3F1285-04, Monthly Operating Rept for Nov 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1985
ML20138P142
Person / Time
Site: Crystal River 
Issue date: 11/30/1985
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F1285-04, 3F1285-4, NUDOCS 8512240322
Download: ML20138P142 (6)


Text

.-

i OPERATING DATA REPORT DOCKET NO. 50-302 DATE 17/1/R5 COMPLETED BY D. Graham TELEPHONE 904 795-3802 OPERATING STATUS Notes

1. Unit Name:

Crvsen1 River Unit 3

. 2. Reporting Period:

11/1/85 - 11/30/85 2544

3. Licensed Thermal Power (MW ):
4. Nameplate Rating (Gross MWe):

R90

5. Design Electrical Rating (Net MWe):

825 860

6. Maximum Dependable Capacity (Gross MWe):

821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,if Any (Net MWe):

NA

10. Reasons For Restrictions. If Any:

" O This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 7?n An1A 76440
12. Number Of Hours Reactor Was Critical 671.3 3779.4 49695.I
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On.Line 668.2 3570 48487.8
15. Unit Reserve Shutdown Hours o

o o

16. Gross Thermal Energy Generated (MWH) 4489753 10353229 112015114
17. Gross Electrical Energy Generated (MWH) 538751 2529135 37256352
18. Net Electrical Energy Generated (MWH) 511645 2386279 35382290
19. Unit Service Factor 92 8%

44.5%

63.4%

20. Unit Availability Factor 92.8%

44.5%

63.4%

21. Unit Capacity Factor (Using MDC Net) 86.6%

36.37.

58. 17.
22. Unit Capacity Factor (Using DER Net) 86.1%

36.1%

56.1%

23. Unit Forced Outage Rate 7.2%

8.3%

19.47.

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

NA-

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

NA

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved'

  • l

/"Y INITIAL CRITICALITY Ill4/77 O

=

INITIAL ELECTRICITY 1/30/77' COMMERCIAL OPERATION 3/13/77-M:

8512240322 851130 PDri ADOCK 05000302 (9/77)

I g

R PDR

1 AVERAGE DAILY UNIT POWER LEVEL (V

DOCKET NO.

so-109 UNIT FLCRP-3 12/3/85 DATE COMPLETED BY D. Graham TELEPHONE 904 795-3802 MONTH November 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVFR AGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 831 17 795 2

807 gg 803 830 798 3

,9 4

835 20 797 5

746 21 798 800 272 6

22 7

R15 23 0

8 302 24 414 797 794 9

25 10 808 26 779 13 805 27 785 810 787 12 yg 13 66R 29 787 14 616 30 787 633 15 3,

16 797

. INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

O:

(/

(9/77)

I

O O

O DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS FLCRP-3 UNIT N AME DATE 12/3/85

s. stewart COMPLETED BY 11/85 REPORT MONTH TELEPHONE 904 795-3802 "L=

c

  • Ey Licensee Ee Ee Cause & Corrective E;

c N

f u'.,

No.

Date E

jj 3js 8

Action to Event Present Recurrence f:_:

j;jjg Report #

mU H

g 6

85-22 851108 F

11.2 B

3 85-25 HH PUMPXX Reactor trip on loss of Main Feed Booster Pump.

85-23 851113 S

0.0 A

5 NA HC HTEXCH Reduced power to locate and repair a condenser salt Icak. Also cleaned condenser waterboxes.

85-24 851122 F

40.7 A

3 85-27 CA CRDRVE Reactor trip on high RCS pressure.

Repaired control rod drive stator.

i 1

2 3

4 Method Exhibit G-Instructions F: Forced Reason:

for Preparation of Data S: Scheduled A-Equipment {silure(Explain)

B-Maintenance of Test 2-Ma$g Entry Sheets for Licensee

, y*

l scram C-Refueling 3-Auto scram Event Report (LER) File (NURI G.

D Regulatory Restriction 4-Continued 0161) 5-Reduced Load E-Operator Training & License Examination 9-Other 3

F.Administrat'ive G-Operational Error (Explain)

Exhibit I-Same Source (9/77)

H-Other (Explain)

~

.c

, 4.r--

- -. - - + - - -. - - - - - - - - - -

=

MONTHLY OPERATIONAL

SUMMARY

STATEMENT l

DOCKET NO.50-302 i

l UNITFLCRP-3 DATE 12/3/85 i

i COMPLETED BY S. Stewart TELEPHONE 904 795-3802 l

l l

MONTH November 1985 1

(

I I

l

SUMMARY

STATEMENT: Crystal River 3 operated with one power reduction and two outages 3

during the month. The unit was load limited to approximately 957.

l full power due to steam generator level limitations.

l l

i i

I l

8 a

l i

l l

I O

+. - - -, - - -, -,. -.,....,. _ -... _

f~*

0 0 c:,

e (k

bO CD*

Power C OR PO R AT IO N December 6, 1985 3F1285-04 Mr. James M.

Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn:

Document Control Desk washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DpR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 AJsV.eetroasee 1985 Monthly Operating Report.

These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, a

G.

R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc:

Dr. J.

Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S.

Nuclear Regulatory Commission 101 Marietta Street N.W.,

Suite 2900 Atlanta, GA 30323 l

G EN ERAL OFFICE 3201 Thirty-fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151

8 Florida INTEROFFICE CORRESPONDENCE Powe.o=r coano..

Nuclear Safety and Reliability NA2P 230-4414 Office MAC Telephone

SUBJECT:

NRC Monthly Operating Report TO:

Gary Westafer DATE: December 4, 1985 PER85-0261 Attached is the Crystal River Unit #3 November 1985 input to the NRC Monthly Operating Report required by Regulatory Guide 1.16.

k-P. F. MCKee

dsg cc A.E. Friend E.C. Simpson M.W. Averett R.J. Finnin T.F. Stetka J.H. Lander W.R. Candy V.R. Roppel i

i l

5/85 906 205(S)

.. _ -