.0 l

1

5. DESIGN ELECTRICAL RATING-(NET MWE): 821.0 I

i

6. MAX. DEPENDABLE CAPACITY (GROSS MWE)- 815.0 i i

7.' MAX DEPENDABLE CAPACITY (NET MWE) 790.0 8.

IF-CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT.,

GIVE REASONS.

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
10. REASONS FOR RESTRICTION IF ANY--

THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 720.00 8016.00 88345.00

12. NUMBER OF HOURS REACTOR CRITICAL 663.72 7134.84 54512.36
13. REACTOR ~ RESERVE SHUTDOWN HRS

.00

.00

.00

14. HOURS GENERATOR ON LINE 655.41 6986.02 51011.09 i

'5.

UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN.-(MWH) 1374167.09 15717888.56 98828755.87
17. GROSS ELEC. ENERGY GEN. (MWH) 454403.00 5193780.00 32795484.00
18. NET ELEC. ENERGY GENERATED (MWH) 439620.00 5022018.00 31442492.00
19. UNIT SERVICE FACTOR 91.03 87.15 57.74
20. UNIT AVAILABILITY FACTOR 91.03 87.15 57.74 21 ~. UNIT ~ CAP. FACTOR (USING MDC NET) 77.29' 79.30 45.05 J22. UNIT' CAP. FACTOR (USING DER NET) 74.37 76.31 43.35
23. UNIT' FORCED OUTAGE RATE 6.06 9.37 15.48 24 SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF.EACH)
25. IF SHUTDOWN AT END_OF-REPORT PERIOD, ESTIMATED'DATE.0F START UP

~

-26.: UNITS-IN' TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAGT ACHEIVED INITIAL CRITICALITY INITIALLELECTRI' CITY-COMMERCIAL! OPERATION 1i16 - 9

UNIT SHUTDOWNS AND POWER REEMJC110NS DOCKET NO.

050-0324 UNIT NAME Brunswicic II DATE December 1985 Frances Harrison REPORT MONTH Ncvember 1985 COMPLETED BY lELEPHONE 9I9-457-9571 e.

E E

.$ 3

'h j Y5 Licensee

,E,

  • g.

Cause & Corrective No.

Ilate k

I.' ij i

2s5 Ev'ent g'g

^' " ' "

$E E

j ;?, g Repori #

mV EU H

Prevent Recurrence g

d 85-074 851020 F

00 A

5 Unit Operating at Reduced Power Due to Main Steam Line Solenoid Problems.

The Open Circtiited DC Solenoid for MSIV 2-B21-F028C Was Replaced.

I 2

3 4

F: Forced Peason:

Method:

Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Prepar.ation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Repor: (LER) File (NUREG-D Regulatory Restriction 0161)

E-Operator Training & Ucense Examination 4-Continuations J

F-Administrative 5-Load Reduetions 5

G4)perational Error (Explain) 6-Other Exhibit I Same Source (9/77)

H4)ther (Explain) l oy" a

o

050-0324 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUC 110NS Brunswick rr UNIT NAME December 1985 DATE COMPLETED BY Frances Harrison REPORT MONTH November 1985 TELEPHONE 919-457-952i e.

E E

E 3 3

j $5 Licensee E*

Cause & Corrective No.

Date g

Eg i

2s&

Ev'nt p

' U "" '"

e

$Z 5

~~ if, g Report a mO EU Prevent Recurrence W

g 6

85-075 851122 F

42.27 A

3 2-85-012 Rx Scram-Power-to-Flow Scram.

A Decrease in 2A Reactor Recire System Coolant Flow.

i l

l 2

3 4

F: Forced Reason:

Method:

Exhibit G. instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Repori t LERI File (NUREG-D Regulatory Restriction 0161) 4-Continuations E-Operator Training & Ucense Examination F Administrative 5-toad Reductions 5

4 G-Operational Error (Explain) 6-Other Exhibit I-Same Source (9/77)

Il Other (Explain)

.og"

.....~ - -.

n

UNIT SHUTDOWNS AND POWf.R REDUCTIONS DOCKET NO.-

050-0324 UNIT NAME Brunswick iI DATE December 1985 REPORT MONTH November 1985 COMPLETED BY Frances if arrison TELEPHONE 914-457-9521 a

n.N

    • g e_

r.

.3 u, e E"

N C'"'# # C" i

55 5

3 5b L8(

No-I)aie a

o

.c 3 oc Event aT "o

Action to

$"3 5

j5y Report #

iE0 V

Prevent Recurrence 6

85-078 851130 S

In C

4 NA RC FUELXX Re fueling / Maintenance Outage.

Progres I

1 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling 3 Automatic Scram.

Event R: pori (LERI file (NUREG-D-Regulatory Restriction 0161) i-Continuations t

E. Operator Training & Ucense Examination F. Administrative 5-Load Reductions 5

G-Operational Error (Explain) 6-Other Exhibit I - Same Source t'l/77)

HOther(Explain)

^

b

o

~

~#

GP&L l

(

Carolina Power & Light Company l-Brunswick Steam Electric Plant P. O.-Box 10429 Southport, NC 28461-0429 December 3, 1985 FILE: B09-13510C

SERIAL: BSEP/85-2044 Mr. J. M. Taylor, Director

-Office of Inspection and Enforcement j

U.S. Nuclear Regulatory Commission Washington, DC 20555

' BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62

' MONTHLY OPERATING REPORT

Dear Mr.. Taylor:

In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of November 1985.

Very truly yours, N

hV C. R.

ietz, Ge eral Manager Brunswick Steam Electric Plant FH/bc MSC/85-0014 Enclosures cc: - Mr. M. R. Beebe Dr. J. N. Grace Mr. M. D. Hill

- Mr. C. F. Lassiter

- Ms.-D. J.LVicks

-INPO^