3F1285-04, Monthly Operating Rept for Nov 1985
| ML20138P142 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/30/1985 |
| From: | Graham D, Westafer G FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F1285-04, 3F1285-4, NUDOCS 8512240322 | |
| Download: ML20138P142 (6) | |
Text
.-
i OPERATING DATA REPORT DOCKET NO. 50-302 DATE 17/1/R5 COMPLETED BY D. Graham TELEPHONE 904 795-3802 OPERATING STATUS Notes
- 1. Unit Name:
Crvsen1 River Unit 3
. 2. Reporting Period:
11/1/85 - 11/30/85 2544
- 3. Licensed Thermal Power (MW ):
- 4. Nameplate Rating (Gross MWe):
R90
- 5. Design Electrical Rating (Net MWe):
825 860
- 6. Maximum Dependable Capacity (Gross MWe):
821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NA
- 9. Power Level To Which Restricted,if Any (Net MWe):
NA
- 10. Reasons For Restrictions. If Any:
" O This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 7?n An1A 76440
- 12. Number Of Hours Reactor Was Critical 671.3 3779.4 49695.I
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On.Line 668.2 3570 48487.8
- 15. Unit Reserve Shutdown Hours o
o o
- 16. Gross Thermal Energy Generated (MWH) 4489753 10353229 112015114
- 17. Gross Electrical Energy Generated (MWH) 538751 2529135 37256352
- 18. Net Electrical Energy Generated (MWH) 511645 2386279 35382290
- 19. Unit Service Factor 92 8%
44.5%
63.4%
- 20. Unit Availability Factor 92.8%
44.5%
63.4%
- 21. Unit Capacity Factor (Using MDC Net) 86.6%
36.37.
- 58. 17.
- 22. Unit Capacity Factor (Using DER Net) 86.1%
36.1%
56.1%
- 23. Unit Forced Outage Rate 7.2%
8.3%
19.47.
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
NA-
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved'
- l
/"Y INITIAL CRITICALITY Ill4/77 O
=
INITIAL ELECTRICITY 1/30/77' COMMERCIAL OPERATION 3/13/77-M:
8512240322 851130 PDri ADOCK 05000302 (9/77)
I g
R PDR
1 AVERAGE DAILY UNIT POWER LEVEL (V
DOCKET NO.
so-109 UNIT FLCRP-3 12/3/85 DATE COMPLETED BY D. Graham TELEPHONE 904 795-3802 MONTH November 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVFR AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 831 17 795 2
807 gg 803 830 798 3
,9 4
835 20 797 5
746 21 798 800 272 6
22 7
R15 23 0
8 302 24 414 797 794 9
25 10 808 26 779 13 805 27 785 810 787 12 yg 13 66R 29 787 14 616 30 787 633 15 3,
16 797
. INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
O:
(/
(9/77)
I
O O
O DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS FLCRP-3 UNIT N AME DATE 12/3/85
- s. stewart COMPLETED BY 11/85 REPORT MONTH TELEPHONE 904 795-3802 "L=
c
- Ey Licensee Ee Ee Cause & Corrective E;
c N
f u'.,
No.
Date E
jj 3js 8
Action to Event Present Recurrence f:_:
j;jjg Report #
mU H
g 6
85-22 851108 F
11.2 B
3 85-25 HH PUMPXX Reactor trip on loss of Main Feed Booster Pump.
85-23 851113 S
0.0 A
5 NA HC HTEXCH Reduced power to locate and repair a condenser salt Icak. Also cleaned condenser waterboxes.
85-24 851122 F
40.7 A
3 85-27 CA CRDRVE Reactor trip on high RCS pressure.
Repaired control rod drive stator.
i 1
2 3
4 Method Exhibit G-Instructions F: Forced Reason:
for Preparation of Data S: Scheduled A-Equipment {silure(Explain)
B-Maintenance of Test 2-Ma$g Entry Sheets for Licensee
, y*
l scram C-Refueling 3-Auto scram Event Report (LER) File (NURI G.
D Regulatory Restriction 4-Continued 0161) 5-Reduced Load E-Operator Training & License Examination 9-Other 3
F.Administrat'ive G-Operational Error (Explain)
Exhibit I-Same Source (9/77)
H-Other (Explain)
~
.c
, 4.r--
- -. - - + - - -. - - - - - - - - - -
=
MONTHLY OPERATIONAL
SUMMARY
STATEMENT l
DOCKET NO.50-302 i
l UNITFLCRP-3 DATE 12/3/85 i
i COMPLETED BY S. Stewart TELEPHONE 904 795-3802 l
l l
MONTH November 1985 1
(
I I
l
SUMMARY
STATEMENT: Crystal River 3 operated with one power reduction and two outages 3
during the month. The unit was load limited to approximately 957.
l full power due to steam generator level limitations.
l l
i i
I l
8 a
l i
l l
I O
+. - - -, - - -, -,. -.,....,. _ -... _
f~*
0 0 c:,
e (k
bO CD*
Power C OR PO R AT IO N December 6, 1985 3F1285-04 Mr. James M.
Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn:
Document Control Desk washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DpR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 AJsV.eetroasee 1985 Monthly Operating Report.
These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, a
G.
R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc:
Dr. J.
Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S.
Nuclear Regulatory Commission 101 Marietta Street N.W.,
Suite 2900 Atlanta, GA 30323 l
G EN ERAL OFFICE 3201 Thirty-fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151
8 Florida INTEROFFICE CORRESPONDENCE Powe.o=r coano..
Nuclear Safety and Reliability NA2P 230-4414 Office MAC Telephone
SUBJECT:
NRC Monthly Operating Report TO:
Gary Westafer DATE: December 4, 1985 PER85-0261 Attached is the Crystal River Unit #3 November 1985 input to the NRC Monthly Operating Report required by Regulatory Guide 1.16.
k-P. F. MCKee
- dsg cc A.E. Friend E.C. Simpson M.W. Averett R.J. Finnin T.F. Stetka J.H. Lander W.R. Candy V.R. Roppel i