3F0785-10, Monthly Operating Rept for June 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1985
ML20129G821
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/30/1985
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0785-10, 3F785-10, NUDOCS 8507180289
Download: ML20129G821 (5)


Text

.

OPERATING DATA REPORT DOCKET NO. 50-302 DATE 7/1/85 COMPLETED BY T) Grnhnm TELEPHONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 Notes

1. Unit Name:
2. Reporting Period:

6/1/85 - 6/30/85

3. Licensed Thermal Power (MWt):

2544 890

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

825

6. Maximum Dependable Capacity (Gross MWe):

860 821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted,if A'nv (Net MWe):

NA A

10. Reasons For Restrictions. If Any:

I This Month Yr..to.Date Cumulative 720 4343 72767

11. Hours In Reporting Period
12. Number Of Hours Resetor Was Critical 0

1608.3 47524

13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On.Line 0

1806.5 46594.3

15. Unit Reserve Shutdown Hours 0

0 0

l

16. Gross Thermal Energy Generated (MWH) 0 2924173 104586058 l
17. Gross Electrical Energy Generated (MWH) 0 1014639 35741856
18. Net Electrical Energy Generated (MWH) 0 954730 33950741
19. Unit Service Factor 0%

37.0 %

63.9 %

20. Unit Availability Factor 0%

37.0%

63.9 %

21. Unit Capacity Factor (Using MDC Net) 0%

26.8 %

5R.7%

22. Unit Capacity Factor (Using DER Net) 0%

26.6 %

56.6 %

l

23. Unit Forced Outage Rate 0%

0%

19.6%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):

Refueling outage which began 3/9/85 and is scheduled to last 20 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

July 27.1985

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed l

l INITIAL CRITICALITY 1/14/77

)

INITIA L ELECTRICITY 1/30/77 l-COMMERCIAL OPERATION 9 /19 /a?

A ADOCKOSOOg2 fp B507180289 850630 gof77 3 PDR R

\\ g j

L

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT PLCRP-3 DATE 7/1/95 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONDI June 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net) t MWe-Neti I

17 0

2 gg 3

19 4

20 l

5 y,

e 6

l 3

23 8

24 C

f 25 i

10 26 II 27 12

,g i

13 39 l

i 30 b

15 3y 1

16 si, INSTRUCTIONS he a ge daih unit poua lesel in \\We. Net for each day in the reporting inonth. Compute to he nearest whol i

pil77 )

W 4

DOCKE T NO. 50-302 UNil SilUIDOWNS AND POWER REDUCilONS F LC RP-3 UNII N AME DATE 7/2/85 COMPLETED ny S. Stewnri REPORI MONill G/85 TELEPHONE (904) 795-3 Ro?

c 3

Iicernee E *t, Q

fatise d forrettive D.it e c.

32 4

5E$

I ent

i '2 o2 Action to

~

S Mdg Repori*r efi0

!0 Present Recurrence v

O 85-07 850308 S

720 C

4 NA NA NA Refueling outage continues.

I 2

3 4

l': l'orceti Reason:

Methml:

Exhibit G - Inst ructions S: Sc heduled A l quipment l'ailure li'.xplain) 1 -Manual for Preparation of Data li-Maintenance of Test 2-Manual Scram.

Entry Sheets for I.icensee C-Refueling 3-Automatic Scram.

I vent Report (LI:R) File INURI G.

D-Regulatory Restriction 4-Ot her I Explain) 01611 E-Operator Training & License 1 xamination F. Administ rative 5

G Operational 1:eror (I xplain)

I shibit I Same Sourte 19/77)

Il-Ot her ( E xplain)

r MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 7/2/85 COMPLETED BY S. Stewart TELEPHONE (904) 795-3802 MONTH June 1985

SUMMARY

STATEMENT:

Crystal River 3 remains off-line for refueling and maintenance.

1 l

Ih $,?

j?

o C0*

6 f

.b.'.

o Power CORPORATION July 8,1985 3F0785-10 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 June 1985 Monthly Operating Report.

These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, j

o G. R. Westafer

/

Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc:

Dr. 3. Nelson Grace Regional Administrator, Region 11 Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323

[$ Y GEN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151 I