3F0393-09, Forwards Updated Inservice Insp Program Administrative Controls
| ML20035B663 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/25/1993 |
| From: | Beard P FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20035B664 | List: |
| References | |
| 3F0393-09, 3F393-9, NUDOCS 9304020280 | |
| Download: ML20035B663 (1) | |
Text
.
Florida Power CORPORATION Crystal River Unit 3 Docket No. 50-302 March 25, 1993 3F0393-09 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555
Subject:
Changes to the NDE/ Inservice Inspection Plan
References:
A.
FPC to NRC, dated February 9, 1988 (3F0288-09)
Dear Sir:
Florida Power Corporation (FPC) submitted the second ten-year interval Inservice Inspection (ISI) Plan in Reference A.
The plan submitted was a general document extracted from the administrative controls and program description sections of a more detailed document named The Inservice Inspection Program.
These sections of the program have been extensively revised to reflect recent organizational changes and augmented controls of the overall administrative process such as the implementation of change notices to document all technical changes.
Attached please find copies of the updated administrative controls and program description sections of the Inservice Inspection Program which for the remainder of.
i the second ten-year interval are provided as the ISI Plan.
FPC will periodically submit revisions to these sections as they are updated.
Also, attached for your information are c pies of change notice; issued to the date of this letter.
Sincerely, P. M.,/Beard, Jr.
Senior Vice President Nuclear Operations i
PMB:LVC Attachments xc: Regional Administrator, Region II NRR Project Manager Senior Resident Inspector
)
i
^
93040292eo93b95
^' (
(UR ADOCK 05000302 A Florida Progress Company
[
j l
!