Monthly Operating Rept for Nov 1983
ML20082Q373
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/02/1983
From: Field D, Graham D, Eric Simpson
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F1283-11, NUDOCS 8312120150
Download: ML20082Q373 (5)


Text

i L

AVERAGE DAILY UNIT POWER LEVEL

, DOCKET NO.90-102

(

UNIT FLCRP-3 DATE 12/2/83 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH November 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 816 17 808 2 847 18 809 _

3 848 _ 19 569 4 849 20 330 5 842 21 6v 858 793 6

( 7 836 23 836 8

847 24 852 9 6R4 25 864 10 600 26 852 _

11 779 27 850-12 A77 28 854 712 859 13 29 14 R10 30 858 15 838 3g 16 AA; INSTRUC110NS On this format, list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8312120150 831202 .,,c PDR ADOCK 05000 [,

R e- ,

l

OPERATING DATA REPORT 7

('-

DOCKET NO 50 '107 DATE 12 /2 /83 COMPLETED BY' D- Graham.

TELEPHONE (904) 795-3802 OPERATING STATUS ,

Crystal River Unit 3 Notes -

1. Unit Name:
2. Reportag Period: 11/1/83 - 11/30/83
3. Licensed Thermal Power (MWt):

2544

4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Ratag (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 850-
7. Maximum Dependable Capacity (Net MWe): 811 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power level To Whici Restricted,If Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A

~ '!his Month .Yr to-Date Cumulative

!!. Hours In Reporting Period 7?n 8016 sRags

[

12. Number Of Hours Reactor Was Critical 707.7 4618 36825.2
13. Resc' tor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator Oh 699.6 4418.9 35885.8 ~
15. Unit Reserve Shutdown Hours 0 0 0 - -
16. Gross Thermal Energy Generated (MWH) 1665712 9671107 80196062 .
17. Gross Electrical Energy Generated (MWH) 585678 ,_, 3341436 27308053
18. Net Electrical Energy Generated (MWH) 558720 3182028 25926908 i.
19. Unit Sernce Factor .

97.2%. 55.1% 60.9% .

20. Unit Availability Factor 97.2% 55.1% 60.9% '
21. Unit Capacity Factor (Using MDC Net) -

95.7% 48.9% 55.8%

22. Unit' Capacity Factor (Using DER Net) 94.1% 48.1% 53.4%
23. Unit Forced Outage Rate 2.8% 4.0% 23.9%

24 Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each): . .

None .

.,e

25. If Shut Down At End Of Report Period, Estimated bate of Startup: N/A >
26. Units In Test Status (Prior to Commercal Operation): Forecast Achied INITIAL CRITICALITY I/14/77.. -

( INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/77' (9/77)

- ,- , - - - - - , - - -, , , - , , ,,,,-,w,-, ,,-n.,..---,-m-..,,---m-w,,. - - - . . - , ,e n,,.. ~-

q ^

A DOCKET NO. 50-302 l UNIT SHUTDOWNS AND POWER REDUCTIONS FT rup-1 UNIT NAME DAH 12/2/R3

^

REPORT MONTH 11/83 MLEPHONE (Onta 795-1R07

, .! E 3 h I(' Licensee ,E r, b, Cause & Currective No. D.it e g 3g ( ,g g 5 Event y $ Action to H $ I, 5 5dj=2 Report er mV vo' Present Recurrence 6

83-30 831109 F 16 A N/A N/A HC HTEXCH Reduced power to locate leak in condenser.

83-31 831112 F 11.1 A 3 N/A CH PUMPXX Failure of feedwater pump control system resulted in scram on RCS High Pressure.

83-32 831118 F 83 B N/A N/A HC HTEXCH Reduced power to clean condenser tubes.

83-33 831119 F 9.3 B 1 N/A CB MOTORX Shutdown to add oil to A RCP motor.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Repose Ill'RI File INURI G-D-Regulatory Restriction 4-Other I E xplain) 0161) 1 -Operator Training & License Examination F-Administrative 5 G. Operational La ror (Explain) I stubit I Same Source p:/77) Il-Other I E xplain)

PONTHLY OPERATIONAL

SUMMARY

STATDENT

('

DOCKET NO. 50-302 UNIT FLCRP-3 DATE 12/2/83 C(MPLETED BY D. Fields TELEPHONE (904) 795-3802 MONTH November-1983

SUMMARY

STATEMENT: The unit operated at full capacity for the entire month with only minor problems. One scram due to loss of a feed pump occurred and one shutdown was required to add oil to the 'A' reactor coolant pump.

I l

l l

l l

l l

l i

l t

l L

cGe o,m .

. dn{Xhe:- .,y, N

r

' bvg' .q, y j?

kk5fk Florida Power COmPOmafeoes December 7,1983 3F1283-ll Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Mr. DeYoung:

Attached are twelve (12) copies of the Crystal River Unit 3 November 1983 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

/

jf%hoen1 E.C. Simpson Director Nuclear Operations Engineering and Licensing AEF:jcf Attachments cc: Mr. J.P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303

+

\

General Office 32o1 nurty-fourtn street soutn . P O. Box 14o42, st. Petersburg. Florida 33733 e 813-866-5151 ,