MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4710 David B. Bice Acting Manager, Licensing Arkansas Nuclear One 2CAN050905 May 21, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Response to Request for Additional Information for the Request for Alternative - PRR-ANO2-2009-1 Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6
REFERENCES:
- 1. Entergy Letter to NRC dated March 20, 2009, Request for Alternative From the Requirements of ASME OM Code - 2004 Edition -
PRR-ANO2-2009-1 (2CAN030903)
- 2. Email from Alan Wang (NRC) to Robert W. Clark (Entergy), ANO-2 Request for Information Regarding Request for Alternative ANO-2 RR PRR-ANO2-2009-1 (ME0921), dated April 28, 2009
Dear Sir or Madam:
In Reference 1, Entergy Operations, Inc. (Entergy) proposed alternative PRR-ANO2-2009-1 for the Arkansas Nuclear One, Unit 2 (ANO-2) Inservice Testing (IST) Program. The proposed alternative pertains to parameters monitored in accordance with the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code requirements during the quarterly testing of the Low Pressure Safety Injection (LPSI) pumps. During the submittal review process, the Nuclear Regulatory Commission (NRC) determined that additional information was required in order to complete the review of the Entergy request. The Request for Additional Information (RAI) was transmitted to ANO-2 on April 28, 2009, via email (Reference 2). The response to the RAI is to be provided within 45 days of the email.
The attachment to this letter provides the response to the RAI.
This letter contains no new commitment.
2CAN050905 Page 2 of 2 If you have any questions, or require additional information, please contact me.
Sincerely, DBB/rwc
Attachment:
Response to RAI cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205
Attachment to 2CAN050905 Response to RAI
Attachment to 2CAN050905 Page 1 of 2 RESPONSE TO REQUESTS FOR ADDITIONAL INFORMATION By letter dated March 20, 2009, Entergy submitted a request for an alternative for the Arkansas Nuclear One, Unit 2 (ANO-2) Inservice Testing (IST) Program. The proposed alternative is to categorize the Low Pressure Safety Injection (LPSI) pumps as Group B during operation in Modes 1 through 4, and as Group A during Modes 5 and 6. This will allow for a reduction of monitored parameters during the quarterly on-line testing. This reduction of monitored parameters maintains an acceptable level of quality and safety. The NRC staff has reviewed the March 20, 2009, request and has determined that additional information is required to complete their review. Each portion of the Request for Additional Information (RAI) is listed below. The ANO-2 responses are listed directly after each RAI.
- 1. Please provide the most recent vibration data for the quarterly and comprehensive flow tests for each pump.
Vibration is measured at three points on each motor. These are east-west, north-south, and axial.
The latest quarterly vibration measurements (in inches per seconds) are provided below.
Pump 2P-60A Pump 2P-60B Motor Outboard #1 0.156 (West) 0.188 (East)
Motor Outboard #2 0.103 (North) 0.136 (South)
Axial (Top) 0.114 0.089 Date Data was Taken February 15, 2009 March 25, 2009 Comprehensive flow testing is not a requirement of the current Code of Record (ASME OM Part 6) for ANO-2. Flow testing is performed during outages using installed flow instrumentation in accordance with Generic Letter 89-04, Position 9. The flow during this full flow test was between 4250 and 4350 gallons per minute (gpm). Vibration measurements (in inches per seconds) were taken on March 29, 2008, during this full flow test.
Pump 2P-60A Pump 2P-60B Motor Outboard #1 0.113 (West) 0.079 (East)
Motor Outboard #2 0.108 (North) 0.112 (South)
Axial (Top) 0.027 0.024
Attachment to 2CAN050905 Page 2 of 2
- 2. Under the Flow Measurements Section, first paragraph, it is stated, flow measurement using portable flow measurement equipment would not be practical on a quarterly basis to achieve the required accuracy for Group A Testing. Please provide more information as to why using portable flow measurement equipment during quarterly testing is impractical.
The LPSI pumps are tested quarterly through an orificed minimum recirculation line designed to pass 100 gpm. The ultrasonic flow meter accuracy associated with the equipment available at ANO is +/- 2% of reading on pipe greater than 6 inches in diameter and +/- 5% on pipe less than 6 inches in diameter. The Code required accuracy for flow measurement is +/- 2% and there is no installed piping in the recirculation loop where portable flow measurement can be installed that is greater than 6 inches in diameter.
Therefore, to obtain the +/- 2% Code accuracy with portable flow measurement equipment, modification of the piping would be required. Also, calibration and repeatability factors increase the total flow meter error. Since quarterly pump differential pressure is trended, there is little value added by also monitoring variations in flow measurement or attempting to adjust recirculation flow to a specific value.
- 3. Under the Flow Measurements Section, second paragraph, it is stated ALARA and personnel safety issues would be eliminated by re-categorizing the pumps.
Please provide more information about the personnel safety issues that are incurred during Group A testing and the personnel dose reduction that would be achieved with the proposed alternative.
The location on the pump motor where the vibration data is collected is approximately 12 feet above the floor. There is a platform installed for pump 2P-60A that allows for easy and safe vibration data collection. There is no platform for pump 2P-60B. A step ladder must be used to collect the vibration data. Using the vibrations data collector takes two hands, one to operate the collector and one to hold the vibration probe. To safely use the ladder, the continuous use of three points of contact is required. Collecting vibration data on pump 2P-60B presents a challenge to this requirement.
The current dose rate at both LPSI pumps is 6-12 mrem/hour and the data collection takes less than one-half hour per pump. Four quarterly tests on each of the two pumps are assumed per year. The anticipated dose savings that would be achieved with the proposed alternative would be between 24 and 48 mrem/year. 24 mrem/year would be the dose savings using the minimum dose rate and the maximum stay time.