05000423/FIN-2017001-02
From kanterella
(Redirected from 5000423/FIN-2017001-02)
Jump to navigation
Jump to search
Finding | |
---|---|
Title | |
Description | Green. The inspectors identified a Green NCV of 10 CFR 50.55a(f) because Dominion did not perform all required inservice testing (IST) of the Unit 3 C charging pump, 3CHS*P3C, in accordance with the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code. Specifically, from April 15, 2016, to the end of the inspection period, Dominion stopped the required Group A quarterly surveillances which could result in a condition where degradation of the charging pump would remain undetected by IST testing. Dominion entered this issue into their CAP as CR 1064337. 4 This finding was more than minor in accordance with IMC 0612, Power Reactor Inspection Reports, Appendix B, Issue Screening, dated September 7, 2012, as it adversely affected the Equipment Performance attribute of the Mitigating Systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Eliminating quarterly IST surveillance tests could challenge the reliability of the C charging pump and allow degradation of the equipment remaining undetected. In accordance with IMC 0609, Significance Determination Process, Attachment 4, Initial Characterization of Findings, and IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, Section A, Mitigating Systems, Structures or Components and Functionality, the finding screened to be of very low safety significance (Green), when the deficiency affecting the design or qualification whereupon the component maintains operability or functionality question was answered yes. The C charging pump has not yet experienced any failures. This finding has a cross-cutting aspect in Human Performance, Change Management, in accordance with IMC 0310, Aspects within the Cross-Cutting Areas, where leaders use a systematic process for evaluating and implementing change so that nuclear safety remains the overriding priority. Specifically, Dominion evaluated this change to the IST program without requesting relief from the ASME Code requirements. [H.3] |
Site: | Millstone |
---|---|
Report | IR 05000423/2017001 Section 1R22 |
Date counted | Mar 31, 2017 (2017Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.22 |
Inspectors (proximate) | C Highley H. Anagnostopoulus J Amberosini J Furia L Mckown S Pindale T Setzer |
Violation of: | 10 CFR 50.55a |
CCA | H.3, Change Management |
INPO aspect | LA.5 |
' | |
Finding - Millstone - IR 05000423/2017001 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Millstone) @ 2017Q1
Self-Identified List (Millstone)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||