OPERATING DATA REPORT DOCKET S0 50-301 DATE 4/1/88 COMPLETED BY S.

A.

Stevart TELEPHONE QOM 795-6486 i

OPERATING STATUS N

l

1. Unit Name:

Crystal River Unit 1 3-1-88 thru 3-31-88

2. Reporting Period:

2544

3. Licensed Thermal Power (MW ):

890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

860

6. Maximum Dependable Capacity (Gross MWe):

821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

N/A (Net MWe):

N/A

9. Power Lesel To which Restricted.lf Any/A N
10. Reasons For Restrictions.lf Any:

This Month Yr. to Date Cumulatise 7&&

91RA otana

11. Hours in Reporting Period 697.9 1913.0 61239.0
12. Number Of Hours Reactor Was Critical 0.0 0.0 1280.6
13. Reactor Resene Shutdown Hours 670.4 1847.6 59863.5
14. Hours Generator On Line 0.0 0.0 0.0
15. Unit Resene Shutdown Hours 1575214 4359349 134106537
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)

-- 54 2.Z.M.

1501760 45876291 516080 1427620 43561207

18. Net Electrical Energy Generated (MWH)
19. Unit Senice Factor 90.17, 84.67.
61. gar 90.17.

84,67 61.87,

20. Unit Asailability Factor 84.5%

79.67.

56.17.

21. Unit Capacity Factor (Using MDC Net, 84.17.

79.27.

54,57.

22. Unit Capacity Factor (Using DER Net) 7 97.

4.8%

22.57.

(

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months tType. Date, and Duration of Eacht:

None i

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITI AL CRITICALITY 1/14/77 1/30/77 INITI AL ELECTRICITY COMMERCl AL OPER ATION 3/13/77 en-,

U j

8804150380 390331 4

PDR ADOCK 05000302 1

3(

R DCD 1

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE 4/1/88 COMPLETED BY L

A. m k weki TELEPHONE (904)795-6486 MONTy March DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe Nett 1

0 37 851 2

0 13 842 3

206 g,

841 4

427 20 838 5

442 0'3 21

'6 460 850 22 7

279 23 838 8

344 34 847 9

833 25 843 10 837 26 838 11 840- - -

27 852 835 840 28 13 843 840 39 14 843 30 838 15 835 841 3,

16 835 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reportine month. Compute to the nearest whole megawatt.

(4 /77 )

UNIT SHUHM)WNS AND POWER REDUCHONS DOCKET NO.

50-302 UNIT NAME FLCRP-,1 DATE 4/I/88 REPORT MONDg March /88 COMPLETED 3Y S.A.

Stewart TER EPHONE (904)795-f>486 c_

3 5*

2e E

c 4 Latensee g*,,

g.,

Cause & Corretts.c 7

Disc

{

3g i

jsy E,ent

=y h'g 6.

Ai,,,,,,,

g$3 Ec

.5 i?> c Rep'wt

  • N0 Present Resurrence u

6 88-4 880228 F

57.7 A

4 88-006 Cll VALVOP Continued out age: resulting from a reactor trip on high RCS pressure. A l>roken stem nut caused the saain feedwater block valve (FWV-29) to close 88-5 880303 S

0.0 A

5 N/A Cil VALVOP

)perated at reduced load of spproximately 607.due to work being l>erformed on FWV-29.

88-6 880307 S

15.9 B

1 N/A Cil VALVOP rhe plant was taken off-line to

omplete testing of the Feedwater
> lock valve repairt I

2 3

4 f: Fewted Rerson:

79etted Enhabit G - lastructi ms S. Scheduled A-Equipment Failure (Emplain) f.w Picparare m of Dasa

, _ g,,, 3 B-Maintenance or Test 2-Manoa1 scra.

Lat8) Sh " t5 fo' h ea5

C Refueling 3-Auto scra.

Event Reg %=t (LE R) file (NURI G D Regulatory Restriction 4-Continued 01618 i Operator Training A I; cense I sarranation 5-Reduced toad F-Adrninistrat'rve 5

Goperatamal Erros t Explain)

Eshabit I - Same Saiur(e t'8/77 )

Il Other ( E mplain) 1

c.,

HONTHLY OPERATIONAL

SUMMARY

STATDENT DOCKET No.

sn. ins UNIT FLCRP-3 DATE 4/1/88 COMPLETED BY S. A. Stewart TELEPHONt904)795-6486 MONTN March /88

SUMMARY

STATDElff Crystal River 3 had two outages and operated for 4 days at reduced power for feedwater valve repairs during the month.

I l

J

gQ

,*e,'

o c@90,, *,

c c o *.

ooDt h30*

'e$kO,.f e*

.;et..ae la a o Florida Power C o m P O R AT iO N April 12, 1988 3F0488-05 Document Control Desk U.S.

Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DpR-72 Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit 3 March 1988 Monthly Operating Report.

This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

}

ih4nbAsb OC/ s K.R.

Wilson, Manager Nuclear Licensing

/dhd xc:

Dr.

J.

Nelson Grace Regional Administrator, Region II Mr. T. 5'. Stetka Senior Resident inspector Post Office Boi 219

  • Crystal Rner, Fionda 32629 e Telephone (904 795 3S32 k

A Flonda Proyess COmpay