3F0386-03, Monthly Operating Rept for Feb 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1986
ML20137Y817
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/28/1986
From: Graham D, Stewart S, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0386-03, 3F386-3, NUDOCS 8603120393
Download: ML20137Y817 (5)


Text

i 1

l

., O l l

l OPERATING DATA REPORT DOCKET NO. 50-302 DATE 7/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 N""'

1. Unit Name:
2. Reporting Period: 2/1/86 - 2/28/86
3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 825 6 Maximum Dependable Capacity (Gross MWe): R60
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted If Any (Net MWe): NA
10. Reasons For Restrictions,If Any: NA This Month Yr.-to Date Cumulative

!I. Hours In Reporting Period 672 1416 78600

12. Number Of Hours Reactor Was Critical 0 23.6 50324.6
13. Reactor Resene Shutdown Hour, 0 0 1280.3
14. Hours Generator On-Line 0 23.6 49114.4 0 0 0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 0 55103 110523968 .
17. ' Gross Electrical Energy Generated (MWH) 0 ..

19541 37761603

18. Net Electrical Energy Generated (MWH) 0 1R5RO 35R63252
19. Unit Service Factor 0% 1.7% 62.5%
20. Unit Availability Factor 0% 1.7 % 62.5%

. 21. Unit Capacity Factor (Using MDCNet) 0% 1.6% 57.2 %

22. Unit Capacity Factor (Using DER Net) 0% 1.6 % 55.3 %
23. Unit Forced Outage Rate 100% 98.3 % 21.2 %
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

NA

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 4/15/86
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY l/14/77
  • INITI A L ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/7't cV-L 8603120393 860228 6\ (9/77y PDR ADOCK 05000302 R pm

A A\ l R AC.I. D AILY UNil POht R LIXLL DOCKEI NO. .5R 't n9 UNil FLC R P-3 DATL 3/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 0 17 0 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 II 27 ,

12 28 s/

13 29 14 30 15 31 16 v INSTRUCTIONS On this format, list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawart.

g (9/776

O DOCKET NO. sn 'tn9 ,

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Fi.CR p 't DATE 3/3/86 COMPLETED BY S. A. Stewart

' RFPORT MM 2/86 TELEPHONE (904) 795-3802 "i- c e e. E, ** Cause & Corrective 2E fs_.e4 Licensee No. Date

~.

R 3$

E

$ 255 Event Report #

5i N0 k.0 Attron to Present Recurrence c5 5 E j di 'j

~

6 4 86-01 CB PUMPXX The "A" Reactor Coolant Pump shaft is being 86-01 860101 F 672.0 A replaced. Nondestructive testing and evaluation of B,C, and D pump shafts will also be performed.

I 2 'j 4 F: Forced Reason: M.thod Exhibit G-Instruttas S: Scheduled A Equipment Failure (Esplain) ,_n for Preparation of Data B Maintenance or Test 2-Menu 1Scran Entry Sheets for bcensee C.Refuehng 5-Auto scran Event Repint (LE RI File int'RI G 4-Continued 01611 D Regulatory Restriction E-Operator Training & Ucense Exarnin.ivion 5-Reduced toad 9-other F.Adrninistrative 3 G-Operational Error (Explain) Eshibit I - Same Source 1,8/77) Il-Other (E = plain)

- MONTIILY OPERATIONAL

SUMMARY

STATD!ENT DOCKET NO. 50-302 UNIT FI,C R P-3

~

DATE 3/3/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH February 1986 SUl0(ARY STATEMENT: Crystal River 3 remains off line for repairs and testing of all Reactor Coolant Pumps.

t 1

e i

I 1

~

O

1 i

p

! I.

.e Power C0RPORATION March 6, 1986 3F0386-03 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subj ect: Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 February 1986 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Si ncerely, A

1

,G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/ feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Comission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 Ys*d\ \

GENERAL OFFICE 3201 Thirty fourth Street South.P.O. Box 14o42, St. Petersbur0, Florida 33733 813-866-5151

..