3F1225-01, Unit 3 - Documentary Evidence of Performance Bond Continuation

From kanterella
Jump to navigation Jump to search
Unit 3 - Documentary Evidence of Performance Bond Continuation
ML25345A122
Person / Time
Site: Crystal River  
Issue date: 12/11/2025
From: Reid B
ADP CR3, Orano TN Americas, Progress Energy Florida
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
3F1225-01
Download: ML25345A122 (0)


Text

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 Docket 50-302 Docket 72-1035 Operating License No. DPR-72

[Type here]

ADP CR3, LLC December 11, 2025 3F1225-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Documentary Evidence of Performance Bond Continuation References:

1. Crystal River Unit 3 - Facility Operating License DPR-72, Amendment No. 261
2. Letter from ADP CR3 (Reid) to USNRC (Document Control Desk), Crystal River Unit 3 - Documentary Evidence of Performance Bond, dated 12/31/2024 (3F1224-
01) (ML24366A033)

Dear Sir or Madam:

The Crystal River Unit 3 Facility Operating License contains Conditions that must be met by the Licensee. Condition 19 of section 2.C of the license states the following:

ADP CR3 must ensure that a performance bond is obtained if a settlement agreement with the U.S. Department of Energy (DOE) on DOE reimbursements for spent fuel management expenses is not entered into by January 1, 2025. The performance bond will be effective January 1, 2025, initially in an amount equal to one year's worth of spent fuel management expenses. ADP CR3 will thereafter ensure that a performance bond is maintained for subsequent years, in the amount of the applicable estimated annual expense, until a settlement agreement with the DOE is entered into.

In accordance with the above Condition, ADP CR3 hereby submits documentary evidence that a performance bond in the amount of $7.822 million has been obtained, effective December 31, 2025. This bond is a continuation of the original performance bond submitted in Reference 2 and has been adjusted for estimated 2026 annual ISFSI expenses. Documentary evidence of the performance bond continuation is contained in the Attachment to this letter.

This letter contains no new regulatory commitments.

If you have any questions regarding this letter or require additional information, please contact Mr.

Craig Miller, ISFSI Licensing Manager, at (352) 634-3954.

U.S. Nuclear Regulatory Commission Page 2 of 2 3F1225-01 Sincerely, Billy Reid Nuclear Executive BR/clm

Attachment:

Performance Bond Continuation Certificate cc:

NMSS Project Manager Director, Office of Material Safety and Safeguards Regional Administrator, Region 1 J

\j

~

~

ADP CR3, LLC DOCKET NUMBER 50-302 / 72-1035 LICENSE NUMBER DPR-72 ATTACHMENT Performance Bond Continuation Certificate (1 page excluding this cover sheet)

3F1225-01 CONTINUATION CERTIFICATE The Liberty Mutual Insurance Company (hereinafter called the Surety) hereby continues in force its Bond No. 018241082 in the sum of Seven Million Eight Hundred Twenty Two Thousand Dollars and 00/100 ($7,822,000.00)

Dollars, on behalf of TN Americas LLC in favor of ADP CR3, LLC for CR3 Spent Fuel Mgt Expenses Reimbursement subject to all the conditions and terms thereof through 31st Day of December, 2026 at location of risk.

This Continuation is executed upon the express condition that the Surety's liability shall not be cumulative and shall be limited at all times by the amount of the penalty stated in the bond.

IN WITNESS WHEREOF, the Surety has caused this instrument to be signed by its duly authorized Attorney-in-Fact and its corporate seal to be hereto affixed this 4th Day of November, 2025.