3F0285-08, Monthly Operating Rept for Jan 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1985
ML20112A619
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/31/1985
From: Graham D, Stewart S, Westafer G
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0285-08, 3F285-8, NUDOCS 8503180393
Download: ML20112A619 (6)


Text

. _ _ _ . _ . . . - __._. _ _ _ _ _ _ _ _ __ . _

.3 .

OPERATING DATA REPORT DOCKET NO.30-302 DAfg _1_mso -

COMPLETED SY n ri .ha rn TELEPHONE (904) 795-3802

OPERATING.57AIU.S '

i 1. Unit Nanw:

Crystal River Unit 3 Notes Please note correction

. 2. Reporting Period: 12/1/84 - 12/31/84 (circled) of gross

3. Licensed Thermal Power (MWt p: 2544 generation for December.

j 4. Nansepiste Rating (Gross MWe): 890

3. Design Electrical Rating (Net MWe): 82s

]

j 6. Maximum Dependable Capedty (Gross MWe): 860 i

7. Maximum Dependable Capa ty (Net MWe): 821
8. If Changes occur in Capselty Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons
NA i  ;

i '

i, NA i

9. Power Level To Which Restricted.lf2nygNet MWe):
10. Reasons For Restrictions.lf Any:

~-

This Month Yr.to.Dete Cumulative
11. Hours in Reporting Period 744 8784 68424
12. Number of Hours Reactor Was Critical 744 _

8346.5 45915.7

13. Rosetor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generstor On.Line 744 8298.8 44917.8

~

l$. Unit Reserve Shutdown Hours o o n I 16. Gross Thermal tnergy Generated (MWH) 1715240 19897K50 . 1018A1Aa5 17 Gross Electrical Energy Generated (MWH) C59765 D _

C 68000617 ( 347267977 ~

568890

~

18. Net Electrical Energy Generated (MWH) 6478928 32T96011
19. Unit Service Factor 100 % 94.5 % 65.6 %
20. Unit Aveliability Factor 100% 94.5 % 85.8%
21. Unit Capacity Factor (Using MDC Net) -

93.1 % 89.8% 60.7 %

22. Unit Capecity Factor (Using DER Net) Ot1% .__ -- AG AE -

An At

23. Unit Forced Outage Rete 0%

j j 24. Shutdowns Scheduled Over Next 6' Months IType. Date,and Duration of Each :

0.9% _

20.2 % ]

l Refuellne outare scheduled to berin h/9/95. anet tant 20 weelte.

i l 2$. If Shut Dow At End Of Report Period. Estimated Date of Startup: NA

26. Units la Test Status IPrior to Commerefal Operations: Forecast Achiesed

. INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY -

1/30/77 COMMERCIAL OPER ATION -

3/12/77 DOklgt ,ge . ,.,c ,

b \

1

. l OPERATING DATA REPORT DOCKETNO. 50-302 DATE 7 /1 M COMPLETED BY 3. Grabarn TELEPHONE 1904) 795-3802 OPERATING STATUS

1. Unit Name:

Crystal River Unit 3 Notei

2. Reporting Period: 1/1/85 - 1/31/85
3. Licensed Thermal Power (MW ): 2544
4. Namepiste Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): _ 9"
6. Maximum Dependable capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

NA

9. Power Level To Which Restricte41f1'n y Net MWe): NA
10. Reasons For Restrictions.If Any: A 4

1 This Month Yr to.Ds'e Cumulative

11. Hours in Reporting Period 744 744 ~69168
12. Number Of Hours Resetor Was Critical 744 744 46659.7

, 13. Reactor Reserve Shutdown Hour, 0 0 1280.3 l 14. Hours Generator On-Line 744 744 45661.8 j 15. Unit Reserve Shutdown Hours 0 _

0 0

16. Gross Thermal Energy Generated (MWH) 1571111 1571111 -

103232998 .

