Text

_ - _ _ _ - _ - .

OPERATING DATA REPORT DOCKET NO. 50-302 DATE 4/1/87 COMPLETED BY D. Gra!1fim TELEPHONE (904) 795-3802 OPERATING STATUS

1. Unit Name: Crystal River Unit 3 N t'5
2. Reporting Period: 3/1/87 - 3/31/87
3. Licensed Thermal Power (MWt): '544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricted. If Any (Net MWe): NA
10. Reasons For Restrictions,if Any: NA

,..m 4 This Month

, Yr..to.Date Cumulative

11. Hours In Reporting Period 744 2160 88104
12. Number Of Hours Reactor Was Critical 744 1657 55649.4
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On.Line 744 1652 54404.1
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1786865 3934217 122538154 .
17. Gross Electrical Energy Generated (MWH) 622147 _,

1374239 41929450 l

18. Net Electrical Energy Generated (MWH) 592350 1307314 39820112
19. Unit Service Factor 100% 76.5 % 61.7 %
20. Unit Availability Factor I n noA 7634 61.7 %
21. Unit Capacity Factor (Using MDC Net) 97.0 % 73.7 % 56.5 %
22. Unit Capacity Factor (Using DER Net) 96.5 % 73.4 % 54.8 %
23. Unit Forced Outage Rate 0% 23.5 % 24.0 %
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each1:

Refuelinc Outage to begin 9/19/87. scheduled to last 11 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
26. Units in Test Status (Prior io Commercial Operation): Forecast Achieved INITIA L CRITICALITY I/14/77 INITIA L ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 8704140332 870331 hDR ADOCK 05000302 l

PDR gQ (9/77,

,_ AVERAGE DAILY UNIT POWER LEVEL

') DOCKET NO. 50-302 3.lT FLCRP-3 DATE COMPLETED BY 4/1/87 TELEPHONE (904) 795-3802 MONDI hlarch 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 822 37 815 2 820 18 813 3 818 19 835 4 819 20 777 5 813 808 817 6  :: 805 Y73 701

/

  • 7 23 g

@8 24 9 812 25 759 10 821 802 26 11 819 27 798 12 818 805 28 13 818 793 29 14 831 773 30 15 31 16 816 INSTRUCTIONS On this format. list the average daily umt power leselin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

s (01771

8 $.

nv

,)

..a.

1 e -

5 DOCKETNO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS F LC R P-3 UNIT NAME DATE 4/1/87 COMPLETED BY J. Iloiton REPORT MONTyg Sfarch 1987 TELEPHONE (904) 795-3802

-, jg 3 Y Licensee { t, o Cause & Corrective l

No. Date H

Q 3g 5

@ [sE j Event Report #

p mO u Action to Present Recurrence fE j ;?, g g c5 87-04 870307 F 0.0 A 5 NA IIII RELAYX Relay failure caused main feedwater pump 2A suction valve FWV-14 to continue closing during a partial stroke 4 test. Pump tripped and load runback occurred.

]

i 87-05 870308 F 0.0 A 5 NA lill INSTRU While increasing load following event

- #87-04, feedwater flow transmitter in "B" feedwater loop failed to transmit properly. Load increase stopped for transmitter repair.

i l

i i 2 3 4 F: Forced Reason: Method Exhibit G. Instructites S: Scheduled A Equipment Failure (Explain) -

,_g,,,,, for Preparation of Data B Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C Refueling 3-Auto scram Event Report (LE R) File (NURI G.

D-Regulatory Restriction 4-continued 0161)

E Operator Training & License Examination 5-Reduced Load F Adtninistrative 9-Other 3 i G Operational Error (Explain) Exhibit I - Same Source

19/77) Il-Other (Explain) l

}

MONTHLY OPERATIONAL

SUMMARY

STATEMENT

, ~,

)

DOCKET NO. 50-302 UNIT FLCRP-3 DATE 4/1/87 COMPLETED BY J. Holton TELEPHONE (904) 795-3802 1

l MONTH March 1987

SUMMARY

STATEMENT:

Crystal River Unit 3 remained on line all month with two load reductions occurring back to back with each other, 4

'h, 4

e 1

I f

1 i

l i

I i

I l

th,ngs,%

e ', l

s t. 'ijfoi wo e '.. m l'q' @,.

3

  • fb 0p , Cgs b.t

/

e ,0 -# e e.

Florida Power CORPORATlON April 9, 1987 3F0487-08 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DpR-72 Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit 3 March 1987 Monthly Operating Report.

This report is submitted in accordance with Technical Specificatica 6.9.1.6.

Sincerely,

/

E. C. Simpson Acting Director, Nuclear Site Support AEF/sdr Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Mr. T. F. Stetka Resident Inspector I

Post Office Box 219 e Crystal River, Florida 32629 + Telephone (904) 795-3802 A Florida Progress Company