Letter Sequence Other |
---|
|
Results
Other: AEP-NRC-2013-13, Redacted Version of Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Events (Order Number EA-12-049), AEP-NRC-2013-14, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), AEP-NRC-2013-71, First Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies, AEP-NRC-2013-72, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), AEP-NRC-2014-16, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licensees with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), AEP-NRC-2014-17, Second Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events..., AEP-NRC-2014-66, Third Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), AEP-NRC-2014-67, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), AEP-NRC-2014-89, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events, AEP-NRC-2014-91, Update to Communications Assessment Implementation Actions and Timeline - Fukushima Dai-ichi Near-Term Task Force Recommendation 9.3, Emergency Preparedness, AEP-NRC-2015-13, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), AEP-NRC-2015-22, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), AEP-NRC-2015-23, Final Integrated Plan Regarding March 12, 2012, U.S. NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), AEP-NRC-2015-83, Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), ML13234A503, ML13357A325, ML14115A315, ML14140A064, ML14209A122, ML14216A362
|
MONTHYEARAEP-NRC-2013-14, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other AEP-NRC-2013-13, Redacted Version of Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Events (Order Number EA-12-049)2013-02-27027 February 2013 Redacted Version of Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis Events (Order Number EA-12-049) Project stage: Other ML13164A3812013-06-19019 June 2013 Request for Additional Information on the Overall Integrated Plan in Response to Order EA-12-051 Concerning Reliable Spent Fuel Pool Instrumentation Project stage: RAI ML13183A4312013-07-0303 July 2013 Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 Project stage: Approval AEP-NRC-2013-57, Response to Request for Additional Information Regarding the Overall Integrated Plan in Response to Order EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.2013-07-11011 July 2013 Response to Request for Additional Information Regarding the Overall Integrated Plan in Response to Order EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. Project stage: Response to RAI AEP-NRC-2013-71, First Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies2013-08-26026 August 2013 First Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies Project stage: Other AEP-NRC-2013-72, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-08-26026 August 2013 Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML13234A5032013-08-28028 August 2013 Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049 Project stage: Other ML13310B4992013-11-13013 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Instrumentation Project stage: RAI ML13357A3252014-01-10010 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Donald C. Cook Nuclear Plant, Units 1 and 2, TAC Nos.: MF0766 and MF0767 Project stage: Other ML13337A3252014-01-24024 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Acceptance Review AEP-NRC-2014-16, Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licensees with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-27027 February 2014 Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licensees with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other AEP-NRC-2014-17, Second Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events...2014-02-27027 February 2014 Second Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events... Project stage: Other ML14115A3152014-04-28028 April 2014 Plan for the Onsite Audit of Mohr Regarding Implementation of Reliable Spent Fuel Pool Instrumentation Related to Order EA-12-051 Project stage: Other ML14140A0642014-05-21021 May 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other ML14209A1222014-08-13013 August 2014 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other AEP-NRC-2014-67, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-27027 August 2014 Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other AEP-NRC-2014-66, Third Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2014-08-27027 August 2014 Third Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML14216A3622014-08-27027 August 2014 Report for the Onsite Audit of Mohr Regarding Implementation of Reliable Spent Fuel Pool Instrumentation Related to Order EA-12-051 Project stage: Other AEP-NRC-2014-91, Update to Communications Assessment Implementation Actions and Timeline - Fukushima Dai-ichi Near-Term Task Force Recommendation 9.3, Emergency Preparedness2014-12-16016 December 2014 Update to Communications Assessment Implementation Actions and Timeline - Fukushima Dai-ichi Near-Term Task Force Recommendation 9.3, Emergency Preparedness Project stage: Other AEP-NRC-2014-89, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events2014-12-16016 December 2014 Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other AEP-NRC-2015-13, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-25025 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other AEP-NRC-2015-23, Final Integrated Plan Regarding March 12, 2012, U.S. NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-06-16016 June 2015 Final Integrated Plan Regarding March 12, 2012, U.S. NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other AEP-NRC-2015-22, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-06-16016 June 2015 Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other AEP-NRC-2015-83, Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-10-0101 October 2015 Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML15264A8512015-11-0909 November 2015 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Approval 2014-12-16
