3F0496-29, Whole Body Exposure for CY95

From kanterella
Jump to navigation Jump to search
Whole Body Exposure for CY95
ML20107M386
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/31/1995
From: Boldt G
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0496-29, 3F496-29, NUDOCS 9604300361
Download: ML20107M386 (3)


Text

s' M'

Florida Power CORPORATION axwIN April 23, 1996 3F0496-29 U. S. Nuclear Regulatory Commission l Attn: Document Control Desk Washington, D. C. 20555

Subject:

Occup;tional Radiation Exposure Report

Dear Sir:

Florida Power Corporation (FPC) is submitting the attached report in accordance with Improved Technical Specification (ITS) 5.7.1.1(a). The report provides the man-rem radiation exposures to personnel at Crystal River Unit 3 (CR-3) according ,

to work and job function. The radiation exposure report required by 10 CFR l 20.2206(b) was submitted in accordance with 10 CFR 20.2206(c) to the NRC's REIRS Project Manager by FPC letter (3F0496-31), dated Aril 22, 1996.

Sincerely, G. L. oldt Vice President Nuclear Production GLB/JWT I

Attachment xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager 9604300361 951231 PDR ADOCK 05000302 R PDR CRYSTALRIVER ENERGY COMPLEX:15760 W. Power Line St . Crvstal River, Florida 3442&6706 (352) 7956486 A Florida Progress Company h9

1 i

, . . . l

, 1

WHOLE CODY EXPOSURE FOR CALENDAR YEAR 1995

l 1

l .

1 i

l Licensee Reporting (:Name and Address) NRC license No(s).

l FLORIDA POWER CORPORATION DPR-72

. CRYSTAL RIVER UNIT 3 15760 W. POWER LINE ST CRYSTAL RIVER, FLORIDA 34428-6708 If personnel monitoring was not required to be proceded to ll any individual during the year, checking this box will constitute a negative report indicating that such personnel monitoring was not required.

OTHERWISE, COMPLETE THE FOLLOWING TABLE:

Estimated Annual Whole Body Number of Individuals Exposure Ranges * (: Rems) in Each Range No Measurable Exposure................. 870 Less than 0.100........................ 197 0.100 -

0.250.......................... 14 0.250 -

0.500.......................... 0 0.500 - 0.750.......................... 0 0.750 - 1.000.......................... 0 1.000 -

2.000.......................... 0 2.000 - 3.000.......................... 0 3.000 - 4.000.......................... 0 4.000 - 5.000.......................... 0 5.000 - 6.000.......................... 0 6.000 - 7.000.......................... 0 7.000 -

8.000.......................... 0 1 9.000 - 9.000.......................... O 9.000 - 10.000......................... O  ;

10.000 -

11.000........................ 0 11.000 -

12.000......................... 0 1 Greater than 1.2.000.................... 0 TOTAL NUMBER OF INDIVIDUALS REPORTED 1081 The above information is submitted for the total number of l individuals for whom personnel monitoring was: (check one) ll Required under 10 CFR 20,202(a) or 10 CFR 34.33 (a) during the calendar year.

j

, lXl Provided during the calendar year.

l l

l

  • Individual values exactly equal to the values separating exposure ranges shall be reported in the higher range.
l. '

- FL",RIDA P1WER CORPORATION ANNUAL STS DOSE REPORT FOR PERIOD 01/01/1995 TO 12/31/1995 NUM8ER OF PERSONNEL ( >= 100 WtEM ) TOTAL MAN REM STATION UTILITY CONTRACT WORKER STATION UTILITY CONTRACT WORKER EMPLOYEES EMPLOYEES AND OTHERS EMPLOYEES EMPLOYEES AND OTHERS REACTOR OPERATIONS AND SURVEILLANCE MAINTENANCE O 0 0 0.010 0.000 0.000 OPERATION PERSONNEL 1 0 0 0.876 0.000 0.000 i

HEALTH PHYSICS PERSONNEL 0 0 0 0.000 0.000 0.000 SUPERVISOR PERSONNEL 0 0 0 0.000 0.000 0.000

, ENGINEERING PERSONNEL 0 0 0 0.017 0.000 0.000 1

1 ROUT!NE MAINTENANCE  !

MAINTENANCE 1 0 0 1.797 0.282 0.384 i OPERATION PERSONMEL 0.664 1 0 0 0.000 0,000 l HEALTH PHYSICS PERSONNEL 7 0 0 2.135 0.000 0.000 I SUPERVISOR PERSONNEL 0 0 0 0.239 0.132 0.378 4

ENGINEERING PERSONNEL 0 0 0 0.172 0.267 0.000 l INSERVICE INSPECTION MAINTENANCE 0 0 0 0.000 0.000 0.000 1 4 OPERATION PERSONNEL 0 0 0 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0 0 0 0.000 0.000 0.000 SUPERVISOR PERSONNEL 0 0 0 0.000 0.000 0.000 ENGINEERING PERSONNEL 0 0 0 0.000 0.000 0.000 SPECIAL MAINTENANCE MAINTENANCE O O 0 0.000 0.000 0.000 clPERATION PERSONNEL 0 0 0 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0 0 0 0.000 0.000 0.000 SUPERVISOR PERSONNEL 0 0 0 0.000 0.000 0.000 ENGINEERING PERSONNEL 0 0 0 0.000 0.000 0.000 WASTE PROCESSING MAINTENANCE O O 0 0.003 0.000 0.000 OPEkATION PERSONNEL 2 0 0 0.624 0.000 0.000 HEALTH PKYSICS PERSONNEL 0 0 0 0.016 0.000 0.000 SUPERVISOR PERSONNEt 1 0 0 0.148 0.000 0.000 ENGINEERING PERSONNEt, 0 0 0 0.000 0.000 0.000 REFUELING MAINTENANCE O 0 0 0.000 0.000 0.000 OPERATION PERSONNEL 0 0 0 0.000 0.000 0.000 HEALTH PHYSICS PERSONNEL 0 0 0 0.000 0.000 0.000 S17ERVISOR PERSONNEL 0 0 0 0.000 0.000 0.000 ENGINEERING PERSONNEL 0 0 0 0.000 0.000 0.000 TOTALS MAINTENANCE 1 0 0 1.810 0.282 0.384 OPERATION PERSONNEL 4 0 0 2.164 0.000 0.000 HEALTH PHYSICS PERSONNEL 7 0 0 2.151 0.000 0.000 SUPERVISOR PERf,0NNEL 1 0 0 0.387 0.132 0.378 ENGINEERING PERSONNEL 0 0 0 0.189 0.267 0.000 TOTAL DOSE IN REMS BY CATEGORY 6.701 0.681 0.762 TOTAL STATION DOSE IN REMS 8.144