3F0186-09, Monthly Operating Rept for Dec 1985
| ML20137B364 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/31/1985 |
| From: | Graham D, Westafer G FLORIDA POWER CORP. |
| To: | Taylor J NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 3F0186-09, 3F186-9, NUDOCS 8601150291 | |
| Download: ML20137B364 (7) | |
Text
\\
i n OPERATING DATA REoORT
~
DOCKET NO.
50-302 DATE 1/9/R6 COMPLETED BY' D. Graham TELEPHONE (904) 795-3802 OPERATING STATUS i
- l. Unit Name.
Crystal River Unit 3 Notes
- 2. Reporting Period:
12/1/85 - 12/31/85
- 3. Licensed Thermal Power (MWt):
2544
- 4. Namepiste Rating (Gross MWe):
890 825
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
860 821
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Ite.ns Number 3 Through 7) Since Last Report, Give Reasons:
NA NA
- 9. Power Level To Which Restricted,1f Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
NA This Month Yr..to-Date Cumulative I1. Hours In Reporting Period 744 8760 77184
- 12. Number Of Hours Reactor Was Critical 605.9 4385.3 50301
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Line 603 4173 49090.8
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1393054 11746283 113408168
- 17. Gross Electrical Energy Generated (MWH) 486465 3014845 37742062 461639 2848661 35844672
- 16. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 81.0 %
47.6 %
63.6 %
- 20. Unit Availability Factor 81.0 %
47.6 %
63.6 %
- 21. Unit Capacity Factar (lising MDC Net) 75.6%
39.6%
58.3 %
- 22. Unit Capacity Factor (Using DER Net) 75.2%
39.4%
56.3 %
- 23. Unit Forced Outage Rate 19.0%
10.0%
19.4%
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
None i
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Ach:eved L
INITIAL CRITICALITY I/I4/77 l
INITIAL ELEr n'ICITY I/30/77 COMMERCI/.t. OPER ATION
'./13/77 A
$[g 1
860A150291 851231 A
O 2
(9/77)
)
AVERAGE DAILY UNIT POWER LEVEL
,s
(_,I DOCKET NO.
50-302 UNIT F LC R P-3 DATE 1/3/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH Decembct.,1985 l
DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 1 791 17 787 782 2
gg 789 3
287 39 797 0
4 20 789 5
21 788 6
0 22 7RR 0
(
7 23 786 8
0 24 7R7 9
424 25 783 828 10 26 741 gg 587 661 27 778 12 7g3 13 784 29 782 790 14 3g 77g 0
15 33 792 16 790 l
INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
I(>
(9/77)
f p
f~h O
\\
50-302 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME F LC R P-3 DATE 1/3/86
^
COMPLETED BY S. A. Stewnct REPORT MONTH T2/R5 TELEPHONE (904) 795 't909 w.
E c
Licensee Ee, gw't Cause & Corrective jg 3
j E3 8
Action to No.
Date i
3g 2s5 Event p
gO y:
E y ;75 c Report #
mU Prevent Recurrence H
o u
e.
6 85-25 851203 F
141.0 A
3 85-028 ED CKTBRK Reactor trip caissed by the loss of the "B" 6900V Biss.
85-26 851210 F
0.0 A
5 NA IIC
!!TEXCII Redliced power to repair a salt water leak in the main condenser.
85-27 851227 F
0.0 A
5 NA IIC IITEXCII Redileed power for maintenance on the condenser ttibe cleaning system and repaired a salt water leak in the same waterbox.
I I
2 3
4 F: Forced Reason:
Method Exhibit G. Instructions for Preparation of Data S: Scheduled A-Equipment Failure (Explain)
B-Maintenance of Test
$_$,"ua! scram Entry Sheets for Licensee C-Refueling 3-Auto scram Event Report (LER) File iNURI G-D-Regulatory Restriction 4-continued 0161) 5-Reduced Load E-Operator Training & License Examination 9-Other F-Administrative 3
G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
Il-Other (Explain)
I
MONTHLY OPERATIONAL
SUMMARY
STATEMENT O
DOCKET NO. 50-302 UNIT FLC RP-3 DATE 1/3/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH December.1985
SUMMARY
STATEMENT:
Crystal River 3 operated with one outage and two power reductions.
The unit remains load limited to approximately 92% full power due to steam generator (OTSG) fouling.
v) f f
~
f a
l
~
+
I OPERATING DATA REPORT
~
O DOCKET NO.
50-302 DATE 31-3-83 COMPLETED BY S.A. Stewart i
TELEPHONE (9041795-3802 OPERATING STATUS g, y,ge y Crystal River Unit 3 Notes Please note correct' ions 10-1 10-31-85 (circled) for October
- 2. % W.
- 3. Licensed ThennelPower(MWt):
2544 1985.
