1

\ OPERATING DATA REPORT DOCKET NO. 50-302 DATE 9/3/R5 COMPLETED BY D. Grnham TELEPHONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 Notes

1. Unit Name:
2. Reporting Period: 8/1/85 - 8/31/85
3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Iteins Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,If Any (Net MWe): NA
10. Reasons For Restrictions,if Any: NA This Month Yr to-Date Cumulative
11. Hours In Reporting Period 744 5831 74255
12. Number Of Hours Reactor Was Critical 164.1 1772.4 47688.1
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On.Line 89.3 1695.8 46613.6
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 10Ad7A 2n3nA44 Inan99s34 -
17. Gross Electrical Energy Generated (MWH) 19377 _

1034016 35761233

18. Net Electrical Energy Generated (MWH) 15148 969878 33965889
19. Unit Service Factor 12.0% 29.1 % 62.8 %
20. Unit Availability Factor 17.0 % 29.1 % 62.8 %
21. Unit Capacity Factor (Using MDC Net) 2.5% 20.3 % 57.5 %
22. Unit Capacity Factor (Using DER Net) 2.5% 20.2% 55.4 %
23. Unit Forced Outage Rate 67.9 % 10.0% 19.8%
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

None

- i

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
26. Units in Test Status (Prior to Commercial Operation): Forecast Achicked' INITIAL CRITICALITY 1/14/77 .

V = INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/77 ,

8509180094 850831 PDR R ADOCK 05000302 PDR (9/77)

\\\

I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT P LC R P-3 DATE 9/3/85 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH Ausrust 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Net) g 0 g7 0 0 ,g 0 2

3 19 0 4 0 20 13 0 p 5 2, 6 n 22 0 0 0 7 23 8 0 0 24 0

9 25 0 10 0 26 0 0 0 II 27 0 52 12 28 13 0 29 151 14 0 182 30 15 0 230

_ 31 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

  • (9/77)

q O O O s*

DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS F I,C R P-3 UNIT NAME ,

DATE 9/4/85 COMPLETED BY R A Rtownet REPORT MONTH 8/85 (904) 795-3802 TELEPHONE 2 a jg "h *Y3 Licensee ,E g , Cause & Corrective No. Date g 3g $ ,3 s 5 Event g'ir ""'"

H yE 5 Report # mO ES Present Recurrence jg g 6

85-09 850308 S 459.1 C 4 NA NA NA Refueling Outage.

85-10 850820 F 9.3 A 3 NCOR 85-174 IlJ PIPEXX Steam leak in IIP turbine drain line.

85-11 850820 F 7.3 II 3 NCOR 85-175 IA INSTRU Reactor trip on high RCS pressure.

85-12 850821 F 72.7 A 5 NA IIJ PIPEXX Steam leak in IIP turbine drain line.

85-13 850828 S 3.4 B 5 NA ZZ ZZZZZZ Eeduced power for turbine testing.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Exsmination F-Administrative 5 G-Operational Error (Explain) Exhibit I- Same Source (9/77) iI-Other (Explain)

m e s MONTHLY OPERATIONAL

SUMMARY

STATEMENT O DOCKET NO. 50-302 UNIT FLCR P-3 DATE 9/4/85 COMPLETED BY S. A. Stewart TELEPHONE (901) 795-3 R02 MONTH August 1985

SUMMARY

STATEMENT: Crystal River 3 ended its fifth refueling outage on Aui;ust 20 at 0309.

After startup, the high pressure turbine experienced two steam leaks in the same drain line. The reactor tripped automatically, once on high RCS pressure and once as an anticipatory trip following the first high pressure steam leak. During startup the plant reduced power to conduct turbine testing.

O O .

l, I

-m ,3 , ___. ._. _-,.,, _ , _ _ _ , _ _ _ _ _ , - . _ , _ . . , . , . , _ . _ . , - , . , _ , _ , , , _ , ., . , _ . , _ _ _ , - , -

I ese' g* 00 %*

llC o g:;O .  :

e

.e.

Power C ORPO R ATION September 10,1985 3F0985-07 Mr. James M. Taylor, Director Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20535

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 August 1985 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, /

/ /

/

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc: Dr. 3. Nelson Grace Regional Administrator, Region 11 Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 4

o riI GEN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151