MONTHYEAR3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With 3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With ML20210U5341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Crystal River,Unit 3 3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With ML20210U5411999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 ML20210U5601999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With ML20210U5631999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With 3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With 3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With 3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With 3F1298-13, Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With 3F1198-05, Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With 3F1098-06, Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With 3F0998-07, Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With 3F0898-02, Monthly Operating Rept for Jul 1998 for Crystal River,Unit 11998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Crystal River,Unit 1 3F0798-01, Monthly Operating Rept for June 1998 for Crystal River Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Crystal River Unit 3 3F0698-02, Monthly Operating Rept for May 1998 for Crystal River Unit 31998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Crystal River Unit 3 3F0598-07, Monthly Operating Rept for Apr 1998 for Crystal River Unit 31998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Crystal River Unit 3 3F0498-07, Monthly Operating Rept for Mar 1998 for Crystal River,Unit 31998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Crystal River,Unit 3 3F0398-05, Monthly Operating Rept for Feb 1998 for Crystal River, Unit 31998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Crystal River, Unit 3 3F0298-06, Monthly Operating Rept for Jan 1998 for Crystal River,Unit 31998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Crystal River,Unit 3 3F0198-05, Monthly Operating Rept for Dec 1997 for Crystal River,Unit 31997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Crystal River,Unit 3 3F1297-02, Monthly Operating Rept for Nov 1997 for Crystal River,Unit 31997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Crystal River,Unit 3 3F1197-02, Monthly Operating Rept for Oct 1997 for Crystal River, Unit 31997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Crystal River, Unit 3 3F1097-03, Monthly Operating Rept for Sept 1997 for Crystal River,Unit 31997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Crystal River,Unit 3 3F0997-08, Monthly Operating Rept for Aug 1997 for Crystal River1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Crystal River 3F0897-04, Monthly Operating Rept for Jul 1997 for Crystal River Unit 31997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Crystal River Unit 3 3F0797-01, Monthly Operating Rept for June 1997 for Crystal River Unit 31997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Crystal River Unit 3 3F0697-01, Monthly Operating Rept for May 1997 for Crystal River 31997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Crystal River 3 3F0597-02, Monthly Operating Rept for Apr 1997 for Crystal River Unit 31997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Crystal River Unit 3 3F0497-01, Monthly Operating Rept for Mar 1997 for Crystal River Unit 31997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Crystal River Unit 3 3F0397-07, Monthly Operating Rept for Feb 1997 for Crystal River Unit 31997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Crystal River Unit 3 3F0297-08, Monthly Operating Rept for Jan 1997 for Crystal River Unit 31997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Crystal River Unit 3 3F0197-08, Monthly Operating Rept for Dec 1996 for Crystal River Unit 31996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Crystal River Unit 3 3F1296-03, Monthly Operating Rept for Nov 1996 for Crystal River Unit 31996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Crystal River Unit 3 3F1196-08, Monthly Operating Rept for Oct 1996 for Crngp1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Crngp 3F1096-03, Monthly Operating Rept for Sept 1996 for Crystal River Unit 31996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Crystal River Unit 3 ML20117N5101996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Crystal River Unit 3 3F0896-01, Monthly Operating Rept for Jul 1996 for Crystal River Unit 31996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Crystal River Unit 3 3F0796-01, Monthly Operating Rept for June 1996 for Crystal River Unit 31996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Crystal River Unit 3 3F0696-02, Monthly Operating Rept for May 1996 for Crystal River Unit 31996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Crystal River Unit 3 3F0596-08, Monthly Operating Rept for Apr 1996 for Crystal River Unit 31996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Crystal River Unit 3 3F0496-12, Monthly Operating Rept for Mar 1996 for Crystal River,Unit 31996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Crystal River,Unit 3 3F0396-06, Monthly Operating Rept for Feb 1996 for Crystal River Unit 31996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Crystal River Unit 3 3F0296-14, Monthly Operating Rept for