B16550, Application for Amend to License NPF-49,revising TS 3/4.7.1.6 Re SG Atmospheric Relief Bypass Valve Lines

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-49,revising TS 3/4.7.1.6 Re SG Atmospheric Relief Bypass Valve Lines
ML20149J343
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/18/1997
From: Mcelwain J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20149J347 List:
References
B16550, NUDOCS 9707280175
Download: ML20149J343 (5)


Text

_ _ . . _ . . .-.

  • ~

yg

' Hoy Feny M (House M WaterfoM, NM5

  • i Northeast .

Y NuclearEnergy slin ione Nori,ar power station Northeast Nuricar Energy Company P.O. Ikis 128

  • Waterford, CF 06'E0128 (860) 447-1791 Fax (360) 444 4277 .

The Northcaat Utilities Systein July 18,1997 Docket No. 50-423 B16550 i

Re: 10CFR50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification ,

Steam Generator Atmosoberic Relief Bvoass Valve Lines (PTSCR 3-27-97) j Pursuant to 10CFR50.90, Northeast Nuclear Energy Company (NNECO) hereby i proposes to amend Operating License NPF-49 by incorporating the attached proposed Technical Specification 3/4.7.1.6 into the Millstone Unit No. 3 Technical Specifications.

Description of Proposed Revision Currrently Millstone Unit No. 3 Technical Specifications do not address the operability of the Steam Generator Atmospheric Relief Bypass Valves (SGARBVs). This proposed revision provides a new Technical Specification and associated Bases for the SGARBVs.-

i i Markuo of Proposed Revision A copy of the marked up Technical Specification pages is contained in Attachment 2.

The markup reflects the currently issued version of the Technical Specifications.

! Pending Technical Specification revisions or Technical Specification revisions issued subsequent to this submittal are not reflected in the enclosed markup.

Retvoe of Proposed Revision A copy of the retyped Technical Specification pages is contained in Attachment 3. The retyped pages reflect the currently issued version of the Technical Specifications.

. Pending Technical Specification revisions or Technical Specification revisions issued subsequent to this submittal are not reflected in the enclosed retype. The enclosed j

retype should be checked for continuity with Technical Specifications prior to issuance. 1

( I 9707290175 970718 '  !

. PDR ADOCK 05000423 c h' n ( 4

__ Il!IE. kIE h

U.S. Nucl ar Regulatory Commission B16550\Page 2

. Backaround. Safety Assessment. Sianificant Hazards Consideration and Environmental Considerations The Background, Safety Assessment, Significant Hazards Consideration and Environmental Considerations that support this proposed revision are contained in Attachments 4 and 5.

Plant Operations Review Committee and Nuclear Safety Assessment Board Review The Plant Operations Review Committee and the Nuclear Safety Assessment Board have reviewed this proposed amendment request and concur with the contained determinations.

State Notification in accordance with 10CFR50.91(b), we are providing the State of Connecticut with a copy of this proposed amendment to ensure their awareness of this request.

Schedule Reauest for NRC Approval NNECO requests NRC review and approval of this proposed revision by October 24, 1997, and that the license amendment be effective upon issuance with implementation within sixty (60) days.

If the NRC Staff should have any questions or comments regarding this submittal, please contact Mr. D. Smith at (860) 437-5840.

NORTHEAST NUCLEAR ENERGY COMPANY FOR: M. H. Brothers i

Vice President - Millstone Unit No. 3 BY: J m)o ohn P. McErfuain ~

i Recovery Officer - Millstone Unit No.1 Subscribed and sworn to before me I this /9 day of I4/// 1997 W

M '

Date Commission Expires: #X#79 acc' /

cc: See Page 3

- t U.S. Nuclser Rcguintory Commission B16550\Page 3

. cc- H. J. Miller, Region l Administrator W. D. Travers, Ph. D., Director, Special Projects Office J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 Mr. Kevin T. A. McCarthy, Director Bureau of Air Management Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 i

l

, 1 l

1 l i

d i

i i

x Docket No. 50-423  ;

B16550

)

.l 1

Attachment 1 Millstone Nuclear Power Station Unit No. 3 Proposed Revicion to Technical Specification S_tpam Generator Atmosoheric Relief Bvoass Valve Lines (PT SCR 3-27-97)

NNECO's Commitments

\

i July 1997 l l

- t 1J.S. Nuclerr Reguintory Commission B16550%ttachment 1\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associateJ regulatory commitments.

Commitment Committed Date or Outage NONE N/A i

I 4

T d

J l

w --