B13558, Proposed Rev to Tech Specs Reactor Coolant Specific Activity
Jump to navigation
Jump to search
| ML20055E055 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/29/1990 |
| From: | NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20055E054 | List: |
| References | |
| B13558, NUDOCS 9007100322 | |
| Download: ML20055E055 (2) | |
Text
(.
O Docket No. 50-423 i
B13558 t-i:
Millstone Nuclear Power Station, Unit No. 3 Proposed Revision to Technical Specifications Reactor Coolant Specific Activity k
l m
i l
i t-June 1990 I
9007100322 900629 U
l PDR ADOCK 05000423 P
PDC i
l 1
e IMLE 4.4-4 (Continued)
TABLE NOTATIONS
- A radiochemical analysis for E shall consist of the quantitative measurement of the specific activity for each radionuclide, except for radionuclides with half-lives less than 10 minutes and all radioiodines, which is identified in the reactor coolant..The specific activities for these individual radionuclides shall be used in the determination of E for the reactor coolant sample.
Determination of the contributors to E shall be based upon those energy peaks identifiable with a 95% confidence level.
- Sample to be taken after a minimum of 2 EFPD and 20 days of POWER OPERATION' have elapsed since reactor was last subcritical for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or longer. The provisions of Specification 4.0.4 are not applicable.
- Until the specific activity of the Reactor Coolant System is restored within its limits.
j MILLSTONE - UNIT 3 3/4 4-32