B15135, Proposed Tech Specs Re Feedwater Isolation

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Feedwater Isolation
ML20087G333
Person / Time
Site: Millstone 
Issue date: 03/27/1995
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20087G331 List:
References
B15135, NUDOCS 9504040147
Download: ML20087G333 (6)


Text

1 1

')

Docket No. 50-336 B15135

]

i i

l Millstone Nuclear PLaer Station, Unit No. 2 Proposed Revision to Technical Specifications Feedwater Isolation Marked-up Pages 1

March 1995 9504040147 950327 PDR ADOCK 05000336 P

PDR I

iLECTRICALPOWERSYSTEn ADV 3/4.8.2 ON' SITE POWER DISTRIBUTION SYSTENS

{

A.C. DISTRIBUTION - OPERATING LINITING CONDITION FOR OPERATION (Continued) 3.8.2.1A Inverters 5 and 6 shall be OPERABLE and available for automatic d

transfer via static switches VS1 and VS2 to power busses VIAC-1 and VIAC-2, respectively.

APPLICABILITY: MODES 1, 2 & 3 ACTION:

a.

With inverter 5 or 6 inoperable, restore the inverter to OPERABLE status within 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, b.

With inverter 5 or 6 unavailable for automatic transfer via static switch VS1 or VS2 to power bus VIAC-1 or VIAC-2, respectively, restore the automatic transfer capability within 7 days or be in H0T SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

c.

With inverters 5 and 6 inoperable or unavailable for automatic transfer via static switches VS1 and VS2 to power busses VIAC-1 and VIAC-2, respectively, restore the inverters to OPERABLE status or restore their automatic transfer capability within 7 days or be in H0T SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

l SURVEILLANCE REQUIRENENTS 4.8.2.1A a.

Verify correct inu rter voltage, frequency, and alignment for automatic trar..sfer via static switches VS1 and VS2 to power busses VIAC-1 and VIAC-2, respectively, at least once per 7 days.

b.

Verify that busses VIAC-1 and VIAC-2 automatically transfer to their alternate power sources, inverters 5 and 6, respectively, at least once per refueling during shutdown.

i NILLSTONE - UNIT 2 3/4 8-6a Amendment No.

A,A k

o-

' ELECTRICAL-POWER SYSTENS D.C. DISTRIBUTION SYSTENS (TURBINE BATTERY) - OPERATING LINITING CONDITION FOR OPERATION 3.8.2.5 The following D.C. electrical power subsystem shall be OPERABLE and 4

energized:

The Turbine Battery D.C. electrical power subsystem, consisting of 125-volt D.C. bus 201D and 125-volt D.C. battery bank 201D.

APPLICABILITY: N0 DES 1, 2 & 3 SC1LQN:

a.

With the 125-volt D.C. bus inoperable, restore the inoperable bus to OPERABLE status within 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

With the 125-volt D.C. battery inoperable, restore the inoperable battery to OPERABLE status within 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIRENENTS 4.8.2.5.1 Verify 125-volt D.C. bus 201D is OPERABLE and energized at least once per 7 days.

4.8.2.5.2 The 125-volt battery bank 2010 shall be demonstrated OPERABLE:

a.

At least once per 7 days by verifying that:

1.

The electrolyte level of each pilot cell is between the minimum and maximum level indications marks, and 2.

The pilot cell specific gravity, corrected to 77'F, is 2 1.200, and 3.

The pilot cell voltage is 2 2.08 volts, and 4.

The overall battery voltage is 2125 volts.

b.

At least once per 92 days by verifying that:

1.

The voltage of each connected cell is 2 2.08 volts under float charge, and 2.

The specific gravity, corrected to 77'F, of each cell is 2 1.200.

c.

At least once per 18 months by verifying that:

1.

The cells, cell plates, and battery racks show no visual indication of physical damage or deterioration, and 2.

The cell-to-cell and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material, l

NILLSTONE - UNIT 2 3/4 8-11 Amendmer.t No.

0181

~

g-

,-y i:-

r hs Docket No. 50-336 B15135

.l

-l i

i Millstone Nuclear Power Station, Unit No.

2-Proposed Revision to Technical Specifications Feedwater Isolation Retyped Pages e

i March 1995

.-p.

c1

~

ILECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER DIST 'JTION SYSTEMS A.C. DISTRIBUTION - OPERA..AG LIMITING CONDITION FOR OPERATION (Continued) 3.8.2.1A Inverters 5 and 6 shall be OPERABLE and available for automatic transfer via static switches VS1 and VS2 to power busses VIAC-1 and VIAC-2, respectively.

APPLICABILITY: MODES 1, 2 & 3 ACTION:

a.

With inverter 5 or 6 inoperable, restore the inverter to OPERABLE status within 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

With inverter 5 or 6 unavailable for automatic transfer via static switch VS1 or VS2 to power bus VIAC-1 or VIAC-2, respectively, restore the automatic transfer capability within 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

c.

With inverters 5 and 6 inoperable or unavailable for automatic transfer via static switches VS1 and VS2 to power busses VIAC-1 and VIAC-2, respectively, restore the inverters to OPERABLE status or restore their automatic transfer capability within 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.8.2.1A a.

Verify correct inverter voltage, frequency, and alignment for automatic transfer via static switches VS! and VS2 to power busses VIAC-1 and VIAC-2, respectively, at least once per 7 days.

b.

Verify that busses VIAC-1 and VIAC-2 automatically transfer to their alternate power sources, inverters 5 and 6, respectively, at least once per refueling during i

l shutdown.

4 I

i MILLSTONE - UNIT 2 3/4 8-6a Amendment No.

0140

i

  • ELECTRICAL POWER SYSTENS D.C. DISTRIBUTION SYSTENS (TURBINE BATTERY) - OPERATING LINITING CONDITION FOR OPERATION 1

3.8.2.5 The following D.C. electrical power subsystem shall be OPERABLE and energized:

The Turbine Battery D.C. electrical power subsystem, consisting of 125-volt D.C. bus 201D and 125-volt D.C. battery tank 2010.

APPLICABILITY: N0 DES 1, 2 & 3 ACTION:

a.

With the 125-volt D.C. bus inoperable, restore the inoperable bus to OPERABLE status within 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

With the 125-volt D.C. battery inoperable, restore the inoperable battery to OPERABLE status within 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIRENENTS 4.8.2.5.1 Verify 125-volt D.C. bus 201D is OPERABLE and energized at least once per 7 days.

4.8.2.5.2 The 125-volt battery bank 201D shall be demonstrated OPERABLE:

a.

At least once per 7 days by verifying that:

1.

The electrolyte level of each pilot cell is between the minimum and maximum level indications marks, and 2.

The pilot cell specific gravity, corrected to 77'F, is 2 1.200, and 3.

The pilot cell voltage is 2 2.08 volts, and 4.

The overall battery voltage is 2125 volts.

b.

At least once per 92 days by verifying that:

1.

The voltage of each connected cell is 2 2.08 volts under float charge, and 2.

The specific gravity, corrected to 77'F, of each cell is 2 1.200.

c.

At least once per 18 mo;aths by verifying that:

1.

The cells, cell plates, and battery racks show no visual indication of physical damage or deterioration, and 2.

The cell-to-cell and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material.

NILLSTONE - UNIT 2 3/4 8-11 Amendeent No.

0141

-