- 4. Namepiste Rating (Gross MWe):
890 825
- 5. Des %n Electrical Rating (Net MWe):
- 6. Mazimum P,
'M Cepecity (Gross MWe):
860 821
- 7. Manismen DependeMe Cepecity (Net MWe):
- 8. If Changes Occur he Capacity Ratings (Items Number 31hrough 7) Since Last Report, Give Reasons:
none
- 9. Power level To Which Restricted,If Any (Net MWe):
N/A le. Reasons For Restrictions,If Any:
N/A f
This Month Yr. to-Dete Cumuletive 745 7296 75720 ll. Hoursla Reporting Period I2. Number Of Hours Reactor Was Critical 687.4 3108.1 49023.8
[
- 33. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Lnne 613.5 2901.8 47819.6
- 15. Unit Reserve Shutdown Hours 0
0 0
1487965 5863476 107525361
- 16. Grom Therinel Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 6074D... C 10R9s %
C.3n716Ranl
- 18. Net Electrical Energy Generated (MWH)
(48182D (18753773 (34871388]
- 19. Unit Service Facto, 82.3 %
39.8%
63.2 %
- 20. Unit Availability Factor 813%
39.8%
63.296
- 23. Unit Capacity Factor (Using MDC Ne t)
( 78.89 0 31.3 %
G7.890 l
- 22. Unit Capacity Factor (Using DER Net)
(18 4% 7 M1.2%3 55.8 %
44%
8.6%
19.6 %
- 23. Unit Forced Outsee Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Dete and Duration of Eschi:
N/A N/A
- 25. If Shut Down At End Of Report Period, ated Date of Startup:
- 26. Units la Test Seetus (Prior o Commercial Operation):
Forecast Achieved
- m tNITIAL CRITICALITY I-14-77 e
INITIAL ELECTRICITY 1-30'77 COMMERCIAL OPERATION 3-13-77 (9/77)
e OPERATING DATA REPORT
~
DOCKET NO. 50-302 DATE 17/1/A5 COMPLETED BY'D. Craham TELEPHONE 904 795-3802 1
OPERATING STATUS Notes The circled changes l.UnkNonw.
crvaemi River unie 3
- 2. Reporting Period:
11/1/85 - 11/30/85 are.lue to a correction
- 3. Licensed ThermelPower(MWt):
2544 the October 1985
- 4. Nameplete Rating (Grom MWe):
A40
- 5. Design Electrical Rating (Net MWe): J
- 6. Maaknam Dependable Capacity (Grom MWe):
860 9
- 7. Mambaum Dependable Capecky (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Renons:
NA
- 9. Power level To Which Restricted If Any (Net MWe):
NA
- 10. Reasons For Restrictions,If Any:
This Month Yr to Dele Cumulative
- 11. Hours la Reporting Period von anta ysan
- 12. Nussber Of Hours Reactor Was Critical 671.3 3779.4 49695.1
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hows Generefor On-Line 668.2 3570 48487.8
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 4489753 10353229 112015114
- 17. Gross Electrical Energy Generated (MWH) 538751
( 252838 D
(' 37255597')
- 18. Net Electrical Energy Generated (MWH) 511645 (9an70993 C 35383033 )
- 19. Unit Service Factor 92.87.
44.s7.
_fg. 47,
- 20. Unit Availability Factor 92.87.
44.57.
63.47.
86.6%
36.3%
58.1%
- 21. Unit Capacky Factor (Using MDC Net)
- 22. Unit Capecity Factor (Using DER Net) 86.11 36.11 56.1%
- 23. Unit Forced Outage Rate 7.2%
8.37.
19.4%
- 34. Shutdowns Scheduled Over Next 6 Months (Type. Dete,and Duration of Each t:
MA.
i
- 25. If Shut Down At End Of Report Period. Estirnated Date of Startup:
NA
- 26. Units la Test States (Prior eo Commercial Operation):
Forecast Achieved INITIAL CRITICAL.ITY.
I/I4'/77 INITIAL ELECTRICITY 1/30/77-COMMERCIAL OPERATION 3/13/77 *
.s..
(9/77)
1 e
Power COR POR ATION January 7, 1986 3FO186-09 Mr. James M.
Taylor, Director Office of Inspection and Enforcement U.S.
Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DpR-72 Monthly Operating Report
Dear Sir:
Attached are twelve (12) copies of the Crystal River Unit 3 December 1985 Monthly Operating Report.
These reports are submitted in accordance with Technical Specification 6.9.1.6.
Sincerely,
/V
.V.
G.
R.
Westafer Manager, Nuclear Operations Licensing and Fuel Management AEF/feb Attarb- 'nts cc:
Dr. J. Nelson Grace Regional Administrator, Region II Office of Inspection & Enforcement U.S.
Nuclear Regulattry Commission 101 Marietta Street N.W.,
Suite 2900 Atlanta, GA 30323 GEN ERAL OFFICE 3201 Thirty fourth street soutn. P.O. Box 14042, St. Petersbur0, Florida 33733 813-866 5151