i n

~

OPERATING DATA REoORT DOCKET NO. 50-302 DATE 1/9/R6  !

COMPLETED BY' D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS i

l. Unit Name. Crystal River Unit 3 Notes
2. Reporting Period: 12/1/85 - 12/31/85
3. Licensed Thermal Power (MWt):

2544

4. Namepiste Rating (Gross MWe): 890 ,
5. Design Electrical Rating (Net MWe): 825 '
6. Maximum Dependable Capacity (Gross MWe): 860
7. Maximum Dependable Capacity (Net MWe): 821
8. If Changes Occur in Capacity Ratings (Ite.ns Number 3 Through 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted,1f Any (Net MWe): NA
10. Reasons For Restrictions,if Any: NA This Month Yr..to-Date Cumulative .

I1. Hours In Reporting Period 744 8760 77184

12. Number Of Hours Reactor Was Critical 605.9 4385.3 50301
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hours Generator On-Line 603 4173 49090.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1393054 11746283 113408168  ;
17. Gross Electrical Energy Generated (MWH) 486465 ,_,

3014845 37742062

16. Net Electrical Energy Generated (MWH) 461639 2848661 35844672
19. Unit Service Factor 81.0 % 47.6 % 63.6 %
20. Unit Availability Factor 81.0 % 47.6 % 63.6 %
21. Unit Capacity Factar (lising MDC Net) 75.6% 39.6% 58.3 %
22. Unit Capacity Factor (Using DER Net) 75.2% 39.4% 56.3 %
23. Unit Forced Outage Rate 19.0% 10.0% 19.4%
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):

None ,

- i

25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA ,
26. Units In Test Status (Prior to Commercial Operation): Forecast Ach:eved L .

INITIAL CRITICALITY I/I4/77 l

  • INITIAL ELEr n'ICITY I/30/77 COMMERCI/.t. OPER ATION './13/77 A

1 860A150291 851231 $[g A O 2 (9/77)

)

AVERAGE DAILY UNIT POWER LEVEL

,s

(_,I DOCKET NO. 50-302 UNIT F LC R P-3 DATE 1/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH Decembct .,1985 l

DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1 791 17 787 2

782 gg 789 3 287 39 797 0 789 4 20 5 21 788 6 0 22 7RR 0 786

( 7 23 8 0 7R7 24 9 424 25 783 10 828 741 26 gg 587 27 661 778 7g3 12 ._

13 784 29 782 14 790 3g 77g 0

15 33 792 16 790 l INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

I *

(> (9/77)

f p f~h O \

. DOCKET NO. 50-302 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME F LC R P-3 DATE 1/3/86

^

COMPLETED BY S. A. Stewnct REPORT MONTH T2/R5 TELEPHONE (904) 795 't909 w.

-_ E c

- jg 3 j E3 Licensee Ee, gw't Cause & Corrective Action to No. Date i 3g & 2s5 Event p mU gO8 Prevent Recurrence H y: E y ;75 c

e.  !

Report #

u o

6 85-25 851203 F 141.0 A 3 85-028 ED CKTBRK Reactor trip caissed by the loss of the "B" 6900V Biss.

85-26 851210 F 0.0 A 5 NA IIC  !!TEXCII Redliced power to repair a salt water leak in the main condenser.

85-27 851227 F 0.0 A 5 NA IIC IITEXCII Redileed power for maintenance on the condenser ttibe cleaning system and repaired a salt water leak in the same waterbox.

I I 2 3 4 F: Forced Reason: Method Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) -

for Preparation of Data B-Maintenance of Test $_$,"ua! scram Entry Sheets for Licensee C-Refueling 3-Auto scram Event Report (LER) File iNURI G-D-Regulatory Restriction 4-continued 0161)

E-Operator Training & License Examination 5-Reduced Load 9-Other 3 F-Administrative G-Operational Error (Explain) Exhibit I - Same Source (9/77) Il-Other (Explain)

I

MONTHLY OPERATIONAL

SUMMARY

STATEMENT O DOCKET NO. 50-302 UNIT FLC RP-3 DATE 1/3/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH December.1985

SUMMARY

STATEMENT: Crystal River 3 operated with one outage and two power reductions.

The unit remains load limited to approximately 92% full power due to steam generator (OTSG) fouling.

v) f

~

f f

a l

~ .

+

' )

I OPERATING DATA REPORT

~

O DOCKET NO. 50-302 DATE 31-3-83 i

COMPLETED BY S.A. Stewart TELEPHONE (9041795-3802 OPERATING STATUS g, y,ge y . Crystal River Unit 3 Notes Please note correct' ions 10-1 10-31-85 (circled) for October

2. % W. 1985.
3. Licensed ThennelPower(MWt): 2544
4. Namepiste Rating (Gross MWe): 890
5. Des %n Electrical Rating (Net MWe): 825 ,
6. Mazimum P , 'M Cepecity (Gross MWe): 860
7. Manismen DependeMe Cepecity (Net MWe): 821
8. If Changes Occur he Capacity Ratings (Items Number 31hrough 7) Since Last Report, Give Reasons:

none

9. Power level To Which Restricted,If Any (Net MWe): N/A le. Reasons For Restrictions,If Any: N/A f

This Month Yr. to-Dete Cumuletive ll. Hoursla Reporting Period 745 7296 75720 I2. Number Of Hours Reactor Was Critical 687.4 3108.1 49023.8 0 0 1280.3

[ 33. Reactor Reserve Shutdown Hours

14. Hours Generator On-Lnne 613.5 2901.8 47819.6
15. Unit Reserve Shutdown Hours 0 0 0
16. Grom Therinel Energy Generated (MWH) 1487965 5863476 107525361 ,
17. Gross Electrical Energy Generated (MWH) 6074D ... C 10R9s % C.3n716Ranl
18. Net Electrical Energy Generated (MWH) (48182D (18753773 (34871388]

82.3 %

19. Unit Service Facto, 39.8% 63.2 %
20. Unit Availability Factor 813% 39.8% 63.296
23. Unit Capacity Factor (Using MDC Ne t) ( 78.89 0 31.3 % G7.890 l
22. Unit Capacity Factor (Using DER Net) (18 4% 7 M1.2%3 55.8 %

44% 8.6% 19.6 %

23. Unit Forced Outsee Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Dete and Duration of Eschi: .

. N/A '

25. If Shut Down At End Of Report Period, ated Date of Startup: N/A -
26. Units la Test Seetus (Prior o Commercial Operation): Forecast Achieved
  • m tNITIAL CRITICALITY I-14-77 e INITIAL ELECTRICITY 1-30'77 COMMERCIAL OPERATION 3-13-77 (9/77)

e

~

OPERATING DATA REPORT DOCKET NO. 50-302 DATE 17/1/A5 COMPLETED BY'D. Craham TELEPHONE 904 795-3802 <

1 OPERATING STATUS crvaemi River unie 3 Notes The circled changes l.UnkNonw.

2. Reporting Period: 11/1/85 - 11/30/85 are .lue to a correction 2544 the October 1985
3. Licensed ThermelPower(MWt):
4. Nameplete Rating (Grom MWe): A40
5. Design Electrical Rating (Net MWe): J
6. Maaknam Dependable Capacity (Grom MWe): 860
7. Mambaum Dependable Capecky (Net MWe): 9 _ _ _ _
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Renons:

NA

9. Power level To Which Restricted If Any (Net MWe): NA
10. Reasons For Restrictions,If Any:

This Month Yr to Dele Cumulative

11. Hours la Reporting Period von anta ysan  !
12. Nussber Of Hours Reactor Was Critical 671.3 3779.4 49695.1
13. Reactor Reserve Shutdown Hours 0 0 1280.3
14. Hows Generefor On-Line 668.2 3570 48487.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 4489753 10353229 112015114 .
17. Gross Electrical Energy Generated (MWH) 538751 , _ , ( 252838 D (' 37255597')
18. Net Electrical Energy Generated (MWH) 511645 (9an70993 C 35383033 )
19. Unit Service Factor 92.87. 44.s7. _fg . 47,
20. Unit Availability Factor 92.87. 44.57. 63.47.
21. Unit Capacky Factor (Using MDC Net) .

86.6% 36.3% 58.1%

, 22. Unit Capecity Factor (Using DER Net) 86.11 36.11 56.1%

23. Unit Forced Outage Rate 7.2% 8.37. 19.4%
34. Shutdowns Scheduled Over Next 6 Months (Type. Dete,and Duration of Each t: .

MA. ,

i

25. If Shut Down At End Of Report Period. Estirnated Date of Startup: NA >
26. Units la Test States (Prior eo Commercial Operation): Forecast Achieved INITIAL CRITICAL.ITY . I/I4'/77 *
  • INITIAL ELECTRICITY 1/30/77-COMMERCIAL OPERATION 3/13/77 *

.s ..

(9/77)

1 e

Power COR POR ATION January 7, 1986 3FO186-09 Mr. James M. Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DpR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 December 1985 Monthly Operating Report. These reports are submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

/V -

.V.

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attarb- 'nts cc: Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulattry Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 GEN ERAL OFFICE 3201 Thirty fourth street soutn. P.O. Box 14042, St. Petersbur0, Florida 33733 813-866 5151