Monthly Operating Rept for Mar 1985
ML20115C933
Person / Time
Site: Crystal River 
Issue date: 03/31/1985
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0485-06, 3F485-6, NUDOCS 8504180630
Download: ML20115C933 (5)


Text

_

'^

r OPERATING DATA REPORT

' DOCKET NO. 50-302

.DATE 4/2/85 COMPLETED BY D. Graham TELEPHONE font) vos-3802 OPERATING STATUS

1. Unit Name. ' Crystal River Unit 3 Notes
2. Reporting Period:

3/1/85 - 3/31/85 2544

3. Licensed Thermal Power (MWt):

890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

860

6. Maximum Dependable Capacity (Gross MWe):

821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

NA NA

9. Power Level To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions. If Any:

NA This Month Yr..to-Date Cumulative 744 2160 70584

11. Hours In Reporting Period 192.3 1608.3 47524
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On.Line 190.5 1606.5 46524.3
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 263182 2924173 104586058
17. Gross Electrical Energy Generated (MWH)

A7575 1014639 35741856

18. Net Electrical Energy Generated (MWH) 80750 954730 33950741
19. Unit Service Factor 25.6%

74.47.

65.97.

20.' Unit Availability Factor 9 5. 6*L 74.4%

65.9%

21. Unit Capacity Factor (Using MDC Net) 13.2%

53.8%

60.5%

13.27.

53.6%

58.3%

22. Unit Capacity Factor (Using DER Net) 0%

07.

19.6%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Di. ration of Each)-

Refueling outage which began 3/9/85 and is scheduled to last 20 weeks.

t

25. If Shut Down At Er d Of Report Period. Estimated Date of Startup:

July 24, 1985

26. Units in Ted Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 1/14/77 (([

INITIAL ELECTRICITY 1/1n/77 COMMERCIAL OPER ATION '

3/13/77 I[/

8504180630 850331 PDR ADOCK 05000302 R

pyg gn,yy,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-302 UNIT FLCRP-3 DATE 4/2/85 COMPLETED BY D. Graham TELEPHONE (9n4) 795-3805 MONTH March 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(Mwe. Net )

g 455 37 0

432 2

yg 3

433 39 4

433 20 5

424 2g 6

408 22 415 7

23 8

364 24 9

0 25 10 26 II 27 12 28 13 29 14 30 V -

15 31 16 INSTRUCTIONS Cn this format, list the average daif> unit power leselin M%e Net for each da.s in the reporting month. Compute to the nearest whole megawatt.

(4/776 i

1

e DOCKET NO.

50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FUDP DATE Al'Inc

^

S'.A'.

Stevart COMPLETED BY REPORT MONT11 hrch TELEPHONE (904) 795;3802

~E c

50

'b 0

3!

~

) (E ~h Event E*i 1.ecensee En Cause & Corrective 4

(i f

Action to No.

D.it e g'

fE jgg Report #

cn V Present Recurrence H

5 85-03 850301 5

0.0 F

5 l'A RC FUELXX POWER COASTDOWN 85-04 850308 5

533.5 C

1 NA ZZ ZZZZZZ SHUTDOWN FOR FIFTH REFUELING OUTAGE 4

1 l

t i

2

.I 4

F: Forced Reason:

Method:

Exhibit G Instructitms S: Stheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data 4

B. Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling

.L Automatic Scram.

Event Report (LE R) File (NilRI G.

D-Regulatory Restriction 4-Other ( E xplam) 0161)

E-Operalor Training & tacense I:xamination F Administrative 5

G Operational I iror ( E xplain) hiubit 1 Same Source (9/77)

Il-Ot her (INplain)

D

s

.e.

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 4/3/85 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH-March

SUMMARY

STATEMENT:

The plant operated at reduced power due to the end of cycle power coastdown. On March 8 the plant began the fif th refueling outage.

G 4

r 1

e e

jee se*:

Oe ee.

Power C O R P O R AT 10 N April 8,1985 3F0485-06 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 March 1985 Monthly

- Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc:

Dr. 3. Nelson Grace Regional Administrator, Region 11 Office of Inspection & Enforcement U.S. Nuclear Regulatory Commi:sion 101 Marietta Street N.W., Suite 2903 1

Atlanta, GA 30323 ZE2y G EN ER AL OFFICE 3201 Thirty fourth street south e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151