n
.v OPERATUG DATA REPORT DOCKETNO. 50-302 DATE 5/3/84 COMPLETED BY D. Graham TELEPHONE (9041 795-3802 OPERATING STATUS
- 1. Unit Name:
Crystal-River Unit 3 Notes 4/1/84 - 4/30/84
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2544 890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Electrical Rating (Net MWe):
860
- 6. Maximum Dependable Capacity (Gross MWe):
821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
. 9. Power Level To Which Restricted. If Any (Net MWe):
N/A
- 10. Reasons For Restrictions. If Any:
N/A This Month Yr to-Date Cumulative
- 11. Hours in Reporting Period.
710 2901 62543 i
- 12. Number Of Hours Reactor Was Critical 481 1 2597.1 40166.3
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Line 470.7 2558.6 39177.6
- 15. Unit Reserve Shutdown Hours 0
0 0
L
- 16. Gross Thermal Energy Generated (MWH) 1111142 6139223 88103558
- 17. Gross Electrical Energy Generated (MWH) 390930 2136607 30063343
- 18. Net Electrical Energy Generated (MWH) 372486 2037313 28554396
- 19. Unit Service Factor 65.5%
88.1%
62.6%
- 20. Unit Availability Factor 6s.sY RR.1Y 62.6%
61.17 85.5%
57.7%
i-
- 21. Unit Capacity Factor (Using MDC Net)_
62.8%
85.1%
55.3%
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 2.1%
4.0%
22.5%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
None j
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A l
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved s
INITIA L CRITICALITY 1/14/77 INITlhL ELECTRICITY 1/30/77 COMMERCIAL OPERATION 3/13/77
~
~
8405140026 840430 l
PDR ADOCK 05000302 (9/77)
I R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. sn_tn?
UNIT -FLCRP-3 DATE 5/3/84 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH 4/84 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) l 817 7
0 844 0
2 I8 779 3
19 n
4 804 20 426 F
I74 21 818 5
0 822 6
22 7
0 23 819 8
50 24 823 718 P18 9
25 10 26 438 Ii 800 27 817 828 812 12 yg 13 7?A 29 A06 14 0
30 802 0
15 3,
16 0
INSTRUCTIONS On this format. list the aserage daily unit pov er level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
0 DOCKET NO. 50-302
' UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP ~1 DATE 5/3/84 COMPLETED BY S A-Mrnunre REPORT MONTil 4/84 TELEPHONE (904) 795-3802 "i
5 c
m 3m
.2 _e E
--, E a Licensee g t, c4 Cause & Corrective 8~
Action to f '$
No.
D.ite y,
3g 4
.g g $
Event s '?
$E E
j iji g Report #
N0 Present Recurrence 6
84-16 840405 S
85.9 A
1 N/A CH HTEXCH Feedwater piping developed a leak.
84-17 840413 S
152.4 A
1 N/A CH HTEXCH Feedwater piping was leaking. Leak was repaired.
84-18 840426 F
10.0 A
3 No LER writ-IF INSTRU Non-Nuclear instrumentation failed ten at this while testing power supply.
time.
NCOR #84-111 will be used for input.
I 2
3 4
F: Forced R-ason :
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction 4-Other (Explain) 01611 E-Operator Training & License Examination 5
F Administrative Exhibit I - Same Source G-Operational Error (Explain) 01/77)
Il-Other (Explain)
- 7,4.c MONTHLY OPERATIONAL
SUMMARY
STATEMENT i
DOCKET NO. 50-302 UNIT FLCRP-3 DATE 5/3/84 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 f
[
MONTH April'1984 i
SUMMARY
STATEMENT: The plant was down for patt of the month to repair leaking feedwater piping on the OTSG. Repairs were completed and the plant returned to full power.
i Non-nuclear power supply instrumentation failed during a test i
of the system. The problem was corrected.
1 I
i-
- l..
l.
i-t a
b
~..
.o a3o i
8 e
O aeo**
P..o..w...er May 8,1984 3F0584-04 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Mr. DeYoung:
Attached are twelve (12) copies of the Crystal River Unit 3 April 1984 Monthly Operating Report.
This report is submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, f-wynd P. Y. Baynard Assistant to Vice President
)
Nuclear Operations -
DVH:feb i
Attachments l
cc:
Mr. 3.P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30303
\\
G EN ERAL OFFICE 3201 Thirty-fourth Street South e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151
_. _