3F0784-05, Monthly Operating Rept for June 1984

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1984
ML20093D236
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/30/1984
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0784-05, 3F784-5, NUDOCS 8407160182
Download: ML20093D236 (5)


Text

- _ _ _ _ . . _ _ - . . _ _ _ _ _ . __ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ __________ _____ __

OPERATING DATA REPORT DOCKET NO. 50-302 DATE 7/3/84 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 Notes

1. Unit Name:
2. Reporting Period: 6/1/84 - 6/30/84
3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860 821
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To which Restricted,If Any (Net MWe): N/A-
10. Reasons For Restrictions,If Any: N/A This Month Yr..to.Date Cumulative )

I1. Hours In Reporting Period 7 '> n 4'16 7 64007

12. Number Of Hours Reactor Was Critical 720 4061.1 41630.3
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On.Line 720 _

4022.6 40641.6

15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1745267 9650175 91614510
17. Gross Electrical Energy Generated (MWH) 595526 3337607 31264343
18. Net Electrical Energy Generated (MWH) 567690 3181773 29698856
19. Unit Service Factor 100% 92.1% 63.5%
20. Unit Availability Factor 100% 92.1% 63.5%
21. Unit Capacity Factor (Using MDC Net) 96.0% 88.7% 58.6%
22. Unit Capacity Factor (Using DER Net) 95.6% 88.3% 56.2%
23. Unit Forced Outage Rate 0% 2.6% 21.9%
24. Shutdowns Scheduled Oser Next 6 Months tType. Date.and Duration of Each):

None  !

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY 1/14/77 1 INITI AL ELECTRICITY 1/30/77 3/13/77 hD I COMMERCIAL OPER ATION Ig I

, k 8407160182 840630 IN PDR ADOCK 05000302 R PDR _ _ _ _ _ _ _ _ _ _ .

~

AVERAGE DAILY UNIT POWER LEVEL '

DOCKET NO. 50-302 UNIT FLCRP-3 DATE 7/3/84 COMPLETED BY D. Graharn TELEPHONE (904) 795-3802 MONTH June 1984 DAY A'.'ERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe. Net)

I 820 37 831 2 803 gg 825 3 19 833 4 797 20 812 5 803 21 810 6

790 nin 22 7 791 23 818 8 799 24 813 9 538 Rin 25 10 611 26 813 1I 825 27 - - - _

801 12 824 ,3 789 13 R11 29 770 14 828 30 578 15 824 3y 16 R??

INSTRUCTIONS On this format, list the average daily unit power leselin MWe Net for each day in the reporting month. Compute io the nearest whole megawatt.

(9/77 )

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-302 UNIT NAME rim t DATE 7l't/nA COMPLETED BY S'A' . . Stewart REPORT MONTH 6/84 TELEPHONE (904) 795-3802

= ce iw= -

5 c a'1,

,sa gg Cause & Corrective

-, .1 e Licensee ,,

No. D.it e 5? 4 i~$ Event  :;; ? 8.~$ Action to i 'E 0

$E 5 3 e 5 :g Report : $'

u Present Recurrence c

84-24 840608 S 0 B 5 N/A HC HTEXCH Reduced power to clean waterboxes.

84-25 840629 S 0 B 5 N/A HC HTEXCH Reduced power to clean waterboxes.

3 4 1 2 Reason: Method: Exhibit G - Instructions F: Forced for Preparation of Data S: Scheduled A. Equipment Failure (Explain) 1-Manual 2 Manual Scram. Entry Sheets for Licensee B-Maintenance of Test 3-Automatic Scram. Esent Reporn (LER) File tNUREG-C-Refueling D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination 5

F-Administ rative G-Operational Eiror (Explain) Eshibit I Same Source (9/77) Il-Other ( Explain)

I .

=, .

~

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP_'t DATE 7/3/84 COMPLETED BY S.A. Stewart  ;

TELEPHONE (905) 795-3802 MONTH June 1984

SUMMARY

STATEMENT: The plant remained on-line the entire month of June. Condenser Delta-T limitations restricted power for part of the month. The i plant reduced power twice for condenser waterbox cleaning.

P 4

e i

n 1

oeoo

)

  • 6DCT N O*

d k$

  • 2*26*

Florida Po. o . .e. n -wr

,n July 9,1984 3F0784-05 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 }

Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 June 1984 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

, M ? P/

G. R. Westafer Manager, Nuclear Operations  ;

Licensing and Fuel Management l DVH/feb Attachments cc: Mr. 3. P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 M\

GEN ERAL OFFICE 3201 Thirty-fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866 5151

_ _ _ _ _