i L

AVERAGE DAILY UNIT POWER LEVEL

(

, DOCKET NO.90-102 UNIT FLCRP-3 DATE 12/2/83 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH November 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 816 17 808 2

847 18 809 3

848 19 569 4

849 20 330 5

842 21 6v 858 6

793 836

(

7 836 23 847 8

24 852 864 9

6R4 25 10 600 26 852 779 11 27 850-12 A77 28 854 13 712 859 29 14 R10 30 858 15 838 3g 16 AA; INSTRUC110NS On this format, list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8312120150 831202 PDR ADOCK 05000

.,,c [,

R e-l

OPERATING DATA REPORT 7

(

DOCKET NO 50 '107 DATE 12 /2 /83 COMPLETED BY' D-Graham.

TELEPHONE (904) 795-3802 OPERATING STATUS Notes

1. Unit Name:

Crystal River Unit 3

2. Reportag Period:

11/1/83 - 11/30/83

3. Licensed Thermal Power (MWt):

2544 890

4. Nameplate Rating (Gross MWe):
5. Design Electrical Ratag (Net MWe):

825

6. Maximum Dependable Capacity (Gross MWe):

850-

7. Maximum Dependable Capacity (Net MWe):

811 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power level To Whici Restricted,If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any:

N/A

~ '!his Month

.Yr to-Date Cumulative

[

!!. Hours In Reporting Period 7?n 8016 sRags

12. Number Of Hours Reactor Was Critical 707.7 4618 36825.2
13. Resc' tor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator Oh 699.6 4418.9 35885.8 ~
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1665712 9671107 80196062
17. Gross Electrical Energy Generated (MWH) 585678,_,

3341436 27308053

18. Net Electrical Energy Generated (MWH) 558720 3182028 25926908 i.
19. Unit Sernce Factor 97.2%.

55.1%

60.9%

20. Unit Availability Factor 97.2%

55.1%

60.9%

95.7%

48.9%

55.8%

21. Unit Capacity Factor (Using MDC Net)
22. Unit' Capacity Factor (Using DER Net) 94.1%

48.1%

53.4%

23. Unit Forced Outage Rate 2.8%

4.0%

23.9%

24 Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

None

.,e

25. If Shut Down At End Of Report Period, Estimated bate of Startup:

N/A

26. Units In Test Status (Prior to Commercal Operation):

Forecast Achied INITIAL CRITICALITY I/14/77..

(

INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/77' (9/77)

,,,,-,w,-,

,,-n.,..---,-m-..,,---m-w,,.

,e n,,..

~-

q A

^

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-302 l

UNIT NAME FT rup-1 DAH 12/2/R3 REPORT MONTH 11/83

^

MLEPHONE (Onta 795-1R07 Licensee

,E r, b,

Cause & Currective

.! E 3

h I('

No.

D.it e g

3g

(

,g g 5 Event y

Action to H

$ I, 5

5dj=2 Report er mV o'

Present Recurrence v

6 83-30 831109 F

16 A

N/A N/A HC HTEXCH Reduced power to locate leak in condenser.

83-31 831112 F

11.1 A

3 N/A CH PUMPXX Failure of feedwater pump control system resulted in scram on RCS High Pressure.

83-32 831118 F

83 B

N/A N/A HC HTEXCH Reduced power to clean condenser tubes.

83-33 831119 F

9.3 B

1 N/A CB MOTORX Shutdown to add oil to A RCP motor.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Repose Ill'RI File INURI G-D-Regulatory Restriction 4-Other I E xplain) 0161) 1 -Operator Training & License Examination F-Administrative 5

G. Operational La ror (Explain)

I stubit I Same Source p:/77)

Il-Other I E xplain)

PONTHLY OPERATIONAL

SUMMARY

STATDENT

('

DOCKET NO. 50-302 UNIT FLCRP-3 DATE 12/2/83 C(MPLETED BY D. Fields TELEPHONE (904) 795-3802 MONTH November-1983

SUMMARY

STATEMENT:

The unit operated at full capacity for the entire month with only minor problems. One scram due to loss of a feed pump occurred and one shutdown was required to add oil to the 'A' reactor coolant pump.

I l

l l

l l

l l

l i

l t

l L

cGe o,m

. n{Xhe:-.,y, d

N ' b '.q vg,

r y

j?

kk5fk Florida Power COmPOmafeoes December 7,1983 3F1283-ll Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Mr. DeYoung:

Attached are twelve (12) copies of the Crystal River Unit 3 November 1983 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

/

jf%hoen1 E.C. Simpson Director Nuclear Operations Engineering and Licensing AEF:jcf Attachments cc:

Mr. J.P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303

+

\\

General Office 32o1 nurty-fourtn street soutn. P O. Box 14o42, st. Petersburg. Florida 33733 e 813-866-5151

,