AECM-88-0056, Monthly Operating Rept for Feb 1988
| ML20148B320 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 02/29/1988 |
| From: | Hobbs S, Kingsley O SYSTEM ENERGY RESOURCES, INC. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| AECM-88-0056, AECM-88-56, NUDOCS 8803210446 | |
| Download: ML20148B320 (4) | |
Text
- n
. ~.
DOCKET NO.
50-416 DATE 03/10/88 COMPLETED *BY S. H. Hobbs TELEPHONE 7601)969-2458 OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 l Notes:
l 2.
Reporting Period:
February 1988 l
l 3.
Licensed Thermal Power (MWt): 3833 MWt l
l 4.
Nameplate Rating (Gross MWe): 1372.5 MWe l
l S.
Design Electrical Rating (Net MWe): 1250 MWe l
l 6.
Maximum Dependable Capacity (Gross MWe): 1190 MWe l
l 7.
Maximum Dependable Capacity (Net MWe): -1142 MWe-l l
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.
Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr to Date Cumulative
- 11. Hours In Reporting Period 696.0 1,440 29,458
- 12. Number of Hours Reactor Was Critical 696.0 1,242.6 20,794.7
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Lin 696.0 1,124.7 19,302.2
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,631,546 3,982,467 59,959,564
- 17. Gross Electrical Energy Generated (MWH) 881,130 1,329,610 ly,500,440
- 18. Net Electrical Energy Generated (MWH) 847,942 1,276,451 17,577,208
- 19. Unit Service Factor 100.0 78.1 69.5
- 20. Unit Availability Factor 100.0 78.1 69.5
- 21. Unit Capacity Factor (Using MDC Net) 106.7 77.6 60.2
- 22. Unit Capacity Factor (Using DER Net) 97.5 70.9 53.9
- 23. Unit Forced Outage Rate 0.0 14.6 7.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 C0KHERCIAL OPERATION 07/01/85 J16AECM88030701 - 3 l
[
8803210446 880229 PDR ADOCK 05000416 R
RCD
'[
- i. ;
[-
i, -...
+
',4 k
DOCKET NO. 50-416~
' UNIT 1
~
T' LDATE 03/10/88 CGMPLETED BY 'S. H. Hobbs TELEPHONE ~(601)969-2458 MONTH
- Februa ry 1988 -
- DAY AVERAGE DAILY POWER LEVEL
-DAY.
AVERAGE DAILY: POWER LEVEL (MWe-Net)
(MWe-Net) 1 ~
1216 17 1229 2
1223 18 1233
'3 1232 19 1232 4
1191 20 1215
.5 1215 21 1233 6
1216 22 1222 7
1248-23 1225 8
1245 24 1235 19 1239 25
-1229 10 1238 26 1223 11
-1241 270 1094 12 1247 28 1058 13 1229
.29 1223 4
14 1223' 30 15 1237 31 16 1239 J16AECM88030701 - 4
r y
c a.:
~
~ J-l_
'.s.
s UNIT SHUTDOWNS AND POWER REDUCTIONSI DOCKET NO.:50-416 l
UNITsNAME 1-DATE 03/10/88
, COMPLETED BY S.-H. Hobbs--
TELEPHONE,(601):969-2458 REPORT MONTH February 1988 7
l l'
I I
I I
I I
I I
.1 1
15 l
l l
1 l
l l Method of I Licensee 1
I I
Cause & Corrective' IL l
l No. I Date l Type IDurationi Reason-l Shutting Down!'LEvent i System'IComponent.I Action To l
l l
l (1) i Hours 1
(2) i Reactor l Report #
I Code l~: Code-I
-Prevent. Recurrence
.. 11 1
I i
i l
I (3)'
l I
(4)
I (5)
I
~ il.
1 I
I I
I I
I
'l' l
l l
i i
i I
1 None-
.I l
i I
I I
I I
l l
.1 1
Li-r i
I I
I I
I I
I I
i l
l i
I I
I I
I I
I I
i l
l l
1 1
I I
I I
I I
I 15 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
l-
. l' I
I I
I I
I I
I I
i l'
l I
I I
i l
i I
'l l
11 I
I I
I i
1 I
I i
.I El l
I I
I I
I I
I I
I
.I I
I I
I I
I I
'l i
'l-1 I
I I
I I
I I
I I
I
- l 1
2 3
4 F: Forced Reason:
Method:
Exhibit G~
Instructions
~M S: Scheduled A-Equipment Failure 1-Manual.
for Preparation of-Data (Explain)
'2-Manual Scram
-Entry Sheets for> Licensee V
B-Maintenance or Test'
'3-Automatic. Scram Event Report (LER)
C-Refueling 4-Continued File (NUREG-0161).
D-Regulatory Restriction 5-Reduced load E-Operator Training &
6-Other Licensing Examination
[
F-Administrative
'5 G-Operational Error Exhibit 1-Same Source (Explain)
~,
-H-Other (Explain)
- In accordance with s
J16AECM88030701 - 5
' :Q x.
a-e e
EYETEM ENERGY M50tJMES, INC.
Co.9C Nsta A 72[J$$0 cn3 March 16, 1988 U. S. Nuclear Regulatory Comission Washington, D. C.
20555 Attantion: Document Control Desk Gentlemen:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Dccket No. 50-416 License No. NPF-29 Monthly Operating Report AECH-88/0056 In accordance with the requirement of Technical Specification 6.9.1.10, System Energy Resources, Inc. (SERI) is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for February,1988 (attachment).
This report is submitted one day late due to an administrative error. This was discussed with Mr. L. Medenos of NRC Region II Staff.
If you have any questions or require additional information, please contact this office.
Yours truly, ODK:bms M N TW M E y @ 7-.
Attachment cc: Mr. T. H. Cloninger (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. C. Butcher (w/a)
Dr. J. Nelson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Comission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission
/
Mail Stop 14B20
/g$
IV Washington, D.C.
20555
/
d \\
n a o m l x. n > = m m 3 rc l,c m +.x
\\
J16AECM88030701 - 1
.-