Monthly Operating Rept for Aug 1984
ML20097B776
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/1984
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0984-02, 3F984-2, NUDOCS 8409140142
Download: ML20097B776 (5)


Text

_

e.: -

.m OPERATING DATA REPORT

~

DOCKET NO. 50-302 DATE 9/4/84 COMPLETED BY D. Graham TELEPHONE rann vo;-1802 OPERATING STATUS

l. Unit Name:

Crystal River Unit 3 Notes 8/1/84 - 8/31/84

2. Reporting Period:
3. Licensed Thermal Power (MWt):

2544

4. Nameplate Rating (Gross MWe):

890 825

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

RGO

7. Maxinmm Dependable Capacity (Net MWe):

821

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Giw Reasons:

N/A

9. Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any:

N/A This Month Yr.-to-Date Cumulative i1. Hours In Reporting Period 744 5855 65495

12. Number Of Hours Reactor Was Critical 744 5540 43109.2
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On.Line 744 5498.3 42117.3
15. Unit Reserve Shutdown Hours 0

0 0

16. Gmss Thermal Energy Generated (MWH) 1772846 13209697 95174032
17. Gross Electrical Energy Generated (MWH) 605154_ _,

4553684 32480420

18. Net Electrical Energy Generated (MWH) 576490 4341045 30858128
19. Unit Service Factor 100 %

93.9 %

64.3 %

20. Unit Availability Factor 100a6 93.9 %

64.3 %

21. Unit Capacity Factor (Using MDC Net) 94.4 %

90.3 %

59.4 %

22. Unit Capacity Factor (Using DER Net) 93.9 %

89.9%

57.1 %

23. Unit Forced Outage Rate 0.0%

1.9%

21.3 %

24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each t:

Refueling outage scheduled to begin March 9,1985 and last 20 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved I

INITIA L CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 j

COMMERCIAL OPERATION 3/13/77 8409140142 840831 Id kel (9/77)

PDR ADOCK 05000302 I

R PDR

.s AVERAGE DAILY UNIT POWER LEVEL o

4 50-302 DOCKET NO.

UNIT FLCRP-3 9/4/04 DATE COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONDI August 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 812 37 694 2

808 I8 572 3

800 g9 588 4

796 20 754 5

780 21 807 713 6

22 803 7

794 23 Rns 8

786 24 799 793 9

25 796 10 801 26 802 11 786 27 791 12 788 28 791 13 811 29 798 14 795 30 807 I5 792 31 773 16 785 INSTRUCTIONS On this format. list the average daily unit power leselin MWe Net for each day in the reportinginonth. Compute to the nearest whole rnegawatt.

(9/77)

(

7 DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS F LC RP-3 UNIT NAME DATE 9/5/84 COMPLETED BY S A. Stewart REPORT MONTH 8/84 TELEPHONE (90.1) vos ' tan 9 w.

E c

jg 3

$ $ "4 Licensee

[g

{3 t

Cause & Corrective No.

D ate c--

52 i;

jE$

Event s?

c.

Action to Report #

E0 hU Present Recurrence 5d=g S

j@

u e.

C 84-28 8/17/84 S

0.0 B

5 N/A IIC IITEXCII Reduced power to clean condenser waterboxes and repair leaking condenser tube.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G-instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data 11 Maintenance ol Test 2 Manual Scram.

Entry Sheets for Licens-e

c. Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D. Regulatory Restriction 4-Other (Explain) 0161)

I. Operator Training & License Examination I:-Administ ratise 5

G-Operational Es ror (Explain)

Eshibit 1 Same Source N/77)

Il-Other (E splain) 9

MONTHLY OPERATI0ttAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT F LC RP-3 DATE 9/5/84 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH August 1984

SUMMARY

STATEMENT:

The plant remained on-line the entire month. Power was reduced once to clean the condenser waterboxes and repair a leaking condenser tube. Plant power output was reduced approximately 4%

during the month due to high OTSG levels caused by fouling.

i 4

i l

l 1

l i

o*]* h?

uenn$?a*

kh Y@o,$fOv&?

wo o o *o M

.P.o..w..er September 7,1984 3F0984-02 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-332 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 August 1984 Monthly Operating Report.

This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, e

i G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc:

Mr. 3. P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 4'\\

GEN ERAL OFFICE 3201 Thirty-fourth street south e P.O. Box 14042, st. Petersburg, Florida 33733 e 813-866-5151