[Table View] |
Similar Documents at Cook |
---|
Category:Letter type:AEP
MONTHYEARAEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance AEP-NRC-2024-04, License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System2024-03-0606 March 2024 License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System AEP-NRC-2024-11, Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation2024-02-27027 February 2024 Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation AEP-NRC-2024-10, Form OAR-1, Owners Activity Report2024-02-0707 February 2024 Form OAR-1, Owners Activity Report AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report AEP-NRC-2023-11, Form OAR-1, Owners Activity Report2023-01-31031 January 2023 Form OAR-1, Owners Activity Report AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2022-10-12012 October 2022 Unit 2 - Transmittal of Report of Changes to the Emergency Plan 2024-09-09
[Table view] |
Text
AIndiana Michigan Power MICHIGA, Cook Nuclear Plant M AMRO One Cook Place A unit ofAmerican Electric Power Indiana Michigan Powercom August 27, 2014 AEP-NRC-2014-67 10 CFR 50.54(f)
Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
References:
- 1. Letter from E. J. Leeds and M. R. Johnson, U. S. Nuclear Regulatory Commission (NRC), to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, "Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," NRC Order Number EA-12-051, dated March 12, 2012, Agencywide Document Access Management System (ADAMS) Accession No. ML12054A682.
- 2. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to NRC, "Donald C. Cook Nuclear Plant Unit 1 and Unit 2, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," AEP-NRC-2013-14, dated February 27, 2013, ADAMS Accession No. ML13071A323.
- 3. Letter from J. P. Gebbie, I&M, to NRC, "Donald C. Cook Nuclear Plant Units 1 and 2 Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," AEP-NRC-2013-72, dated August 26, 2013, ADAMS Accession No. ML13247A050.
- 4. Letter from T. J. Wengert, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1 and 2 - Interim Staff Evaluation And Request For Additional Information Regarding The Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC NOS. MF0761 AND MF0762)," dated November 13, 2013, ADAMS Accession No. ML13310B499.
U. S. Nuclear Regulatory Commission AEP-NRC-2014-67 Page 2
- 5. Letter from J. P. Gebbie, I&M, to NRC, "Donald C. Cook Nuclear Plant Units 1 and 2 Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," AEP-NRC-2014-16, dated February 27, 2014, ADAMS Accession No. ML14063A041.
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to Indiana Michigan Power Company (I&M), the licensee for the Donald C. Cook Nuclear Plant (CNP)
Units 1 and 2. Reference 1 was immediately effective and directed I&M to establish reliable spent fuel pool level instrumentation. Specific requirements are outlined in Attachment 2 of Reference 1.
Reference 1 required submission of an Overall Integrated Plan (OIP) and status reports at six-month intervals. By Reference 2, I&M provided the OIP for CNP. Reference 3 provided the first six-month status report. Reference 4 provided an NRC Interim Staff Evaluation and Requests for Additional Information. Reference 5 provided the second six-month status report and responses to some of the information requests included in Reference 4. Responses to the remainder of the Reference 4 information requests were posted on the CNP Fukushima e-portal. This letter provides the third six-month status report. to this submittal provides an affirmation. Enclosure 2 provides an update of milestone accomplishments, including any changes to the compliance method, schedule, or need for relief and the basis, if any.
This letter contains no new or revised regulatory commitments. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.
IV44 0 Sincerely, Joel P. Gebbie Site Vice President J RW/kmh
Enclosures:
- 1. Affirmation
- 2. Indiana Michigan Power Company's Third Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation
U. S. Nuclear Regulatory Commission AEP-NRC-2014-67 Page 3 c: M. L. Chawla, NRC Washington, DC J. T. King, MPSC J. A. Kratchman, NRR/JLD/PMB, NRC MDEQ - RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region III A. J. Williamson, AEP Ft. Wayne, w/o enclosure
Enclosure I to AEP-NRC-2014-67 AFFIRMATION I, Joel P. Gebbie, being duly sworn, state that I am Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the U. S. Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.