Jan 1996 for Crystal River Unit 31996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Crystal River Unit 3 3F0196-05, Monthly Operating Rept for Dec 1995 for Crystal River Unit 31995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Crystal River Unit 3 3F1295-02, Monthly Operating Rept for Nov 1995 for Crystal River Unit 31995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Crystal River Unit 3 3F1195-02, Monthly Operating Rept for Oct 1995 for Crystal River Unit 31995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Crystal River Unit 3 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G0191999-10-15015 October 1999 Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair 3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated1999-10-13013 October 1999 Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated ML20217B0931999-10-0606 October 1999 Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue ML20212L0881999-10-0404 October 1999 SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3 ML20212J8631999-10-0101 October 1999 Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i) ML20212E9031999-09-30030 September 1999 FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999 3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With ML20212E6911999-09-21021 September 1999 Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20211L1321999-08-31031 August 1999 EAL Basis Document 3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With ML20212C1501999-08-31031 August 1999 Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239 ML20211B7291999-08-16016 August 1999 Rev 2 to Cycle 11 Colr ML20210P1111999-08-0505 August 1999 SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3 ML20210U5341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Crystal River,Unit 3 ML20209F5601999-07-31031 July 1999 EAL Basis Document, for Jul 1999 3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With ML20210U5411999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With ML20210U5601999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 ML20195C6271999-05-28028 May 1999 Non-proprietary Rev 0 to Addendum to Topical Rept BAW-2346P, CR-3 Plant Specific MSLB Leak Rates ML20196L2031999-05-19019 May 1999 Non-proprietary Rev 0 to BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs 3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With ML20210U5631999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With ML20204D9661999-03-31031 March 1999 Non-proprietary Rev 1,Addendum a to BAW-2342, OTSG Repair Roll Qualification Rept 3F0399-04, Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease1999-03-10010 March 1999 Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease 3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With ML20203A4381999-02-0303 February 1999 Safety Evaluation Supporting EAL Changes for License DPR-72, Per 10CFR50.47(b)(4) & App E to 10CFR50 ML20206E9891998-12-31031 December 1998 Kissimmee Utility Authority 1998 Annual Rept ML20206E9021998-12-31031 December 1998 Florida Progress Corp 1998 Annual Rept ML20206E9701998-12-31031 December 1998 Ouc 1998 Annual Rept. with Financial Statements from Seminole Electric Cooperative,Inc 3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With ML20206E9261998-12-31031 December 1998 Gainesville Regional Utilities 1998 Annual Rept 3F1298-13, Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With 3F1198-05, Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With ML20155F4071998-10-31031 October 1998 Rev 2 to Pressure/Temp Limits Rept ML20155J2701998-10-28028 October 1998 Second Ten-Year Insp Interval Closeout Summary Rept 3F1098-06, Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With ML20206E9461998-09-30030 September 1998 Utilities Commission City of New Smyrna Beach,Fl Comprehensive Annual Financial Rept Sept 30,1998 & 1997 ML20206E9561998-09-30030 September 1998 City of Ocala Comprehensive Annual Financial Rept for Yr Ended 980930 ML20206E9101998-09-30030 September 1998 City of Bushnell Fl Comprehensive Annual Financial Rept for Fiscal Yr Ended 980930 ML20206E9811998-09-30030 September 1998 City of Tallahassee,Fl Comprehensive Annual Financial Rept for Yr Ended 980930 ML20195E3121998-09-30030 September 1998 Comprehensive Annual Financial Rept for City of Leesburg,Fl Fiscal Yr Ended 980930 3F0998-07, Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With ML20236W6501998-07-31031 July 1998 Emergency Action Level Basis Document 3F0898-02, Monthly Operating Rept for Jul 1998 for Crystal River,Unit 11998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Crystal River,Unit 1 ML20236V8801998-07-30030 July 1998 Control Room Habitability Rept 3F0798-01, Monthly Operating Rept for June 1998 for Crystal River Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Crystal River Unit 3 ML20236Q4611998-06-30030 June 1998 SER for Crystal River Power Station,Unit 3,individual Plant Exam (Ipe).Concludes That Plant IPE Complete Re Info Requested by GL 88-20 & IPE Results Reasonable Given Plant Design,Operation & History 3F0698-02, Monthly Operating Rept for May 1998 for Crystal River Unit 31998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Crystal River Unit 3 1999-09-30
[Table view] |
Text
- _ _ _ _ - _ _ _ _ _ - _ _ _ . _ _ - _ _ _ -_ ._ _ - _- _ -
l t.
