3F0498-03, Forwards ten-year ISI Program Manual for Third Insp Interval for Crystal River,Unit 3.Manual Updated to Meet Requirements of 1989 Edition of ASME Boiler & Pressure Vessel Code IAW ASME Section Xi,Except Where Specific Relief Is Requested

From kanterella
(Redirected from 3F0498-03)
Jump to navigation Jump to search
Forwards ten-year ISI Program Manual for Third Insp Interval for Crystal River,Unit 3.Manual Updated to Meet Requirements of 1989 Edition of ASME Boiler & Pressure Vessel Code IAW ASME Section Xi,Except Where Specific Relief Is Requested
ML20216H969
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/16/1998
From: Baumstark J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20216H974 List:
References
3F0498-03, 3F498-3, NUDOCS 9804210274
Download: ML20216H969 (1)


Text

I i

e f=2WAo,"

Ficrida Power o,.EEE?c% we. cen.72 April 16,1998 3F0498-03 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

ASME SECTION XI INSERVICE INSPECTION TEN YEAR (NDE) PROGRAM MANUAL

Reference:

FPC to NRC letter number 3F0397-12, dated March 13,1997 Extension of Inservice Inspection / Inservice Testing Second Interval Dear Sir-Florida Power Corporation (FPC) is hereby submitting the Crystal River Unit 3 (CR-3) Ten Year (NDE) Inservice Inspection Program Manual for the third inspection interval. The Manual has been updated to meet the requirements of the 1989 Edition of the American SocNty of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, in accordance with ASME Section XI, Article IWA-2400, except where specific relief from the Code has been requested by FPC, pursuant to 10CFR50.55a(3). The second ten year inspection interval at Crystal River Unit 3 will end on August 13,1998, and the third ten year inspection interval will begin on August 14,1998.

ASME Code Cases approved by the NRC as identified in Regulatory Guide 1.147, which are applicable to CR-3, and the specific Relief Requests are identified in the Manual.

l If you have any questions conceming the Manual, please contact Ms. Sherry Bemhoft, Manager, Nuclear Licensing at (352) 563-4566.

Sincerely,,

t

~,

J.

. B umstark l

Director

('

)

Nuclear Engineering and Projects 1

JSB/pmp Enclosure vv0 xc: Regional Administrator, Region ll Senior Resident inspector NRR Project Manager 9304210274 980416 4

PDR ADOCK 05000302 G

PDR CRYSTAL RIVER ENERGY COMPLEX: 15760 W. Power une Street

  • Crystal River, Florida 34428 4 708 * (352)7954486 A Florida Progress Company

- ^^

.