Monthly Operating Rept for April 1992 for Crystal River
ML20096E148
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/30/1992
From: Binkowski J, Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0592-08, 3F592-8, NUDOCS 9205190076
Download: ML20096E148 (5)


Text

..

e p t s,,

afhD 9 0 *w g

  • D Ol,kf$) 05 00 E3s jf5
  • ngh n gfp
r. e
  • 3 Dodet No. sodo!

May 12, 1992 3f0592-08 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3 April 1992 Monthly Operating Report. This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, G. L.

oldt Vice President Nuclear Production GLB:JBC/ff Attachment xc: Regionti Administrator, Region II Senior Resident Inspector NRR Project Manager 1

9205190076 920430 DR ADOCK 0300 R

A Florida Progress Company

\\

e OPERATING DATA REPORT DOCKET NO.

50 302 UNIT FLCRP-3 DA1E May 01,1992 COMPLETED BY J. A. Binkowski TELEPHONE (904)563 44B5 OPERATING STATUS

1. UNIT N AME:...

.......,............ CRY ST AL RIVER UNI 3

2. REPORTING PERIOD:...

.................. APRIL 1-30,1992

3. LICENSED THERMAL POWER (MWt):.

2544

4. N AMEPLATE RATING (GROSS MWe):.................. 890
6. DESIGN ELECTRICAL RATING (NET MWe):...

825

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. _800 7, MAXIMUM DEPENDA0LE CAPACITY (NET MWe):..... 821 B. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER J THROUGH 7) $1NCE LAST REPORT. OtVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRIC1ED, IF ANY (NET MWe):

N/A

10. REASONS FOR RESTRICTIONS,IF ANY:

N/A THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 719.0 2.903.0, 132,671.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 007.9 2.065.1 BG.521.1 -
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.280.6 -
14. HRS GENERATOR ON LINE 607.9 2.085.0 84.832.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0,
16. GROSS THERMAL ENERGY GINERATED (MWH) 1.336.026 6.527.514 192,662,161
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 451.409 2.246,448_.

_ 65.869.345

18. NET ELECTRICAL ENERGY GENERATED (MWH) 435.721 2.148.178 62.579.917
19. UNIT SERVICE FACTOR B4.5%

92.5 %

63 9 %

20. UNIT AVAILABLE FACTOR 64.5 %

92.5 %

63.9 %

21 UNIT CAPACITY FACTOR (using MDC net) 73.8 %

90.1 %

58.5 %

22 UNIT CAPACITY FACTOR (using DER not) 73.5 %

89.7%

57.2%

23. UNIT FORCED OUTAGE RATE 12.6%

6.8%

19.1 %

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refuel 8 began on 4/30/92; duration of 60 days.

25.. IF SHUTDOWN AT END OF REPORT PERIOD. E STIMATED DATE OF ST AR1UP.

N/A

28. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICA0LE TO CR-3 FORECAST ACHIEVED INITIAL CRITICAUTY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA I

l

o.

e AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-302 UNIT l'LCRP-3 DATE fAay 01,1992 COMPLETED BY J. A. Dinkowski TELEPHONE (904)563-4485 MONTH APRIL I-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DALLY POWER LEVEL (MWo-Net)

(MWe-Net) 1 -

0-17 850 2

'O' 18 849 3

-0 19 836 4

23 20 751 5_

606 21 709 6

-859' 22 850 7

855-23 540 8

858~

24 538 9

853-25 523 10 843 26 522 11 815 27 510-12 851 28 502 g

13 852 29 452 14 851-30 6

15

-842 18 849:

INSTRUCTIONS:

'On this format. list the dally average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNTT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

$0.-302 UNET FM DATE way 01.1se2 l

REPORT MONTH. APRIL COMPLETTD B*

J A Bs,Armou l

THIEPHONE 4'904) M5

[

f NO.

DATE TYPE (1)

DURATION REASON (2)

METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTME SHtJTTING EVENT CODE (4)

CODE (5)

ACTION TO PREVENT I

RECURRENCE HOURS l

DOWN REACTOR (3) REPORT #

f 4

92-0001 EA TRANSF.

CedNarron of Mar *,h outage _

i l

92-09 920401~

F 88.9 A

l l

5 fCA HC HTEXCH Reduced pow to 85% toinsta'i Bend l

920420 S~

61.7 B

Flanges on *B* wa'erbox in preparation f

92-10 for retubing

  • A* waterbox.

92 920422 S

1800 B

5 N/A HH PUMPXX Condensate Pump 1 A (CDP-1 A) was taken out of service due to de' active l

controner.

i Start of Refue ats Outage Vt:L f

r I

' 22.3 '

C 1

N/A ZZ ZZZZZZ f

92-12 920430 S

I l

I i

l f

f 1

i l

l l

5 f

4 3

EXM8'T Y Sa*8E SOM 2

E2MrBrfG-m5T-N Y

1 95ETN00 F08t P54EPARAT30'e OF CATA REA9)N 1 eamNumt E86TRY 5METTS FOR UCDeSEE F: FORCED A 4 0UraturTFAEUAE 2~asANuat 9CAAAf FVEwf REPORT lL.E51FLE 8-SCHEDULED s-asAtNTEM*MOE OR TEST S. AUTO 9CRAas (98UfEG.St99 CJEFUELPs a.COsdT1NUED DJEGL~JT0fW FESTMCTION SJEDUtTD LOAD EMMATM TSWNSWO &

S.OTHEM LICEMSE ADaswetSTRA110N F e seP3TRATFJed G-CPE%ATIONAL EFWOR (EXW M oTHE9

-~-Me mum l ll

ec t..

1.-

MONTliLY OPERATIONAL

SUMMARY

STATEMENT DOCKET Mo.

50-302 uNrr FLCRP-3 DAlli M,4adi,1992 COsAPLETY D BY J. A. Blnkowski TELEfHoNF.

L964)S63-4485 MONTH: APRIL c

SUMMARY

STATEMENT:

Breaker closure at 1653 on April 4 ended the March outage.

Full power was reached by 2400 on April 5,1992. On April 20 at 0000, a power

. reduction to_85% full power began in order to take "B" waterbox off-line in

. preparation for Refuel 8 condenser retubing of waterbox " A". The plant ran at

- 85% power until the " A" Condensate Pump Controller failed causing the loss of the." A" Condensate Pump and limiting power to 65% until shutdown for Refuel 8 began on April 30.-

_