3F0485-06, Monthly Operating Rept for Mar 1985
| ML20115C933 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/31/1985 |
| From: | Graham D, Westafer G FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0485-06, 3F485-6, NUDOCS 8504180630 | |
| Download: ML20115C933 (5) | |
Text
_
'^
r OPERATING DATA REPORT
' DOCKET NO. 50-302
.DATE 4/2/85 COMPLETED BY D. Graham TELEPHONE font) vos-3802 OPERATING STATUS
- 1. Unit Name. ' Crystal River Unit 3 Notes
- 2. Reporting Period:
3/1/85 - 3/31/85 2544
- 3. Licensed Thermal Power (MWt):
890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Electrical Rating (Net MWe):
860
- 6. Maximum Dependable Capacity (Gross MWe):
821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
NA NA
- 9. Power Level To Which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
NA This Month Yr..to-Date Cumulative 744 2160 70584
- 11. Hours In Reporting Period 192.3 1608.3 47524
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On.Line 190.5 1606.5 46524.3
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 263182 2924173 104586058
- 17. Gross Electrical Energy Generated (MWH)
A7575 1014639 35741856
- 18. Net Electrical Energy Generated (MWH) 80750 954730 33950741
- 19. Unit Service Factor 25.6%
74.47.
65.97.
20.' Unit Availability Factor 9 5. 6*L 74.4%
65.9%
- 21. Unit Capacity Factor (Using MDC Net) 13.2%
53.8%
60.5%
13.27.
53.6%
58.3%
- 22. Unit Capacity Factor (Using DER Net) 0%
07.
19.6%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Di. ration of Each)-
Refueling outage which began 3/9/85 and is scheduled to last 20 weeks.
t
- 25. If Shut Down At Er d Of Report Period. Estimated Date of Startup:
July 24, 1985
- 26. Units in Ted Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 1/14/77 (([
INITIAL ELECTRICITY 1/1n/77 COMMERCIAL OPER ATION '
3/13/77 I[/
8504180630 850331 PDR ADOCK 05000302 R
pyg gn,yy,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLCRP-3 DATE 4/2/85 COMPLETED BY D. Graham TELEPHONE (9n4) 795-3805 MONTH March 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(Mwe. Net )
g 455 37 0
432 2
yg 3
433 39 4
433 20 5
424 2g 6
408 22 415 7
23 8
364 24 9
0 25 10 26 II 27 12 28 13 29 14 30 V -
15 31 16 INSTRUCTIONS Cn this format, list the average daif> unit power leselin M%e Net for each da.s in the reporting month. Compute to the nearest whole megawatt.
(4/776 i
1
e DOCKET NO.
50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FUDP DATE Al'Inc
^
S'.A'.
Stevart COMPLETED BY REPORT MONT11 hrch TELEPHONE (904) 795;3802
~E c
50
'b 0
3!
~
) (E ~h Event E*i 1.ecensee En Cause & Corrective 4
(i f
Action to No.
D.it e g'
fE jgg Report #
cn V Present Recurrence H
5 85-03 850301 5
0.0 F
5 l'A RC FUELXX POWER COASTDOWN 85-04 850308 5
533.5 C
1 NA ZZ ZZZZZZ SHUTDOWN FOR FIFTH REFUELING OUTAGE 4
1 l
t i
2
.I 4
F: Forced Reason:
Method:
Exhibit G Instructitms S: Stheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data 4
B. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C. Refueling
.L Automatic Scram.
Event Report (LE R) File (NilRI G.
D-Regulatory Restriction 4-Other ( E xplam) 0161)
E-Operalor Training & tacense I:xamination F Administrative 5
G Operational I iror ( E xplain) hiubit 1 Same Source (9/77)
Il-Ot her (INplain)
D
s
.e.
MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 4/3/85 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH-March
SUMMARY
STATEMENT:
The plant operated at reduced power due to the end of cycle power coastdown. On March 8 the plant began the fif th refueling outage.
G 4
r 1
e e
jee se*:
Oe ee.
Power C O R P O R AT 10 N April 8,1985 3F0485-06 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 March 1985 Monthly
- Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely, G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc:
Dr. 3. Nelson Grace Regional Administrator, Region 11 Office of Inspection & Enforcement U.S. Nuclear Regulatory Commi:sion 101 Marietta Street N.W., Suite 2903 1
Atlanta, GA 30323 ZE2y G EN ER AL OFFICE 3201 Thirty fourth street south e P.O. Box 14042, St. Petersburg, Florida 33733 e 813-866-5151