3F0385-06, Monthly Operating Rept for Feb 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1985
ML20112A318
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/28/1985
From: Graham D, Westafer G
FLORIDA POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0385-06, 3F385-6, NUDOCS 8503180254
Download: ML20112A318 (5)


Text

OPERATING DATA REPORT DOCKET NO. 50-302 DATE 3/1/85 COMPLETED BY D. Genham TELEPHONE (904) 795-3802 OPERATING STATUS Crystal River Unit 3 Notes

1. Unit Name:
2. Reporting Period: 2/1/85 - 2/28/85
3. Licensed Thermal Power (MWt): 2544
4. Nameplate Rating (Gross MWe): 890
5. Desagn Electrical Rating (Net MWe): 825
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To which Restricted,If Any (Net MWe): NA
10. Reasons For Restrictions,if Any: NA This Month Yr.-to.Date Cumulative
11. Hours in Reporting Period 672 1416 69840
12. Number Of Hours Reactor Was Critical 672 1416 47331.7
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On.Line 672 1416 46333.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1089880 2660991 104322876
17. Gross Electrical Energy Generated (MWH) 376966 _ _,_. 927064 35654281
18. Net Electrical Energy Generated (MWH) 352600 873980 33869991
19. Unit Service Factor 100 % 100 % 66.3 %
23. Unit Availability Factor 100% 100 % 66.3 %
21. Unit Capacity Factor (Using MDC Net) 63.9 % 75.2 % 61.1 %
22. Unit Capacity Factor (Using DER Net) 63.6 % 74.8 % 58.8%
23. Unit Forced Outage Rate 0% 0% 19.7%
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Eacht:

Refueling outage scheduled to begin 3/9/85 and last 20 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
26. Units In Test Status IPrior to Commercial Operationl: Forecast Achiesed INITIAL CRITICALITY 1/14/77 INITIA L ELECTRICITY 1/30/77 COMMERCI A L OPER ATION 3/13/77 8503180254 850228 PDR \

ADOCK 05000302 19/771 k R pyg

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 60.-302 UNIT FLCR P-3 DATE 3/1/85 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTN February 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe Net) ( Mwe. Net ,

I 613 17 514 2 514 ig 513 3 568 39 497 4 560 496 20 ,

5 59? 21 496 6 586 33 4gg 7 568 23 475 8 551 24 458 9 546 481 25 10 566 26 448 555 11 27 448 543 12 33 453 13 545 39 14 535 30 15 530 3, 16 523 INSTRUCTIONS On this format.hst the aserage daily unit power leselin \lWe Net for each day in the reportine in.inth. Compute to the nearest whole megawatt.

eH77)

S UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-302 ,

UNIT NAME F LC R P-3 DATE 3/1/85 COMPLETED gy D. Graham REiM)RT MONTil 2/85 TELEPHONE (904) 795-3802 I

C. *a 3:J. O . h

% 2e j ~E 4 La.cemce e ('ause a Corrective W. Ihle ~?

U

$ Event g t, 8q Actnuttu i 4 .5 s7 EU

~$

  • g$ E E 5 g =!

e Report a !O v

Present Recurrence 6

85-02 850201 S 0.0 F 5 NA RC FUELXX End of fuellife. Reactor power coast-down.

I 2 3 4 I l'orced Reason: Methinl: Eshibit G . Instructions S Siheduled A-1 quipment Failure (Explaint I Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C. Refueling 3. Automatic Scram. Event Repose (LER) File INURI G-D. Regulatory Restriction 4-Other l E xplam) 0161) 1 -Operator Trainmg & l.icense I xamination F-Administ rative 5 G Opensional I stor (Explaml Inhibit I - Same Source l'8/77) ll-Olher IINplain n

, s'- .

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 3/1/85 COMPLETED BY S. Stewart TELEPHONE (904) 795-3802 MONTH February 1985

SUMMARY

STATEMENT: Crystal River 3 operated normally with no outages during the month. The plant operated at reduced power due to the end of cycle power coastdown.

e

.I

r e

fo 00I t a Power CO RPO R ATION March 7,1985 3F0385-06 Director Office of Inspection and Enforcement Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50 302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 February 1985 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 290.0 Atlanta, GA 30323 4

6?

9 1 I

GEN ERAL OFFICE 3201 Thirty fourth Street South. P.O. Box 14042. St. Petersburg, Florida 33733 813-866-5151