AVERAGE DAILY UNIT POWER LEVEL
(
, DOCKET NO.90-102 UNIT FLCRP-3 DATE 12/2/83 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH November 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 816 17 808 2
847 18 809 3
848 19 569 4
849 20 330 5
842 21 6v 858 6
793 836
(
7 836 23 847 8
24 852 864 9
6R4 25 10 600 26 852 779 11 27 850-12 A77 28 854 13 712 859 29 14 R10 30 858 15 838 3g 16 AA; INSTRUC110NS On this format, list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) 8312120150 831202 PDR ADOCK 05000
.,,c [,
R e-l
OPERATING DATA REPORT 7
(
DOCKET NO 50 '107 DATE 12 /2 /83 COMPLETED BY' D-Graham.
TELEPHONE (904) 795-3802 OPERATING STATUS Notes
- 1. Unit Name:
Crystal River Unit 3
- 2. Reportag Period:
11/1/83 - 11/30/83
- 3. Licensed Thermal Power (MWt):
2544 890
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Ratag (Net MWe):
825
- 6. Maximum Dependable Capacity (Gross MWe):
850-
- 7. Maximum Dependable Capacity (Net MWe):
811 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power level To Whici Restricted,If Any (Net MWe): N/A
- 10. Reasons For Restrictions,If Any:
N/A
~ '!his Month
.Yr to-Date Cumulative
[
!!. Hours In Reporting Period 7?n 8016 sRags
- 12. Number Of Hours Reactor Was Critical 707.7 4618 36825.2
- 13. Resc' tor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator Oh 699.6 4418.9 35885.8 ~
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1665712 9671107 80196062
- 17. Gross Electrical Energy Generated (MWH) 585678,_,
3341436 27308053
- 18. Net Electrical Energy Generated (MWH) 558720 3182028 25926908 i.
- 19. Unit Sernce Factor 97.2%.
55.1%
60.9%
- 20. Unit Availability Factor 97.2%
55.1%
60.9%
95.7%
48.9%
55.8%
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit' Capacity Factor (Using DER Net) 94.1%
48.1%
53.4%
- 23. Unit Forced Outage Rate 2.8%
4.0%
23.9%
24 Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
None
.,e
- 25. If Shut Down At End Of Report Period, Estimated bate of Startup:
N/A
- 26. Units In Test Status (Prior to Commercal Operation):
Forecast Achied INITIAL CRITICALITY I/14/77..
(
INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/77' (9/77)
,,,,-,w,-,
,,-n.,..---,-m-..,,---m-w,,.
,e n,,..
~-
q A
^
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-302 l
UNIT NAME FT rup-1 DAH 12/2/R3 REPORT MONTH 11/83
^
MLEPHONE (Onta 795-1R07 Licensee
,E r, b,
Cause & Currective
.! E 3
h I('
No.
D.it e g
3g
(
,g g 5 Event y
Action to H
$ I, 5
5dj=2 Report er mV o'
Present Recurrence v
6 83-30 831109 F
16 A
N/A N/A HC HTEXCH Reduced power to locate leak in condenser.
83-31 831112 F
11.1 A
3 N/A CH PUMPXX Failure of feedwater pump control system resulted in scram on RCS High Pressure.
83-32 831118 F
83 B
N/A N/A HC HTEXCH Reduced power to clean condenser tubes.
83-33 831119 F
9.3 B
1 N/A CB MOTORX Shutdown to add oil to A RCP motor.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Repose Ill'RI File INURI G-D-Regulatory Restriction 4-Other I E xplain) 0161) 1 -Operator Training & License Examination F-Administrative 5
G. Operational La ror (Explain)
I stubit I Same Source p:/77)
Il-Other I E xplain)
PONTHLY OPERATIONAL
SUMMARY
STATDENT
('
DOCKET NO. 50-302 UNIT FLCRP-3 DATE 12/2/83 C(MPLETED BY D. Fields TELEPHONE (904) 795-3802 MONTH November-1983
SUMMARY
STATEMENT:
The unit operated at full capacity for the entire month with only minor problems. One scram due to loss of a feed pump occurred and one shutdown was required to add oil to the 'A' reactor coolant pump.
I l
l l
l l
l l
l i
l t
l L
cGe o,m
. n{Xhe:-.,y, d
N ' b '.q vg,
r y
j?
kk5fk Florida Power COmPOmafeoes December 7,1983 3F1283-ll Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Mr. DeYoung:
Attached are twelve (12) copies of the Crystal River Unit 3 November 1983 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely,
/
jf%hoen1 E.C. Simpson Director Nuclear Operations Engineering and Licensing AEF:jcf Attachments cc: