3F0186-09, Monthly Operating Rept for Dec 1985

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1985
ML20137B364
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/31/1985
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Taylor J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0186-09, 3F186-9, NUDOCS 8601150291
Download: ML20137B364 (7)


Text

\\

i n OPERATING DATA REoORT

~

DOCKET NO.

50-302 DATE 1/9/R6 COMPLETED BY' D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS i

l. Unit Name.

Crystal River Unit 3 Notes

2. Reporting Period:

12/1/85 - 12/31/85

3. Licensed Thermal Power (MWt):

2544

4. Namepiste Rating (Gross MWe):

890 825

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

860 821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Ite.ns Number 3 Through 7) Since Last Report, Give Reasons:

NA NA

9. Power Level To Which Restricted,1f Any (Net MWe):
10. Reasons For Restrictions,if Any:

NA This Month Yr..to-Date Cumulative I1. Hours In Reporting Period 744 8760 77184

12. Number Of Hours Reactor Was Critical 605.9 4385.3 50301
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 603 4173 49090.8
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1393054 11746283 113408168
17. Gross Electrical Energy Generated (MWH) 486465 3014845 37742062 461639 2848661 35844672
16. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 81.0 %

47.6 %

63.6 %

20. Unit Availability Factor 81.0 %

47.6 %

63.6 %

21. Unit Capacity Factar (lising MDC Net) 75.6%

39.6%

58.3 %

22. Unit Capacity Factor (Using DER Net) 75.2%

39.4%

56.3 %

23. Unit Forced Outage Rate 19.0%

10.0%

19.4%

24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):

None i

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

NA

26. Units In Test Status (Prior to Commercial Operation):

Forecast Ach:eved L

INITIAL CRITICALITY I/I4/77 l

INITIAL ELEr n'ICITY I/30/77 COMMERCI/.t. OPER ATION

'./13/77 A

$[g 1

860A150291 851231 A

O 2

(9/77)

)

AVERAGE DAILY UNIT POWER LEVEL

,s

(_,I DOCKET NO.

50-302 UNIT F LC R P-3 DATE 1/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH Decembct.,1985 l

DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 1 791 17 787 782 2

gg 789 3

287 39 797 0

4 20 789 5

21 788 6

0 22 7RR 0

(

7 23 786 8

0 24 7R7 9

424 25 783 828 10 26 741 gg 587 661 27 778 12 7g3 13 784 29 782 790 14 3g 77g 0

15 33 792 16 790 l

INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

I(>

(9/77)

f p

f~h O

\\

50-302 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME F LC R P-3 DATE 1/3/86

^

COMPLETED BY S. A. Stewnct REPORT MONTH T2/R5 TELEPHONE (904) 795 't909 w.

E c

Licensee Ee, gw't Cause & Corrective jg 3

j E3 8

Action to No.

Date i

3g 2s5 Event p

gO y:

E y ;75 c Report #

mU Prevent Recurrence H

o u

e.

6 85-25 851203 F

141.0 A

3 85-028 ED CKTBRK Reactor trip caissed by the loss of the "B" 6900V Biss.

85-26 851210 F

0.0 A

5 NA IIC

!!TEXCII Redliced power to repair a salt water leak in the main condenser.

85-27 851227 F

0.0 A

5 NA IIC IITEXCII Redileed power for maintenance on the condenser ttibe cleaning system and repaired a salt water leak in the same waterbox.

I I

2 3

4 F: Forced Reason:

Method Exhibit G. Instructions for Preparation of Data S: Scheduled A-Equipment Failure (Explain)

B-Maintenance of Test

$_$,"ua! scram Entry Sheets for Licensee C-Refueling 3-Auto scram Event Report (LER) File iNURI G-D-Regulatory Restriction 4-continued 0161) 5-Reduced Load E-Operator Training & License Examination 9-Other F-Administrative 3

G-Operational Error (Explain)

Exhibit I - Same Source (9/77)

Il-Other (Explain)

I

MONTHLY OPERATIONAL

SUMMARY

STATEMENT O

DOCKET NO. 50-302 UNIT FLC RP-3 DATE 1/3/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH December.1985

SUMMARY

STATEMENT:

Crystal River 3 operated with one outage and two power reductions.

The unit remains load limited to approximately 92% full power due to steam generator (OTSG) fouling.

v) f f

~

f a

l

~

+

I OPERATING DATA REPORT

~

O DOCKET NO.

50-302 DATE 31-3-83 COMPLETED BY S.A. Stewart i

TELEPHONE (9041795-3802 OPERATING STATUS g, y,ge y Crystal River Unit 3 Notes Please note correct' ions 10-1 10-31-85 (circled) for October

2. % W.
3. Licensed ThennelPower(MWt):

2544 1985.

