.v OPERATUG DATA REPORT DOCKETNO. 50-302 DATE 5/3/84 COMPLETED BY D. Graham TELEPHONE (9041 795-3802 OPERATING STATUS

1. Unit Name:

Crystal-River Unit 3 Notes 4/1/84 - 4/30/84

2. Reporting Period:
3. Licensed Thermal Power (MWt):

2544 890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

860

6. Maximum Dependable Capacity (Gross MWe):

821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

. 9. Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any:

N/A This Month Yr to-Date Cumulative

11. Hours in Reporting Period.

710 2901 62543 i

12. Number Of Hours Reactor Was Critical 481 1 2597.1 40166.3
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 470.7 2558.6 39177.6
15. Unit Reserve Shutdown Hours 0

0 0

L

16. Gross Thermal Energy Generated (MWH) 1111142 6139223 88103558
17. Gross Electrical Energy Generated (MWH) 390930 2136607 30063343
18. Net Electrical Energy Generated (MWH) 372486 2037313 28554396
19. Unit Service Factor 65.5%

88.1%

62.6%

20. Unit Availability Factor 6s.sY RR.1Y 62.6%

61.17 85.5%

57.7%

i-

21. Unit Capacity Factor (Using MDC Net)_

62.8%

85.1%

55.3%

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 2.1%

4.0%

22.5%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

None j

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A l

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved s

INITIA L CRITICALITY 1/14/77 INITlhL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/77

~

~

8405140026 840430 l

PDR ADOCK 05000302 (9/77)

I R

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. sn_tn?

UNIT -FLCRP-3 DATE 5/3/84 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH 4/84 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) l 817 7

0 844 0

2 I8 779 3

19 n

4 804 20 426 F

I74 21 818 5

0 822 6

22 7

0 23 819 8

50 24 823 718 P18 9

25 10 26 438 Ii 800 27 817 828 812 12 yg 13 7?A 29 A06 14 0

30 802 0

15 3,

16 0

INSTRUCTIONS On this format. list the aserage daily unit pov er level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

0 DOCKET NO. 50-302

' UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP ~1 DATE 5/3/84 COMPLETED BY S A-Mrnunre REPORT MONTil 4/84 TELEPHONE (904) 795-3802 "i

5 c

m 3m

.2 _e E

--, E a Licensee g t, c4 Cause & Corrective 8~

Action to f '$

No.

D.ite y,

3g 4

.g g $

Event s '?

$E E

j iji g Report #

N0 Present Recurrence 6

84-16 840405 S

85.9 A

1 N/A CH HTEXCH Feedwater piping developed a leak.

84-17 840413 S

152.4 A

1 N/A CH HTEXCH Feedwater piping was leaking. Leak was repaired.

84-18 840426 F

10.0 A

3 No LER writ-IF INSTRU Non-Nuclear instrumentation failed ten at this while testing power supply.

time.

NCOR #84-111 will be used for input.

I 2

3 4

F: Forced R-ason :

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D Regulatory Restriction 4-Other (Explain) 01611 E-Operator Training & License Examination 5

F Administrative Exhibit I - Same Source G-Operational Error (Explain) 01/77)

Il-Other (Explain)

- 7,4.c MONTHLY OPERATIONAL

SUMMARY

STATEMENT i

DOCKET NO. 50-302 UNIT FLCRP-3 DATE 5/3/84 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 f

[

MONTH April'1984 i

SUMMARY

STATEMENT: The plant was down for patt of the month to repair leaking feedwater piping on the OTSG. Repairs were completed and the plant returned to full power.

i Non-nuclear power supply instrumentation failed during a test i

of the system. The problem was corrected.

1 I

i-

l..

l.

i-t a

b

~..

.o a3o i

8 e

O aeo**

P..o..w...er May 8,1984 3F0584-04 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Mr. DeYoung:

Attached are twelve (12) copies of the Crystal River Unit 3 April 1984 Monthly Operating Report.

This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, f-wynd P. Y. Baynard Assistant to Vice President

)

Nuclear Operations -

DVH:feb i

Attachments l

cc:

Mr. 3.P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303

\\

G EN ERAL OFFICE 3201 Thirty-fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151

_. _