Letter Sequence Other |
|---|
|
Results
Other: 3F0198-11, Provides Confirmation by Util of Actions Completed Re LAR 220 for Unit 3,as Previously Discussed in Ltr, 3F1097-08, Rev 1 to License Amend Request 220,supersedes 970626 Application,Removing Portion of License Condition 2.C.(5) Which Requires Installation & Testing of Flow Indicators in ECCS for Boron Dilution.Description of Changes Encl, 3F1297-21, Forwards Response to NRC Questions & Comments Re Rev 1 to LAR 220,removing Portion of OL Condition 2.C.(5) Re Installation & Testing of Flow Indicators in ECCS to Provide Indication of 40 Gallons Per Min for Boron Dilution, 3F1297-43, Forwards Rev 0 to Calculation M97-0146, Post-LOCA Boron Concentration Mgt for CR-3, in Response to 971212 Telcon RAI Re Rev 1 to LAR 220, 3F1297-44, Forwards Addl Info Re LARs 220 & 223.Confirmation of Actions Discussed W/Nrc on 971218,to Be Taken to Support LAR 220, Response to Re Restart Requirements for Post LOCA Boron Precipitation Prevention & Rev to Commitments Encl
|
MONTHYEAR3F1097-08, Rev 1 to License Amend Request 220,supersedes 970626 Application,Removing Portion of License Condition 2.C.(5) Which Requires Installation & Testing of Flow Indicators in ECCS for Boron Dilution.Description of Changes Encl1997-10-31031 October 1997 Rev 1 to License Amend Request 220,supersedes 970626 Application,Removing Portion of License Condition 2.C.(5) Which Requires Installation & Testing of Flow Indicators in ECCS for Boron Dilution.Description of Changes Encl Project stage: Other 3F1297-21, Forwards Response to NRC Questions & Comments Re Rev 1 to LAR 220,removing Portion of OL Condition 2.C.(5) Re Installation & Testing of Flow Indicators in ECCS to Provide Indication of 40 Gallons Per Min for Boron Dilution1997-12-0101 December 1997 Forwards Response to NRC Questions & Comments Re Rev 1 to LAR 220,removing Portion of OL Condition 2.C.(5) Re Installation & Testing of Flow Indicators in ECCS to Provide Indication of 40 Gallons Per Min for Boron Dilution Project stage: Other 3F1297-43, Forwards Rev 0 to Calculation M97-0146, Post-LOCA Boron Concentration Mgt for CR-3, in Response to 971212 Telcon RAI Re Rev 1 to LAR 2201997-12-13013 December 1997 Forwards Rev 0 to Calculation M97-0146, Post-LOCA Boron Concentration Mgt for CR-3, in Response to 971212 Telcon RAI Re Rev 1 to LAR 220 Project stage: Other ML20197G1101997-12-15015 December 1997 Forwards Safety Evaluation Re Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule Project stage: Approval 3F1297-44, Forwards Addl Info Re LARs 220 & 223.Confirmation of Actions Discussed W/Nrc on 971218,to Be Taken to Support LAR 220, Response to Re Restart Requirements for Post LOCA Boron Precipitation Prevention & Rev to Commitments Encl1997-12-20020 December 1997 Forwards Addl Info Re LARs 220 & 223.Confirmation of Actions Discussed W/Nrc on 971218,to Be Taken to Support LAR 220, Response to Re Restart Requirements for Post LOCA Boron Precipitation Prevention & Rev to Commitments Encl Project stage: Other 3F0198-11, Provides Confirmation by Util of Actions Completed Re LAR 220 for Unit 3,as Previously Discussed in Ltr1998-01-19019 January 1998 Provides Confirmation by Util of Actions Completed Re LAR 220 for Unit 3,as Previously Discussed in Ltr Project stage: Other 1997-12-13
[Table View] |
Text
o a
o
@ Florida Power
?S"1M e.w h -
December 13, 1997-3F1297-43 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Additional Information on License Amendment Request #220 - Revision of Operating License Condition 2.C.(5) (TAC No. M99128)
Reference:
FPC to NRC letten 3F1097-08, dated October 31,1997, " License Amendment Request #220, Revision 1 - Revision of Operating License Condition 2.C.(5)
(TAC No. 99128)"
Dear Sir:
This submittal provides additional information in response to a verbal NRC request on December 12, 1997 regarding Crystal River Unit 3 (CR-3) License Amendment Request
- 220. Accordingly, Florida Power Corporation (FPC) calculation M97-0146, " Post-LOCA Boron Concentration Management fer CR-3," is attached. This calculation provides a summary of control methods and calculations performed to support the CR-3 post loss of coolant accident (LOCA) boron precipitation prevention plan.
No commitments are made in this letter. If you have any questions concerning this response, please contact Mr. David Kunsemiller, Manager, Nuclear Licensing at (352) 563-4566.
Sincerely, c ke.cik M. W. Rencheck, Director bO9l i
Nuclear Engineering and Projects MWR:dah Attachment xc:
Regional Administrator, Region 11 NRR Project Manager l llgljj lll {
ll Senior Resident Inspector
..>a 2
Warren C. Lyon
.,n oO
- ,' L u CRYSTAL RIVER ENERGY COMPLEX
- 15760 W Power Line Street
- Crystal Fbver, Flonda 3442847C8 = (352) 7956486 9712170275 971213
' " * **
PDR
e 4
ATTACIIMENT to 3F1297-43 FPC CALCULATION M97-0146
~
POST-LOCA BORON CONCENTRATION MANAGEMENT FOR CR-3 4
I J
6 l
_