1 OPERATING DATA REPORT DOCKET NO. '50-302 DATE R/1/87 COMPLETED BY n Craham TELEPHONE (901)7n8-1R02 OPER.ATING STATUS
- 1. Unit Name: Crystal River Unit-3 Notes
- 2. Reporting Period: 7/1/87 - 7/31/87
- 3. Licensed Thermal Power (MWt): 2544
- 4. Nameplate Rating (Gross MWe): R90
- 5. Design Electrical Rating (Net MWe): 825 '
- 6. Maximum Dependable Capacity (Gross MWe): 860
- 7. Maximum Dependable Capacity (Net MWe): R?l
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
NA
- 9. Power Level To Which Restricted,If Any (Net MWe): 516
- 10. Reasons For Restrictions,1f Any: Plant Power level is restricted due to three RFactor Coolant Pumo ooeration and "A" 0TSG hiah level limits.
This Month Yr. to.Date Cumulative 11.- Hours In Reporting Period _ 744 5087 91031
- 12. Number Of Hours Reactor Was Critical 688.9 4528.9 58521.3
- 13. Reactor Reserve Shutdown Hours 0 0 1280.3
- 14. Hours Generator On-Line 642.4 4477.4 57229.5
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1i1 A9714 9877927 128481864
- 17. Gross Electrical Energy Generated (MWH) 34R171 _. 3406875 43962086
- 18. Net Electrical Energy Generated (MWH) 327384 3232948 41745746
- 19. Unit Service Factor 86.3% 88.0% 62.9%
- 20. Unit Availability Factor 86.3% 88.0% 62.9%
- 21. _ Unit Capacity Factor (Using MDC Net) 53.6% 77.4% 57.3%
- 22. Unit Capacity Factor (Using DER Net) 53.3% 77.0% 55.6%
- 23. Unit Forced Outage Rate 13.7% 12.0 23.2 ;
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): i Rafueling outage scheduled to begin 9/19/87 and last .
12 weeks.
{
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 1/1a/77 INITIA L ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77
%[$00$ $ OO R
2 hN( j
?
_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ - - _ _ _ ___ _J
AVER AGE DAILY UNIT POWER LEVEL '-
- D f
DOCKET NO. 50-302 UNIT FLCRP-3 DATE 0/4/07 COMPLETED BY D. Graham TELEPHONE .L904-795-3802)
MONm 7/87 DAY AVER AGE DAILY POWER LEVEL DAY ' AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) .:
1 i 773 17 515 '
2 321 is 514 ,
3 0 39 _
517 4 0 20 517 5 1 51 2 515 6 517 22 516 7 513 23 516 g 492 24 514 9 390 25 509-10 126 26 510 i 268 27 510 12 490 28 503 13 496 ,9 503 14 496 30 498 15' 494 3: 509 16 511 INSTRUCTIONS On this format. list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/771 4
_--___-__--___-_-__________-__-_--___--_.--__--____.-__A
O 2 0PR 3
7s5 o3 t -
9 f" acr oerl d hBpn eae eo"u r "Csu i deg prn e
3 R/ 7 et eu l f em s e nt anF si i
- C4a) r Mr i h url oa e 0L/ 4 uoD s hft peu 5FRR0 9
l tR si i Ca wo netf h o iDiRc t
cfL e e ru o f v c n
ar we r rt oh r t rL o
i f e eu s non f(
wos t uw O.EEYE tc e or e
r ao" w "Aolr u f o I is r MTBN o l d ta r te r l r t u p ti peansf e
N AA D O on ce o eia eeai Gah TNDEH CoiR t gh cf d rs r t pSR E T P &t c nt a i e KT EI E eAn t
ei pf eh ctt eet d ro b r yt ipr n1 CN L P E L s u
e s
uyeao u fl wa h
x ro tn O
D U a e dl l c .