17. Gross Electrical Energy Generated (MWH) 550098 , , , 550098 35277315
18. Net Electrical Energy Generated (MWH) 521380 521380 _. 33517391-
19. Unit Service Factor 100 % 100 % 66.0%

l

20. Unit Availability Factor 100 % 100 % 66.0 %
21. Unit Capacity Factor (Using MDC Neti 85.4 % 85.4 % 61.0 %
22. Unit Capacity Factor (Using DER Net) 84.9 % 84.9 % 58.7 %  ;
23. Unit Forced Outage Rate 0% 0% 19.9% __
24. Shutdowns Scheduled Over Next 6 Mo.iths (Type. Dete.and Duration of Each):

Refueling Outage scheduled to begin 3/9/85 and last 20 Weeks.

25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA
26. Uniti In Test Status (Prior to Commerelal Operation): Forecast Achieved INITIAL CRITICALITY -

1/14/77 INITIAL ELECTRICITY . 1/30/77 COMMERCIAL OPERATION 3/13/77 (0/77)

/

l

- - _ - . 1

. AVERACE DA!LY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT PLORP-3 __

DATE 2/1/85 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH January 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net) (gwe. Net) 1 767 728 17 2 -

765 ,, 737 3 747 i, 698 4 728 -

20 -- 722 5 687 680 6 -- 730 -

22 693 7 715 08I 23 g 720 678 34 9

718 23 -- 665 I 704 10 -

26 662 706 11 27 __

649 12 728 23 641 13 716 632 39 _

14 730 30 625 is 724 3g 633 16 720

! INSTRUCTIONS i

On this format.hst the average daih uni: powei leselin MWe Net for cash day m the 'cri rting month.C. impute to the flearest whole megawJtt.

(UI77 3 3

I l /

..o-._.. - _ . _ .__ ._- - _ _ _ . _ - - _

l ..

i IBOCET NO. 02 - i UNIT SHU1 DOWNS AND F0WER REDUCDONS ,

UNIT NAME _ .CRP-3 DATE 2/4/85 COMPT ETED BY R- A Raeurart I

kEFORT MONTil 1/85 1Et.EFle0NE (904) 795-3802 i

  • ~:_
, .5 E 3g E Licenec [v, cLw raine a rue,eceive N.s. Ikage r. gg jg5 I: vent g,7 E 'S O

Actism to H wO

$E cE jis g Repast 't Picsent Recurrence 6

85-01 8581IS S 0.0 F 5 NA RC FUELXX End of f#rel life. Power coastdown began.

i l

l t

1 E . 3 4 F: Itwed Reasant: 80eelsud. Exhibst G . hiseractions 5: SIwdeded A-Fquspawee Faslose(Emplain) I-teasamal fin Prepasassun ed Dasa B-Maisstessace of Test 2-leanaal Scrasi. Ents) Skecis few livnice C-Itefeeling 3.Assuseussc Scrmen. Escal Repi=i tI.ER) Fue 4 NtlREG-D-Regulasexy lleseristion 4Otises (Explain 6 016Ii E-Operaisir Training & lxrnse Fxassimatiums F-Admenmarative 5 G4perational Eer.= (Emplaml Exinbis I- Some Soviec r8/77) IlCoher(Emplain)

=

~

MONTHLY OPERATIONAL SU.WJtY STATDGNI DOCKET No. 50-302 UNIT FLCRP-3 DATE 2/4/85 i

COMPLETED BY 5. A. Stewart TELEPHONE (904) 795-3802 MONTH January 1985 St.HMARY STATEMENT: Crystal River 3 operated normally with no outages during the month.

The plant began reducing power due to the end of cycle power coast-down.

I e

4 e

e 4

8

/

_ _ .. . . . _ _- ~ _ . - - - - _ _ _ _ _ _ _ - . -

N e *

.**),

$g . . . ,

p. .
  • kpffll .

Florida Power C O R P O A AT 10 N February 8,1983 3F0283-08 Mr. Richard C. DeYoung. Director Offlee of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20335

Subject:

Crystal River Unit 3 Docket No.30-302 Operating License No. DPR-72 Monthly Operating Report Dear S!rt Attached are twelve (12) copies of the Crystal River Unit 3 January 1983 Monthly Operating Report and corrected report for December 1984 These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely, G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attachments cc Dr. 3. Nelson Grace Regional Administrator, Region 11 Office of Inspection & Enforcement sts1GW33 oMGl# #3 g7[6 U.S. Nuclear Regulatory Commiss!on 101 Marietta Street N.W., Sulte 2900 Atlanta, GA 30323 certi j By 9 8 l

.-