BSEP-83-3914, Monthly Operating Repts for Nov 1983

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1983
ML20082R852
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/30/1983
From: Dietz C, Harrison F
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BSEP-83-3914, NUDOCS 8312130321
Download: ML20082R852 (10)


Text

_ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _

APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT 1 DATE 12/05/83 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 NOVEMBER 1983 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1

-6 17

-17 2

-6 18 105 3

-7 19 484 4

-7 20 648 5

-6 21 723 6'

-7 22 648 7

-11 23 717 8

-11 24 765 9

-13 25 421 10

-13 26

-13 11

-14 27

-12 12

-14 28 222 13

-14 29 651 14

-14 30 672 15

-14 16

-16 1.16 - 8 8312130321 831130 PDR ADOCK 05000324 R

PDR

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 12/05/83 COMPLETED BY FRANCES HARRISON-TELEPHONE (919)457-9521 OPERATING STATUS 1.

UNIT NAME: BRUNSWICK UNIT 1 i NOTES I

2.

REPORTING PERIOD: NOVEMBER 83 I

I 3.

LICENSED THERMAL POWER (MWT): 2436 I

I 4.

NAMEPLATE RATING (GROSS MWE): 867.0 I

i 5.

DESIGN ELECTRICAL RATING (NET MWE): 821.0 l

I 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l I

'7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL' TO WHICH RESTRICTED IF ANY (NET MWE):

10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 8016.00 58777.00
12. NUMBER OF HOURS REACTOR CRITICAL 301.04 1834.45 35722.92
13. REACTOR RESERVE SHUTDOWN HRS

.00

.00 1647.10

14. HOURS GENERATOR ON LINE 246.55 1456.78 33426.81
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

'16.

GROSS THERMAL ENERGY GEN. (MWH) 448430.57 2996280.00 66892298.86

17. GROSS El.FC. ENERGY GEN, (MWH) 150099.00 971510.00 22033698.00
18. NET E!.EC. ENERGY GENERATED (MWH) 140225.00 890235.00 21115354.00
19. UNIT SERVICE FACTOR 34.24 18.17 56.87
20. UNIT AVAILABILITY FACTOR 34.24 18.17 56.87
21. UNIT CAP. FACTOR (USING MDC NET) 24.65 14.06 45.47
22. UNIT CAP. FACTOR (USING DER NET) 23.72 13.53 43.76
23. UNIT FORCED OUTAGE RATE 18.64 3.73 23.32
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF' SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

)

l 1

1.16 - 9

APPENDIX DOCKET NO.: 050-325 UNIT: Brunswick No. 1 DATE: November 1983 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 1 Brunswick Unit No. 1 operated at a 34.24% availability factor for the month of November with a 24.65% capacity factor. There was one off-line outage and one power reduction. Details are in Appendix D, The Unit Shutdowns and Power Reduction Log.

There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.

ei m um-

'm"

UNITSHUTDOWNS AND POWER REDUCHONS DOCKET NO. 050-0325 UNIT NAME Brunswicic I DATE December 1983 COMPLETED BY Frances Harrison REPORT MONDI hvombor 1983 TELEPHONE (9191457-9521 e.

'5 ea N 3

c en

.2 c E

25M Licensee gv Cause & Corrective No.

Date

{

3g

(

,3g5 Event u$

Action to H

$5 E

jsy Repori #

N0 f

Prevent Recurrence d

83022 831123 F

00 B

5 NA ZZ ZZZZZZ Reduced power 2% to commence TIP run due to core thermal limits.

i Rod pattern adjusted 1

4 I

s

\\

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D Regulatory Restriction E-Operator Training & Ucense Examination 4-Continuations -

0161)

F Administrative 5-Load Reductions 5

G-Operational Error (Explain) 6-0ther Exhibit I Same Source (4/77) 1101her (Explain)

_" ~ _.

  • _-.9".^~~

1.

e 0

g r7

---.-.,o_.

__&.A.

=o

-e m

r UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brtmswick I DATE December 1983 i

REPORT MONTH November 1983 COMPLETED BY Frances llarrison TELEPHONE (919)457-9521

'5 3

.2 _e E

2.s X Licensee E*

g*

c ee Cause & Corrective k.

No.

Date

{

gg jj jgy Event u 'N 3

Action lo

$3 5

jis g Repmt *

&G fu p,,,,,,g,,,,,,,,,

d 83026 831125 F

56,.5 A

1 NA XX VESSEL Unit separated from grid for drywell f.loor drain in-leakage i

1 i

I J

}

I 1

i i,

1 2

3 4

1 F: Forced Reason:

Method:

Exhibit G -Instructions i

S: Scheduled A. Equipment Failure (Explain)

I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Shecis for Licensee C Refueling 3 Automatic Scram.

