e p t s,,
afhD 9 0 *w g
- D Ol,kf$) 05 00 E3s jf5
- ngh n gfp
- r. e
- a Florida Power stal N
- 3 Dodet No. sodo!
May 12, 1992 3f0592-08 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Monthly Operating Report
Dear Sir:
Attached is the Crystal River Unit-3 April 1992 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, G. L.
oldt Vice President Nuclear Production GLB:JBC/ff Attachment xc: Regionti Administrator, Region II Senior Resident Inspector NRR Project Manager 1
9205190076 920430 DR ADOCK 0300 R
A Florida Progress Company
\\
e OPERATING DATA REPORT DOCKET NO.
50 302 UNIT FLCRP-3 DA1E May 01,1992 COMPLETED BY J. A. Binkowski TELEPHONE (904)563 44B5 OPERATING STATUS
- 1. UNIT N AME:...
.......,............ CRY ST AL RIVER UNI 3
- 2. REPORTING PERIOD:...
.................. APRIL 1-30,1992
- 3. LICENSED THERMAL POWER (MWt):.
2544
- 4. N AMEPLATE RATING (GROSS MWe):.................. 890
- 6. DESIGN ELECTRICAL RATING (NET MWe):...
825
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. _800 7, MAXIMUM DEPENDA0LE CAPACITY (NET MWe):..... 821 B. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER J THROUGH 7) $1NCE LAST REPORT. OtVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRIC1ED, IF ANY (NET MWe):
N/A
- 10. REASONS FOR RESTRICTIONS,IF ANY:
N/A THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 719.0 2.903.0, 132,671.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 007.9 2.065.1 BG.521.1 -
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.280.6 -
- 14. HRS GENERATOR ON LINE 607.9 2.085.0 84.832.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0,
- 16. GROSS THERMAL ENERGY GINERATED (MWH) 1.336.026 6.527.514 192,662,161
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 451.409 2.246,448_.
_ 65.869.345
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 435.721 2.148.178 62.579.917
- 19. UNIT SERVICE FACTOR B4.5%
92.5 %
63 9 %
- 20. UNIT AVAILABLE FACTOR 64.5 %
92.5 %
63.9 %
21 UNIT CAPACITY FACTOR (using MDC net) 73.8 %
90.1 %
58.5 %
22 UNIT CAPACITY FACTOR (using DER not) 73.5 %
89.7%
57.2%
- 23. UNIT FORCED OUTAGE RATE 12.6%
6.8%
19.1 %
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refuel 8 began on 4/30/92; duration of 60 days.
- 25.. IF SHUTDOWN AT END OF REPORT PERIOD. E STIMATED DATE OF ST AR1UP.
N/A
- 28. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
THIS ITEM IS NOT APPLICA0LE TO CR-3 FORECAST ACHIEVED INITIAL CRITICAUTY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA I
l
o.
e AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT l'LCRP-3 DATE fAay 01,1992 COMPLETED BY J. A. Dinkowski TELEPHONE (904)563-4485 MONTH APRIL I-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DALLY POWER LEVEL (MWo-Net)
(MWe-Net) 1 -
0-17 850 2
'O' 18 849 3
-0 19 836 4
23 20 751 5_
606 21 709 6
-859' 22 850 7
855-23 540 8
858~
24 538 9
853-25 523 10 843 26 522 11 815 27 510-12 851 28 502 g
13 852 29 452 14 851-30 6
15
-842 18 849:
INSTRUCTIONS:
'On this format. list the dally average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
UNTT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
$0.-302 UNET FM DATE way 01.1se2 l
REPORT MONTH. APRIL COMPLETTD B*
J A Bs,Armou l
THIEPHONE 4'904) M5
[
f NO.
DATE TYPE (1)
DURATION REASON (2)
METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTME SHtJTTING EVENT CODE (4)
CODE (5)
ACTION TO PREVENT I
RECURRENCE HOURS l
DOWN REACTOR (3) REPORT #
f 4
92-0001 EA TRANSF.
CedNarron of Mar *,h outage _
i l
92-09 920401~
F 88.9 A
l l
5 fCA HC HTEXCH Reduced pow to 85% toinsta'i Bend l
920420 S~
61.7 B
Flanges on *B* wa'erbox in preparation f
92-10 for retubing
- A* waterbox.
92 920422 S
1800 B
5 N/A HH PUMPXX Condensate Pump 1 A (CDP-1 A) was taken out of service due to de' active l
controner.
i Start of Refue ats Outage Vt:L f
r I
' 22.3 '
C 1
N/A ZZ ZZZZZZ f
92-12 920430 S
I l
I i
l f
f 1
i l
l l
5 f
4 3
EXM8'T Y Sa*8E SOM 2
E2MrBrfG-m5T-N Y
1 95ETN00 F08t P54EPARAT30'e OF CATA REA9)N 1 eamNumt E86TRY 5METTS FOR UCDeSEE F: FORCED A 4 0UraturTFAEUAE 2~asANuat 9CAAAf FVEwf REPORT lL.E51FLE 8-SCHEDULED s-asAtNTEM*MOE OR TEST S. AUTO 9CRAas (98UfEG.St99 CJEFUELPs a.COsdT1NUED DJEGL~JT0fW FESTMCTION SJEDUtTD LOAD EMMATM TSWNSWO &
S.OTHEM LICEMSE ADaswetSTRA110N F e seP3TRATFJed G-CPE%ATIONAL EFWOR (EXW M oTHE9
-~-Me mum l ll
ec t..
1.-
MONTliLY OPERATIONAL
SUMMARY
STATEMENT DOCKET Mo.
50-302 uNrr FLCRP-3 DAlli M,4adi,1992 COsAPLETY D BY J. A. Blnkowski TELEfHoNF.
L964)S63-4485 MONTH: APRIL c
SUMMARY
STATEMENT:
Breaker closure at 1653 on April 4 ended the March outage.
Full power was reached by 2400 on April 5,1992. On April 20 at 0000, a power
. reduction to_85% full power began in order to take "B" waterbox off-line in
. preparation for Refuel 8 condenser retubing of waterbox " A". The plant ran at
- 85% power until the " A" Condensate Pump Controller failed causing the loss of the." A" Condensate Pump and limiting power to 65% until shutdown for Refuel 8 began on April 30.-
_