ML24366A033

From kanterella
Jump to navigation Jump to search
Documentary Evidence of Performance Bond
ML24366A033
Person / Time
Site: Crystal River  Duke Energy icon.png
Issue date: 12/31/2024
From: Reid B
ADP CR3
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
3Fi112-01
Download: ML24366A033 (1)


Text

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 Docket 50-302 Docket 72-1035 Operating License No. DPR-72

[Type here]

ADP CR3, LLC December 31, 2024 3F1224-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Documentary Evidence of Performance Bond

Reference:

Crystal River Unit 3 - Facility Operating License DPR-72, Amendment No. 261

Dear Sir or Madam:

The Crystal River Unit 3 Facility Operating License contains Conditions that must be met by the Licensee. Condition 19 of section 2.C of the license states the following:

ADP CR3 must ensure that a performance bond is obtained if a settlement agreement with the U.S. Department of Energy (DOE) on DOE reimbursements for spent fuel management expenses is not entered into by January 1, 2025.

The performance bond will be effective January 1, 2025, initially in an amount equal to one year's worth of spent fuel management expenses. ADP CR3 will thereafter ensure that a performance bond is maintained for subsequent years, in the amount of the applicable estimated annual expense, until a settlement agreement with the DOE is entered into.

In accordance with the above Condition, ADP CR3 hereby submits documentary evidence that a performance bond in the amount of $7.7 million has been obtained, effective December 31, 2024.

Documentary evidence of the performance bond is contained in the Attachment to this letter.

This letter contains no new regulatory commitments.

If you have any questions regarding this letter or require additional information, please contact Mr. Craig Miller, ISFSI Licensing Manager, at (352) 634-3954.

Sincerely, Billy Reid Nuclear Executive BR/clm

Attachment:

Documentary Evidence of Performance Bond cc:

NMSS Project Manager Director, Office of Material Safety and Safeguards Regional Administrator, Region

ADP CR3, LLC DOCKET NUMBER 50-302 / 72-1035 LICENSE NUMBER DPR-72 ATTACHMENT Documentary Evidence of Performance Bond (2 pages excluding this cover sheet)