Event Repor (LER) File (NUREG-D-Regulatory Restriction 0161)

E-Operator Training & Ucense Examinathm 4-Continuations i

F-Administrative 5-Load Reductions 5

G-Operational Error (Fiplain)

(,-0ther Exhibit 1 -Same Source i

j 08/77)

Il-Other (Explain)

APPENDIX B AVERAGE DAILY POWER LEVEL l

DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 12/05/83 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 i

NOVEMBER 1983 DAY AVG. DAILY POWER LEVEL day AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) l 1

709 17

-7 2

10 18

-8 l

3-19

-9 4

-12 20

-9 5

-11 21

-8 6

-11 22

-12 7

-9 23

-6 8

-7 24

-10 9

-9 25

-9 10

-9 26

-8 11

-9 27

-9 12

~7 28

-9 13

-7 29

-8 14

-8 30

-8 15

-8 16

-7 1.16 - D

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 12/06/83 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS 1.

UNIT NAME: BRUNSWICK UNIT 2 i NOTES I

2.

REPORTING PERIOD: NOVEMBER 83 I

i 3.

LICENSED THERMAL POWER (MWT): 2436 I

I 4.' NAMEPLATE RATING (GROSS MWE): 867.0 1

I 5.

DESIGN ELECTRICAL RATING (NET MWE): 821.0 I

i 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l l

7.

MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10. REASONS.FOR' RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 8016.00 70801.00
12. NUMBER OF HOURS REACTOR CRITICAL 34.58 5951.30 44727.42 13.- REACTOR RESERVE SHUTDOWN HRS

.00

.00

.00

14. HOURS GENERATOR ON LINE 26.85 5634.73 41785.47
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00

.00

16. GROSS THERMAL ENERGY GEN. (MWH) 55271.87 12279737.66 78576721.02
17. GROSS ELEC. ENERGY GEN. (MWH) 18058.00 4093006.00 26109698.00
18. NET ELEC. ENERGY GENERATED (MWH) 11413.00 3941972.00 25033898.00 19.' UNIT SERVICE FACTOR 3.73 70.29 59.02
20. UNIT AVAILABILITY FACTOR 3.73 70.29 59.02
21. UNIT CAP. FACTOR (USING MDC NET) 2.01 62.25 44.76
22. UNIT CAP. FACTOR (USING DER NET) 1.93 59.90 43.07
23. UNIT FORCED OUTAGE RATE

.00 10.18 15.97

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 12/15/83
26. UNITS IN TEST-STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

1.16 - 9

f APPENDIX DOCKET NO.:

050-324 UNIT: Brunswick No. 2 DATE: November 1983 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 2

- Brunswick Ur.it No. 2 operated at a 3.73% availability factor for the month of November with a 2.01% capacity factor. The unit was shut down on November 2, 1983, for a planned Interaranular Stress Corrosion Cracking outage.

There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick 11 DATE necember 1983 REPORT MONTil November 1983 COMPLETED BY Fr'nena Hnrrison TELEPHONE '9191457-9521 "E

e n

.3 we 5g4 Cause & Corrective I

l 3 _e E

yg3 Licensee E*

(

No.

Date c5 a

2x Event uy o.3 Actim to H

$5 5

j di y Repori #

isG ju Prevent Recurrence 6

83-105 831102 S

695.3

  • H 1

NA XX ZZZZZZ Intergranular Stress Corrosion Cracking Outage

.r I

l l

1 1

e

  • Intergranu..ar stress Lort osion eracaung u n. age I

2 3

4 F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A. Equipment Failure (Explain)

I-Manual for Preparation of Data 11 Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction 0161)

E-Operator Training & Ucense Examination 4-ContInuatlons -

F: Administrative 5-Load ReduetIons 5

G-Operational Error (Explain) 6-0ther Exhibit I-Same Source P8/77) 110 her(Explain) 6

--eim,u__-_1___m._.r__x N

l C9&L Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 December 6, 1983 FILE:

B09-13510C SERIAL: BSEP/83-3914 Mr. R. C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 LICENSE NOS DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 MONTHLY OPERATING REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of November 1983.

Very truly yours,

'6 C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/kal/ LETCH 2 Attachments cc:

Ms. J. C. Baker Mr. S. W. McDowell Mr. J. P. O'Reilly

, ((

Mr. S. L. Rosen

\\\\

\\

t l

,