3F1285-04, Monthly Operating Rept for Nov 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1985
ML20138P142
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/30/1985
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F1285-04, 3F1285-4, NUDOCS 8512240322
Download: ML20138P142 (6)


Text

.-

i OPERATING DATA REPORT DOCKET NO. 50-302 DATE 17/1/R5 COMPLETED BY D. Graham TELEPHONE 904 795-3802 OPERATING STATUS Notes

1. Unit Name: Crvsen1 River Unit 3

. 2. Reporting Period: 11/1/85 - 11/30/85

3. Licensed Thermal Power (MW ):

2544

4. Nameplate Rating (Gross MWe): R90
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe):

821

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,if Any (Net MWe): NA
10. Reasons For Restrictions. If Any:

O This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 7?n An1A 76440
12. Number Of Hours Reactor Was Critical 671.3 3779.4 49695.I
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On.Line 668.2 3570 48487.8
15. Unit Reserve Shutdown Hours o o o
16. Gross Thermal Energy Generated (MWH) 4489753 10353229 112015114 .
17. Gross Electrical Energy Generated (MWH) 538751 ,_,

2529135 37256352

18. Net Electrical Energy Generated (MWH) 511645 2386279 35382290
19. Unit Service Factor 92 8% 44.5% 63.4%
20. Unit Availability Factor 92.8% 44.5% 63.4%
21. Unit Capacity Factor (Using MDC Net) 86.6% 36.37. 58. 17.
22. Unit Capacity Factor (Using DER Net) 86.1% 36.1% 56.1%
23. Unit Forced Outage Rate 7.2% 8.3% 19.47.
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

NA- '

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA -
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved'
  • l

/"Y INITIAL CRITICALITY Ill4/77 O = INITIAL ELECTRICITY 1/30/77'  !

COMMERCIAL OPERATION 3/13/77-M:

8512240322 851130 PDri ADOCK 05000302 (9/77) I g R PDR ,

. . 1 AVERAGE DAILY UNIT POWER LEVEL l

(

V DOCKET NO. so-109 UNIT FLCRP-3 DATE 12/3/85 COMPLETED BY D. Graham TELEPHONE 904 795-3802 MONTH November 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVFR AGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 831 17 795 2 807 gg 803 830 798 3 ,9 4 835 20 797 5 746 21 798 6

800 272 22 7 R15 23 0 8 302 24 414 9 797 794 25 10 808 26 _ 779 13 805 27 785 12 810 yg 787 13 66R 29 787 14 616 30 787 15 633 3, 16 797

. INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

O:

(/ * (9/77)

I

O O O .

  • DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME FLCRP-3 .

DATEs. 12/3/85stewart COMPLETED BY REPORT MONTH 11/85 TELEPHONE 904 795-3802 "L c

=

- E; c *Ey Licensee Ee Ee Cause & Corrective No. Date H

E jj f:_: $

$ 3js j;jjg Event Report #

N mU g f u'.,

8 Action to Present Recurrence 6

85-22 851108 F 11.2 B 3 85-25 HH PUMPXX Reactor trip on loss of Main Feed Booster Pump.

85-23 851113 S 0.0 A 5 NA HC HTEXCH Reduced power to locate and repair a condenser salt Icak. Also cleaned condenser waterboxes.

85-24 851122 F 40.7 A 3 85-27 CA CRDRVE Reactor trip on high RCS pressure.

Repaired control rod drive stator.

i 1 2 3 4 F: Forced Reason: Method Exhibit G-Instructions S: Scheduled A-Equipment {silure(Explain) , y*

for Preparation of Data B-Maintenance of Test - 2-Ma$gl scram Entry Sheets for Licensee C-Refueling 3-Auto scram Event Report (LER) File (NURI G.

D Regulatory Restriction 4-Continued 0161) '

E-Operator Training & License Examination 5-Reduced Load 9-Other 3 F.Administrat'ive G-Operational Error (Explain) Exhibit I- Same Source (9/77) H-Other (Explain)

~ .

- - . . - , , , . ,- , , , . .c -

,- - - . - - - - ,, - - - , - , 4.r-- - - . - - + - - - . - - - - - - - - - - - . - - - - -

=

MONTHLY OPERATIONAL

SUMMARY

STATEMENT l DOCKET NO.50-302 i

l UNITFLCRP-3 DATE 12/3/85 i

i COMPLETED BY S. Stewart TELEPHONE 904 795-3802 l

l l MONTH November 1985 1

( I I

l

SUMMARY

STATEMENT: Crystal River 3 operated with one power reduction and two outages 3

during the month. The unit was load limited to approximately 957. l full power due to steam generator level limitations. l l

i i

I l

8 a

l i

l l

l I

O ,

+ . - - - , - - - , - , . - . , . . . . , . _ - . . . _

f~* 00 c:, e bO CD*

(k Power C OR PO R AT IO N December 6, 1985 3F1285-04 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DpR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 AJsV .eetroasee 1985 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, a

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 l

G EN ERAL OFFICE 3201 Thirty-fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151

8 Florida Powe.o=r coano..

SUBJECT:

INTEROFFICE CORRESPONDENCE Nuclear Safety and Reliability NRC Monthly Operating Report Office NA2P MAC 230-4414 Telephone TO: Gary Westafer DATE: December 4, 1985 PER85-0261 Attached is the Crystal River Unit #3 November 1985 input to the NRC Monthly Operating Report required by Regulatory Guide 1.16.