3F0386-03, Monthly Operating Rept for Feb 1986
| ML20137Y817 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/28/1986 |
| From: | Graham D, Stewart S, Westafer G FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0386-03, 3F386-3, NUDOCS 8603120393 | |
| Download: ML20137Y817 (5) | |
Text
i 1
O OPERATING DATA REPORT DOCKET NO.
50-302 DATE 7/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS N""'
- 1. Unit Name:
Crystal River Unit 3
- 2. Reporting Period:
2/1/86 - 2/28/86
- 3. Licensed Thermal Power (MWt):
2544
- 4. Nameplate Rating (Gross MWe):
890 825
- 5. Design Electrical Rating (Net MWe):
6 Maximum Dependable Capacity (Gross MWe):
R60 821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
NA NA
- 9. Power Level To Which Restricted If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
NA This Month Yr.-to Date Cumulative
!I. Hours In Reporting Period 672 1416 78600
- 12. Number Of Hours Reactor Was Critical 0
23.6 50324.6
- 13. Reactor Resene Shutdown Hour, 0
0 1280.3
- 14. Hours Generator On-Line 0
23.6 49114.4 0
0 0
- 15. Unit Reserve Shutdown Hours 0
55103 110523968
- 16. Gross Thermal Energy Generated (MWH)
- 17. ' Gross Electrical Energy Generated (MWH) 0 19541 37761603
- 18. Net Electrical Energy Generated (MWH) 0 1R5RO 35R63252
- 19. Unit Service Factor 0%
1.7%
62.5%
0%
1.7 %
62.5%
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDCNet) 0%
1.6%
57.2 %
0%
1.6 %
55.3 %
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 100%
98.3 %
21.2 %
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
NA
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
4/15/86
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY l/14/77 INITI A L ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/7't L
cV-8603120393 860228 6\\
(9/77y PDR ADOCK 05000302 R
pm
A A\\ l R AC.I. D AILY UNil POht R LIXLL DOCKEI NO..5R 't n9 UNil FLC R P-3 DATL 3/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1 0
17 0
2 18 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10 26 II 27 s/
12 28 13 29 14 30 15 31 16 v
INSTRUCTIONS On this format, list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawart.
(9/776 g
DOCKET NO. sn 'tn9 O
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Fi.CR p 't DATE 3/3/86 COMPLETED BY S. A. Stewart RFPORT MM 2/86 TELEPHONE (904) 795-3802 "i-c fs_.e 4
Licensee E,
Cause & Corrective e
e.
No.
Date R
3$
255 Event 5i k.
~.
2E E
Attron to c5 5 E
j di 'j Report #
N0 0
Present Recurrence
~
6 86-01 860101 F
672.0 A
4 86-01 CB PUMPXX The "A" Reactor Coolant Pump shaft is being replaced. Nondestructive testing and evaluation of B,C, and D pump shafts will also be performed.
I 2
'j 4
F: Forced Reason:
M.thod Exhibit G-Instruttas S: Scheduled A Equipment Failure (Esplain) for Preparation of Data
,_n B Maintenance or Test 2-Menu 1Scran Entry Sheets for bcensee 5-Auto scran Event Repint (LE RI File int'RI G C.Refuehng D Regulatory Restriction 4-Continued 01611 E-Operator Training & Ucense Exarnin.ivion 5-Reduced toad 9-other F.Adrninistrative 3
G-Operational Error (Explain)
Eshibit I - Same Source 1,8/77)
Il-Other (E = plain)
- MONTIILY OPERATIONAL
SUMMARY
STATD!ENT DOCKET NO.
50-302 UNIT FI,C R P-3 DATE 3/3/86
~
COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH February 1986 SUl0(ARY STATEMENT:
Crystal River 3 remains off line for repairs and testing of all Reactor Coolant Pumps.
t 1
e i
I 1
~
O
- 1 i
p I.
.e Power C0RPORATION March 6, 1986 3F0386-03 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subj ect: Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 February 1986 Monthly Operating Report.
These reports are submitted in accordance with Technical Specification 6.9.1.6.
Si ncerely, A
1
,G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/ feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Comission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 Ys*d
\\ \\
GENERAL OFFICE 3201 Thirty fourth Street South.P.O. Box 14o42, St. Petersbur0, Florida 33733 813-866-5151
..