- y....
earon
- p UNITED dTATES NUCLEAR REGULATORY. COMMISSION wAssinatow, o.c. somewooi
- t Decerrber 15, 1997 Mr. Charles H. Cruse Vice President Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
BALTIMORE C?.S AND ELECTRIC COMPANY'S REVISION TO THE REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS 1 AND 2 (TAC NOS. M99127 AND M99128)
Dear Mr. Cruse:
By letter dated June 20,1997, Baltimore Gas and Electric Company (BGE) submitted, for NRC approval, their proposed withdrawal schedule, which was based on the American Society for Testing and Materials (ASTM) E185-70 and ASTM E185-82 and reflected updated fluence information from the surveillance capsules removed in 1992 and 1993 from Calvert Cliffs Units and 2, respectively.
d The NRC staff reviewed the BGE submittal and concluded that the revised surveillance programs for Calvert Cliffs Units 1 and 2 are capable of monitoring the effects of neutron irradiation and the thermal environment on the fracture toughness of ferritic reactor vessel beltline materials for the subject units.
The staff verified that BGE's proposed withdrawal schedules for Calvert Cliffs Units 1 and 2 satisfy the ASTM E185-70 Standard. Since this edition of the standard was current at the time the reactor vessels were purchased, the Calvert Cliffs Units 1 and 2 surveillance capsule withdrawal schedules satisfy the requirements of Appendix H to 10 CFR Part 50. In addition, the staff noted that BGE has implemented the ASTM E185-82 Standard to the maximum extent l.
possible. Therefore, the staff founo that the revised withdrawal schedules are acceptable for l
_ Calvert Cliffs Units 1 arid 2.
I DFD Nf!D F?E PBiTFR cfmy w.z 3
. n l
9712300377 971215 PDR ADOCK 05000317 PDR L
llllllIlJllj I,lll ll
Mr. C. Cruse.
The staff has found that you were responsive to the staffs request for clarification on a technical issuo and that you provided adequate supporting technical information in your submittal in addition, sufficient information was provided by BGE to conduct an independent review of the withdrawal schedules for Calvert Cliffs Units 1 and 2.
The staff's safety evaluation is submhted as Enclosure 1. Enclosure 2 is a summary status of the subject surveillance capsules.
Sincerely, ilS fV Alexander W. Dromerick, Senior Project Manager Project Directorate 11 Division of Reactor Projects - t/II Office of Nuclear Reactor Regulation Docket Nos. 50 317 and 50-318
Enclosures:
- 1. Safety Evaluation
- 2. Status Comparison cc w/ encl: See next page
^'
December 15, 1997
' Mr. C. Ceuse 2-s 6bhe staff has found that you were responsive to the staff's request for r
~'
issue and that you provided adequate supporting technical information in your submittal. In :
' ~ ddition, sufficient information was provided by BGE to conduct an independent revie,w of the-a
- j f withdrawal schedules for Calvert Cliffs Unit Nos.1 and 2.
~
C The staff's safety evaluation is submitted as Enclosure 1. Enclosure 2 is a summary status of ,
the_ subject surveillance capsules.
7<
s
+
4 sincerely, r..
1 N
-tilF y 'i..
Original Signed by:
it i
t' w
a 4
~X,'
Alexander W. Dromerick, Senior Project Manager
,N Project Directorate 11
- i Division of Reactor Projects - t/Il Office of Nuclect Reactor Regulation 1
i Docket Nos. 50 317 and 50 318
Enclosures:
- 1. Safety Evaluation
- 2. Status Comparison cc w/ encl; See next paga DISTRIBUTION:
Docket File -
PUBLIC PDl-1 R/F S. Bajwa S. Little A.- Dromerick T. Harris (email SE only)
OGC ACRS C. Hehl, Region i DOCUMENT NAME; G:\\CC12\\CCSE.AWD
To receive a: copy of this-document indicate in the box:
"C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy 0FFICE.
PMIP011])
IE LA: POI-)U l
D:PDI 1 _
I i
O w
NAME ADrilsfr@ittlec
$littl #
SBajwe MJ7M
/
DATE 12/ if/97 12/l 5 /97 12/ 1 (/97 12/ /97 12/ /97 Official Record Copy
~
c ny f
- j
+ i
' ; j'
t
- i Mr. Charles H. Cruse Baltimore Gas & Electric Company
- cc:
President.
Mr. Joseph H. Walter, Chief Engineer Calvert County Board of Public Service Commission of Commissioners Marvland 175 Main Street Engirieering Division Prince Frederick, MD 20678 6 St. Paul Centre Baltimore, MD 21202-6806 James P. Bennett, Esquire Counsel Kristen A. Burger Esquire Baltimore Gas and Electric Company Maryland People's Counsel P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2102 Baltimore, MD 21202-1631 Jay E. Silberg, Esquire Shaw, Pittman, Potts, und Trowbridge Patricia T. Bimie, Esquire 2300 N Street, MW Co Director Washington, DC 20037 Maryland Safe Energy Coalition P.O. Box 33111 Mr. Thomas N. Pritchett, Director Baltimore, MD 21218 NRM Calvert Cliffs Nuclear Power Plant Mr. Loren F, Donatell 1650 Calvert Cliffs Parkway NRC Technical Training Center Lusby, MD 20657-4702 5700 Brainerd Road Chattanooga, TN 37411-4017 Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. Richard I. McLean, Manager Nuclear Programs Power Plant Research Program Maryland Dept. of Natural Resources Tawes State Office Building, B3 Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road-King of Prussi.1, PA 19406
-