dh aior EfEE0 MT C P r pi p ph A s o en eth aP e O risf n C i uw ui w eyeg .e 4 rs at t t s .c a a gh l c run g ntl i m reb ee i ph t gi av a ot ntf cr e t rl ot s i aoie t cea e nr t s s avt sd v neer enian n upnaf y Ri vwa i R oOpo b S
N X m O A X a I
T . R P r
- c C c$ ,pU M E sr U g N U D E P g1Sne E G R 7 d u 8 o "nt R / h
- u E 7 e, g,o B t ggAC C C e ,[3 W [gm E M O
O P D
N A
H T
N 3
S O e # 9 N M e tnr s t
- A W T n e o /
R e v p N O ic Ee 7 8
D O L R T P U E H R S
T I
"t = 35 g5 c N Ys)j )
n U ;
3 5 ia
$s. j lp I* x E
(t 34$ A A e es rT u
lf iao 4 F e 0 t c gg= 6 0 nn g ea 5,3f 7 mn el pt el
- ninu o uif s qa e
,gH F F aEMR e - -
RABCD 2
te 2 a 5 D 0 7
0 d 7 e 0 0 7 7 dlu 8 8 ed O r ce o hc 0 1 FS 1 1
- o. : :
N / / FS 7 7 8 8 I
'r().
2 3
0 P R t9 7 t5
&8 - d nea ahl t nl i a v
yf a-o Pi n
o e
U N
(
3 R/ 7 t u k l eCt s a si el
- Ca ) t g af esRc one ee ru n nt nF 0L/a4 oa e 5 FR 0 oor l i f" u tiDiR c I
<9 h l d Bf c fL
( e v
e c see ae er" u r o rLE i
n ed g R l e ;
ts nf( o t
t e l oa r( i wre .
OMTBN EEYE Ino t
e b mt i6 aoosd is r N AA r
r tonu u l a1 f pf ue - ta e t
ep DO on c oco p - f s Gah r
T NDEH Coi Re riv eV ans s i pSR E tt rWF erd a t
e K T ET EP &tct ar nponp br yt ipr n1 I
CN L L eAn e s omo o eot a n
h x o tn r
O U PE u a
v e
t ot t o wnnyi i t EfEE0 D MT C P r
rur t a r
t aoau O eae eg p ml c C w n wn i n er 4 oee oi rirri ph g pd t e c t - a d wd d e de reoe f ern cii el c
ot pc tl a o
uab ue c u pl t d pr d n asmp s eeu ei eeue R r pR e
R rt Rl t S
N m O U X X a I
R X Y rm T
C U cf.{g T S
N E
P I
A L
E ca Sr D I P R glSne
, a E 7 , uo R d 8 o , nt n R / h , auo E 7 t gMAC W @,gOm A H
H H
A I
M e _
,234 O
s P D 3 H
r'U N A
T N 1 1
O S e #
M e N s tnr t -
W T n eo A A e v p / / 7 O R ic Ee N H 8 D O L R T P U E H R S
TI bhE 6 N Ys
)
$ 2p 5 5 3 n U ia lp x
E (t
s 3 i5s A A A e r e luT f iao F e 2 t c ggI 0 0 . nn 5 ea 3Ef 0 0 2 mnn
- pt el ela ninu o qa uif g s e
,gH S F F aEMR e - - -
RABCD
_ 2 8
te 0 9 0 D
a 7 0
0 7
1 7 d
_ 7 0 0 8 7 7 d leu 8 8 ed
_ rce h o c pU
_ 2 4 F S
. 1 3 1 o - 1 -
FS N 7 - 7 8 7 8 t 8
l l,
1, J"-
MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302-V , UNIT FLCRP-3 DATE ' 8/4/87
~
l '
COMPLETED BY S.A. Stewart, l' TELEPHONE -(904)795-3802' i
MONTH July, 1987
SUMMARY
STATEMENT:
1 Crystal River Unit 3 experienced two automatic reactor trips during .
the month.. During the remainder of the month the plant operated at-approximately 64. percent of full power due to three Reactor Coolant ' ,
Pump operation and steam generator (OTSG) Flow fouling. During July, CR-3 extended it!s performance ~ record by operating continuously for 160 days straight.
O e
t__ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
A F*rn.
[ule - yk
!;L e e;It d Q[c, f 3 ,l:.
%f.q], t }f
.c. 4 (, , s, a
Florida Power C o R P o H AT iO N August 7, 1987 3F0887-06 ;
Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached is the Crystal River Unit 3 July 1987 Monthly Operating Report. This report is submitted in accordance with Technical Specification 0.9.1.6.
Sincerely, E.C. Simpson, Director Nuclear Operations Site Support DVH/dhd xc: Dr. J. Nelson Grace Regional Administrator, Region II l
Mr. T.F. Stetka j Senior Resident Inspector j f,0 Post Of fice Box 219
- Telephone (904) 795 3802 A Florida Progress Company 'I
.