Text

i 1

O OPERATING DATA REPORT DOCKET NO.

50-302 DATE 7/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS N""'

1. Unit Name:

Crystal River Unit 3

2. Reporting Period:

2/1/86 - 2/28/86

3. Licensed Thermal Power (MWt):

2544

4. Nameplate Rating (Gross MWe):

890 825

5. Design Electrical Rating (Net MWe):

6 Maximum Dependable Capacity (Gross MWe):

R60 821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

NA NA

9. Power Level To Which Restricted If Any (Net MWe):
10. Reasons For Restrictions,If Any:

NA This Month Yr.-to Date Cumulative

!I. Hours In Reporting Period 672 1416 78600

12. Number Of Hours Reactor Was Critical 0

23.6 50324.6

13. Reactor Resene Shutdown Hour, 0

0 1280.3

14. Hours Generator On-Line 0

23.6 49114.4 0

0 0

15. Unit Reserve Shutdown Hours 0

55103 110523968

16. Gross Thermal Energy Generated (MWH)
17. ' Gross Electrical Energy Generated (MWH) 0 19541 37761603
18. Net Electrical Energy Generated (MWH) 0 1R5RO 35R63252
19. Unit Service Factor 0%

1.7%

62.5%

0%

1.7 %

62.5%

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDCNet) 0%

1.6%

57.2 %

0%

1.6 %

55.3 %

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 100%

98.3 %

21.2 %

24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

NA

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

4/15/86

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY l/14/77 INITI A L ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/7't L

cV-8603120393 860228 6\\

(9/77y PDR ADOCK 05000302 R

pm

A A\\ l R AC.I. D AILY UNil POht R LIXLL DOCKEI NO..5R 't n9 UNil FLC R P-3 DATL 3/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe Net) 1 0

17 0

2 18 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 II 27 s/

12 28 13 29 14 30 15 31 16 v

INSTRUCTIONS On this format, list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole rnegawart.

(9/776 g

DOCKET NO. sn 'tn9 O

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Fi.CR p 't DATE 3/3/86 COMPLETED BY S. A. Stewart RFPORT MM 2/86 TELEPHONE (904) 795-3802 "i-c fs_.e 4

Licensee E,

Cause & Corrective e

e.

No.

Date R

3$

255 Event 5i k.

~.

2E E

Attron to c5 5 E

j di 'j Report #

N0 0

Present Recurrence

~

6 86-01 860101 F

672.0 A

4 86-01 CB PUMPXX The "A" Reactor Coolant Pump shaft is being replaced. Nondestructive testing and evaluation of B,C, and D pump shafts will also be performed.

I 2

'j 4

F: Forced Reason:

M.thod Exhibit G-Instruttas S: Scheduled A Equipment Failure (Esplain) for Preparation of Data

,_n B Maintenance or Test 2-Menu 1Scran Entry Sheets for bcensee 5-Auto scran Event Repint (LE RI File int'RI G C.Refuehng D Regulatory Restriction 4-Continued 01611 E-Operator Training & Ucense Exarnin.ivion 5-Reduced toad 9-other F.Adrninistrative 3

G-Operational Error (Explain)

Eshibit I - Same Source 1,8/77)

Il-Other (E = plain)

- MONTIILY OPERATIONAL

SUMMARY

STATD!ENT DOCKET NO.

50-302 UNIT FI,C R P-3 DATE 3/3/86

~

COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH February 1986 SUl0(ARY STATEMENT:

Crystal River 3 remains off line for repairs and testing of all Reactor Coolant Pumps.

t 1

e i

I 1

~

O

1 i

p I.

.e Power C0RPORATION March 6, 1986 3F0386-03 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Subj ect: Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 February 1986 Monthly Operating Report.

These reports are submitted in accordance with Technical Specification 6.9.1.6.

Si ncerely, A

1

,G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/ feb Attachments xc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Comission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 Ys*d

\\ \\

GENERAL OFFICE 3201 Thirty fourth Street South.P.O. Box 14o42, St. Petersbur0, Florida 33733 813-866-5151

..