4. Namepiste Rating (Gross MWe):

890 825

5. Des %n Electrical Rating (Net MWe):
6. Mazimum P,

'M Cepecity (Gross MWe):

860 821

7. Manismen DependeMe Cepecity (Net MWe):
8. If Changes Occur he Capacity Ratings (Items Number 31hrough 7) Since Last Report, Give Reasons:

none

9. Power level To Which Restricted,If Any (Net MWe):

N/A le. Reasons For Restrictions,If Any:

N/A f

This Month Yr. to-Dete Cumuletive 745 7296 75720 ll. Hoursla Reporting Period I2. Number Of Hours Reactor Was Critical 687.4 3108.1 49023.8

[

33. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On-Lnne 613.5 2901.8 47819.6
15. Unit Reserve Shutdown Hours 0

0 0

1487965 5863476 107525361

16. Grom Therinel Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 6074D... C 10R9s %

C.3n716Ranl

18. Net Electrical Energy Generated (MWH)

(48182D (18753773 (34871388]

19. Unit Service Facto, 82.3 %

39.8%

63.2 %

20. Unit Availability Factor 813%

39.8%

63.296

23. Unit Capacity Factor (Using MDC Ne t)

( 78.89 0 31.3 %

G7.890 l

22. Unit Capacity Factor (Using DER Net)

(18 4% 7 M1.2%3 55.8 %

44%

8.6%

19.6 %

23. Unit Forced Outsee Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Dete and Duration of Eschi:

N/A N/A

25. If Shut Down At End Of Report Period, ated Date of Startup:
26. Units la Test Seetus (Prior o Commercial Operation):

Forecast Achieved

  • m tNITIAL CRITICALITY I-14-77 e

INITIAL ELECTRICITY 1-30'77 COMMERCIAL OPERATION 3-13-77 (9/77)

e OPERATING DATA REPORT

~

DOCKET NO. 50-302 DATE 17/1/A5 COMPLETED BY'D. Craham TELEPHONE 904 795-3802 1

OPERATING STATUS Notes The circled changes l.UnkNonw.

crvaemi River unie 3

2. Reporting Period:

11/1/85 - 11/30/85 are.lue to a correction

3. Licensed ThermelPower(MWt):

2544 the October 1985

4. Nameplete Rating (Grom MWe):

A40

5. Design Electrical Rating (Net MWe): J
6. Maaknam Dependable Capacity (Grom MWe):

860 9

7. Mambaum Dependable Capecky (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Renons:

NA

9. Power level To Which Restricted If Any (Net MWe):

NA

10. Reasons For Restrictions,If Any:

This Month Yr to Dele Cumulative

11. Hours la Reporting Period von anta ysan
12. Nussber Of Hours Reactor Was Critical 671.3 3779.4 49695.1
13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hows Generefor On-Line 668.2 3570 48487.8
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 4489753 10353229 112015114
17. Gross Electrical Energy Generated (MWH) 538751

( 252838 D

(' 37255597')

18. Net Electrical Energy Generated (MWH) 511645 (9an70993 C 35383033 )
19. Unit Service Factor 92.87.

44.s7.

_fg. 47,

20. Unit Availability Factor 92.87.

44.57.

63.47.

86.6%

36.3%

58.1%

21. Unit Capacky Factor (Using MDC Net)
22. Unit Capecity Factor (Using DER Net) 86.11 36.11 56.1%
23. Unit Forced Outage Rate 7.2%

8.37.

19.4%

34. Shutdowns Scheduled Over Next 6 Months (Type. Dete,and Duration of Each t:

MA.

i

25. If Shut Down At End Of Report Period. Estirnated Date of Startup:

NA

26. Units la Test States (Prior eo Commercial Operation):

Forecast Achieved INITIAL CRITICAL.ITY.

I/I4'/77 INITIAL ELECTRICITY 1/30/77-COMMERCIAL OPERATION 3/13/77 *

.s..

(9/77)

1 e

Power COR POR ATION January 7, 1986 3FO186-09 Mr. James M.

Taylor, Director Office of Inspection and Enforcement U.S.

Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DpR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 December 1985 Monthly Operating Report.

These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

/V

.V.

G.

R.

Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attarb- 'nts cc:

Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S.

Nuclear Regulattry Commission 101 Marietta Street N.W.,

Suite 2900 Atlanta, GA 30323 GEN ERAL OFFICE 3201 Thirty fourth street soutn. P.O. Box 14042, St. Petersbur0, Florida 33733 813-866 5151