Indiana Michigan Power Company Joel P. Gebbie Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THSaTýA F2014 My Commission Expires I 5 -O I15&
O* PATRICIA ANN EDDIE Noay u*b*,i. Swe of mdvan County atO Bnion lWMy*oM klqkiinftCaun
Enclosure 2 to AEP-NRC-2014-67 Indiana Michigan Power Company's Third Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation References for this enclosure are identified in Section 8.
1 Introduction Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP),
developed an Overall Integrated Plan (OIP) (Reference 1) documenting the requirements to install reliable spent fuel pool level instrumentation in response to Reference 2. This enclosure provides an update of milestone accomplishments. There are no changes to the compliance method, schedule, or need for relief/relaxation at this time.
2 Milestone Accomplishments The following milestone(s) have been completed since the development of the OIP, and are current as of July 31, 2014.
- Complete Design - Two Engineering Changes will be used to install components required for compliance with Order EA-12-051. Both Engineering Changes, EC-53083 and EC-52892 have been issued.
" Receive Electronics - Electronic components were received from the vendor on July 17, 2014.
- Commence Installation - Installation activities commenced in March 2014.
3 Milestone Schedule Status The following table provides an update to the milestone schedule supporting the OIP. This section provides the activity status of each item, and the target completion date, noting any changes. The dates are planning dates subject to change as design and implementation details are developed.
to AEP-NRC-2014-67 Page 2 Table 1 Milestone Completion Dates Milestone Target Activity Status Revised Target Completion Date Completion Date Submit 60-Day Status Report October 2012 Complete Submit OIP February 2013 Complete Unit I refueling outage (1 st RFO) start March 2013 Complete Submit 6 Month Updates:
Update 1 August 2013 Complete Update 2 February 2014 Complete Update 3 August 2014 Complete with this submittal Update 4 February 2015 Not Started Modifications:
Commence Engineering Modification Design April 2013 Complete Order Electronics April 2013 Complete Complete Design July 2014 Complete Receive electronics April 2014 Complete Commence Installation June 2014 Complete Complete functional test November 2014 Not Started October 2014 Procedures:
Issue Maintenance Procedures August 2014 Complete Training:
Implement Training September 2014 In Progress Submit Completion Report February 2015 Not Started to AEP-NRC-2014-67 Page 3 4 Changes to Compliance Method There are no changes to the compliance method as documented in the OIP.
5 Need for Relief/Relaxation and Basis for the Relief/Relaxation I&M expects to comply with the order implementation date and no relief/relaxation is required at this time.
6 Open Items from OIP and Draft Safety Evaluation (SE)
Responses to the Requests for Additional Information included in the Interim Staff Evaluation (ISE), transmitted by Reference 3, were provided in the second six-month status report (Reference 4) or posted on the CNP Fukushima e-portal.
7 Potential Draft SE Impacts I&M has identified no potential impacts on the Reference 3 ISE.
8 References The following references support the updates to the OIP described in this attachment.
- 1. Letter from J. P. Gebbie, I&M, to U. S. Nuclear Regulatory Commission (NRC), "Donald C. Cook Nuclear Plant Unit 1 and Unit 2, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," AEP-NRC-2013-14, dated February 27, 2013, ADAMS Accession No. ML13071A323.
- 2. Letter from E. J. Leeds and M. R. Johnson, NRC to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status, "Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," NRC Order Number EA-12-051, dated March 12, 2012, ADAMS Accession No. ML12054A682.
- 3. Letter from T. J. Wengert, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1 and 2 - Interim Staff Evaluation and Request For Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC NOS. MF0761 and MF0762)," dated November 13, 2013, ADAMS Accession No. ML13310B499.
- 4. Letter from J. P. Gebbie, I&M, to NRC, "Donald C. Cook Nuclear Plant Units 1 and 2 Six Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)," AEP-NRC-2014-16, dated February 27, 2014, ADAMS Accession No. ML14063A041.